
43
3D SYSTEMS, INC
.
PN:80-D48 REV A
If validate, the remaining time before the start will be displayed:
The manufacturing will start at the end of the specified time if the current oxygen
value is under the
Oxygen limit value to produce
setting . If not, the start of the
manufacturing will be aborted and a windows error will appear :
Manufacturing launch warnings
After clicking on the button, if there are some warnings, the "Manufacturing
launch warnings" message will appear:
This is a warning information to indicate:
•
Lens cleaner filter timer compared to the recommended interval replacement,
•
Current oxygen value compared to the “Oxygen limit value to produce” setting,
•
Scanner head sensor state .
Fix them before continuing .
Click
Validate
launch the building process, on
Delay
to use the delay start function, or
Quit
to cancel .
To overcome O2 level variation around the fume safety setting, the job will start only if the O2 level is
lower than 90% of the fume safety setting .
Interrupt a job
During the manufacturing, it is possible to interrupt the job by clicking the pause button
. When activated:
•
The
Cycle interruption message
will be displayed .
•
The printer will finish the current layer sintering, will then proceed to the next layering cycle without sintering. The
operator will have to:
•
Click on to continue the job or,
•
Click on to completely stop the manufacturing .