360
C
HAPTER
13: E
STABLISHING
ATM C
HANNELS
Figure 18
Signaling Message Sequence for a Point-to-Point Connection
Point-to-Multipoint Connection
Figure 19 shows the sequence of signaling messages for setting up a
point-to-multipoint external link (connection) between a root station and
a set of destinations (leaves) by signaling.
From the Calling Party to The Enterprise ATM Switch:
The calling edge
device initiates the establishment of a connection to the first destination
leaf by sending a SETUP message that contains the connection
characteristics except for VPI/VCI. The SETUP message also contains a
point-to-multipoint flag. The connection to the first leaf proceeds as in a
point-to-point connection.
The connection to the second destination leaf is initiated by an ADD
PARTY message. The switch then establishes the connection with the
second leaf as if it were a point-to-point connection. When the
connection is complete, the switch sends an ADD ACKNOWLEDGE
message to the root station.
Содержание CoreBuilder 9000
Страница 18: ......
Страница 36: ...36 CHAPTER 1 OVERVIEW...
Страница 44: ......
Страница 152: ...152 CHAPTER 6 MANAGING NETWORK INTERFACES...
Страница 224: ...224 CHAPTER 8 VIEWING STATISTICS...
Страница 306: ......
Страница 320: ...320 CHAPTER 10 ATM NETWORK BASICS...
Страница 332: ...332 CHAPTER 11 NETWORK INTERFACE MANAGEMENT...
Страница 348: ...348 CHAPTER 12 E IISP PROTOCOL...
Страница 374: ...374 CHAPTER 14 ATM SWITCHING...
Страница 410: ...410 CHAPTER 16 TRAFFIC MANAGEMENT...
Страница 426: ......
Страница 450: ...450 APPENDIX D TECHNICAL SUPPORT...
Страница 454: ...454 GLOSSARY...