
64220, Rev. 1/April 2019
3M™ GMI™ PS200-LMP AUTO BUMP/CALIBRATION STATION
WARM-UP SEQUENCE
4-1
4. WARM-UP SEQUENCE
After power is applied, the ABC will perform a warm-up sequence lasting approximately 30 sec-
onds. During this time, the four LEDs will illuminate in the following sequence:
Figure 4-1: Warm-up Sequence (0-1 seconds)
Figure 4-2: Warm-up Sequence (1-24 seconds)
Figure 4-3: Warm-up Sequence (24-28 seconds)
Figure 4-4: Warm-up Sequence (28-29 seconds)
Figure 4-5: Warm-up Sequence (29-30 seconds)
Figure 4-6: Warm-up Sequence (30 seconds)