3Com SuperStack II 3C16671A Скачать руководство пользователя страница 7

 

Products

 

SuperStack II Hub 10 is part of the SuperStack II range of 3Com 

 

products. Contact your supplier for the latest product information.

 

Hub 10 hubs

 

3C16670 SuperStack II Hub 10 12Port TP

 

3C16671 SuperStack II Hub 10 24Port TP

 

3C16672 SuperStack II Hub 10 24Port Telco

 

3C16665 SuperStack II Hub 10 6Port ST Fiber Optic 

 

Hub 10 management

 

3C16630A SuperStack II Hub 10 Management Module

 

3C16632 SuperStack II Hub 10 Advanced RMON Module

 

Transceiver Modules

 

Bulletin Boards

 

Management agent software upgrades are available from these 3Com 

 

bulletin boards.

 

Introduction

 

The Hub 10 24 Port TP is supplied with two mounting brackets and four 

 

screws. These are used for rack mounting and wall mounting the unit. 

 

When mounting the unit, you should take note of the guidelines given 

 

in 

 

 

Siting the Hub 10 24 Port TP

 

 

 overleaf.

 

Wall Mounting Hub 10 Units

 

CAUTION:

 

 Disconnect all cables from the Hub 10 unit(s) before 

 

continuing. Remove the self-adhesive pads from underside of 

 

the unit(s), if already fitted.

 

Fitting the brackets to wall mount one unit:

 

Place the Hub 10 unit the right way up on a hard, flat surface with 

 

the front facing towards you.

 

Locate a mounting bracket over the mounting holes on one side 

 

of the unit, as shown in figure 1 below.

 

Insert the two screws and fully tighten with a screwdriver.

 

Repeat the last two steps for the other side of the Hub 10 unit.

 

Fitting the brackets to wall mount two units:

 

Stack the Hub 10 units the right way up on a hard, flat surface 

 

with the front facing towards you.

 

Locate two mounting brackets over the mounting holes on one 

 

side of the units, as shown in figure 2 below.

 

Insert the three screws and fully tighten with a screwdriver.

 

Repeat the last two steps for the other side of the units.

 

To wall mount the Hub 10 unit(s):

 

Ensure that the wall you are going to use is smooth, flat, dry and sturdy. 

 

Attach a piece of plywood (12" x 20" x 0.5") securely to the wall if 

 

necessary, and mount the Hub 10 unit(s) as follows:

 

Position the unit(s) against the wall (or plywood) ensuring that 

 

the ventilation holes face sideways. Mark on the wall the position 

 

of the screws holes for both wall brackets. Drill the four holes.

 

Using suitable fixings and screws (not provided), attach the unit(s) 

 

securely to the wall (or plywood).

 

Reconnect all cables.

 

Rack Mounting Hub 10 Units

 

The Hub 10 24 Port TP is 1U high and will fit a standard 19inch rack.

 

CAUTION:

 

 Disconnect all cables from the Hub 10 unit before 

 

continuing. Remove the self-adhesive pads from underside of 

 

unit, if already fitted.

 

Place the unit the right way up on a hard, flat surface with the 

 

front facing towards you.

 

Locate a mounting bracket over the mounting holes on one side 

 

of the unit, as shown in figure 3 below.

 

Insert the two screws and fully tighten with a suitable screwdriver.

 

Repeat the two previous steps for the other side of the unit.

 

Insert the unit into the 19" rack and secure with suitable screws 

 

(not provided).

 

Reconnect all cables. 

P

RODUCTS

 

AND

 B

ULLETIN

 B

OARDS

 

3C12060 Female AUI

 

3C12065 Fiber Optic (ST)

 

3C12063 TP

 

3C12066 Coaxial

 

3C12064 Fan Out (male AUI)

 

3C12067 FB

 

3C16060 Bridge MicroModule

 

Australia

 

(61) (2) 9955 2073

 

Japan

 

(81) (3) 3345 7266

 

France

 

(33) (1) 69 86 69 54

 

Singapore

 

(65) 534 5693

 

Germany

 

(49) (89) 627 32 188

 

or 627 32 189

 

Taiwan

 

(886) (2) 377 5838

 

Hong Kong

 

(852) 2537 5608

 

U.K.

 

(44) (1442) 438278

 

Italy

 

(39) (2) 273 00680 

 

(fee required)

 

U.S.

 

(1) (408) 980 8204

3Com Corporation
P.O. Box 58145
5400 Bayfront Plaza
Santa Clara
CA 95052-8145
USA

c/o 3Com Centre
Boundary Way
Maylands Park South
Hemel Hempstead
Herts HP2 7YU
England

R

ACK

 M

OUNTING

 K

IT

 I

NSTRUCTIONS

Содержание SuperStack II 3C16671A

Страница 1: ...s must be used to ensure compliancewith these standards Environmental EN 60068 IEC 68 Width 440mm 17 3 ins Depth 224mm 8 8 ins Height 44mm 1 7 ins or 1U Weight 2 7kg 5 9lb Mounting free standing or 19...

Страница 2: ...ne peut pas tre mise en marche des sources de courant IT Imp dance la terre Si vos sources de courant sont de type IT cette unit doit tre aliment e par 230V 2P T via un rapport de transformation d iso...

Страница 3: ...all TP ports on the unit will be disabled during power up until they are correctly configured and enabled by management software This is only necessary on units which have ports assigned as standby St...

Страница 4: ...dule port If this LED does not flash there are no packets being received by the unit 8 Collision LED The Collision LED flashes yellow when a packet collision has been detected on a segment connected t...

Страница 5: ...units together Do not use two cables to connect any two units to each other they will not work if you do this Disconnect power from all units that will form part of the new stack Connect the male hub...

Страница 6: ...tin Boards The upgrade includes instructions on how to load the agent Managing with an FMS Management Module Managing with a Hub 10 Management Module 3C16630A or a Hub 10 Advanced RMON Module 3C16632...

Страница 7: ...river Repeat the last two steps for the other side of the units To wall mount the Hub 10 unit s Ensure that the wall you are going to use is smooth flat dry and sturdy Attach a piece of plywood 12 x 2...

Страница 8: ...S MISUSE NEGLECT IMPROPER INSTALLATION OR TESTING UNAUTHORIZED ATTEMPTS TO REPAIR OR MODIFY OR ANY OTHER CAUSE BEYOND THE RANGE OF THE INTENDED USE OR BY ACCIDENT FIRE LIGHTNING OR OTHER HAZARD Limit...

Отзывы: