The Power-up Sequence
25
Figure 8
Installation completed 2
The Power-up
Sequence
The following sections describe how to powered-up your Switch 4200G
and prepare it for operation.
Powering-up the
Switch 4200G
To power up the switch, perform the following steps:
1
Plug the power cord into the power socket at the rear of the switch.
2
Plug the other end of the power cord into your power outlet.
The Switch powers-up and runs through its Power On Self Test (POST),
which takes approximately one minute.
Checking for Correct
Operation of LEDs
During the Power On Self Test, all switch ports are disabled and the LEDs
light up. The PWR LED flashes green during the POST.
When the POST has completed, check the PWR LED to make sure that
your switch is operating correctly. Table 6 shows possible LED colors.
Screw 1: Fix the rear bracket to the mount
angle.
Mount screw 2 to the switch.
Screw 2
Screw 1
Rear mount angle
Rear bracket
Screw 2
Screw 1
Rear mount angle
Rear bracket
10014914_AB_Switch 4200G.book Page 25 Tuesday, October 2, 2007 12:13 PM
Содержание 4200G Series
Страница 4: ...10014914_AB_Switch 4200G book Page 4 Tuesday October 2 2007 12 13 PM ...
Страница 8: ...8 CONTENTS 10014914_AB_Switch 4200G book Page 8 Tuesday October 2 2007 12 13 PM ...
Страница 12: ...12 ABOUT THIS GUIDE 10014914_AB_Switch 4200G book Page 12 Tuesday October 2 2007 12 13 PM ...
Страница 36: ...36 CHAPTER 2 INSTALLING THE SWITCH 10014914_AB_Switch 4200G book Page 36 Tuesday October 2 2007 12 13 PM ...
Страница 62: ...62 CHAPTER 4 PROBLEM SOLVING 10014914_AB_Switch 4200G book Page 62 Tuesday October 2 2007 12 13 PM ...
Страница 66: ...66 APPENDIX A PIN OUTS 10014914_AB_Switch 4200G book Page 66 Tuesday October 2 2007 12 13 PM ...
Страница 70: ...70 APPENDIX B TECHNICAL SPECIFICATIONS 10014914_AB_Switch 4200G book Page 70 Tuesday October 2 2007 12 13 PM ...
Страница 78: ...78 APPENDIX D 3COM NETWORK MANAGEMENT 10014914_AB_Switch 4200G book Page 78 Tuesday October 2 2007 12 13 PM ...