background image

10

11

2VV.

 Creating innovative solutions for you and your business since 1995.

ver.2 09-12-19

6. INSTALLATION

6.1-3 CEILING INSTALLATION

Ceiling installation of 

SAVANA

 Heat units is made on 

threaded rods M8. Threaded rods are optional acces-

sories and must be ordered separately

For any manipulation with the heater unit, protective 

gloves must be used to avoid injury by sharp edges. 

6.1-3.1 Allocate the ceiling  

installation point

6.1-3.2 Install the unit on the ceiling

must be fixed firmly to the ceiling! Use quality  

connecting material for anchoring!

B

A

Type

A

B

SAV-2

508

483

SAV-4

708

683

SAV-6

808

783

Dimensions in the table are in mm

4x  10

Содержание SAVANA INOX Plus

Страница 1: ...ver 2 09 12 19 SAVANA INOX Plus INSTALLATION AND OPERATION P03 0109 0315 01 EN...

Страница 2: ...for correct connection of the ventilation unit Before connect ing the unit please read and follow all the instructions below The manufacturer reserves the right to make changes including the technica...

Страница 3: ...e unit and report the fault to the supplier immediately After unpacking please check the condition of the heater unit and other accessories In case of doubt con tact your supplier Never install damage...

Страница 4: ...ARTS 4 DIMENSIONS Water exchanger Fan Heater body A D B C Air flow direction Exhaust various Types Heater body without cover Type A B C D SAV 2 AC 555 555 350 100 SAV 4 AC 755 755 350 100 SAV 6 AC 855...

Страница 5: ...ating innovative solutions for you and your business since 1995 ver 2 09 12 19 4 DIMENSIONS B A Dimensions of the attachment Type A B SAV 2 508 483 SAV 4 708 683 SAV 6 808 783 Dimensions in the table...

Страница 6: ...water in the exchanger Hot water exchanger made from Cu Al is designed for max operating temperature of water 110 C and max operating pressure 1 6 MPa Dimensions of brackets Dimensions in the table ar...

Страница 7: ...5 Heater unit may be installed on the wall or ceiling It must be operated in indoor covered and dry premises with the ambient temperature from 5 C to 35 C and relative humidity up to 90 Heater unit is...

Страница 8: ...is an optional accessory of the heater units and must be ordered separately For any manipulation with the heater unit protective gloves must be used to avoid injury 6 1 2 1 Allocate the wall installat...

Страница 9: ...r screws to the heater and leave holders space for holder insertion ca 1 3 of the screw length 3 Put the unit on holders and screw it in 4 Screw lower screws on pad and check tightness of all screws 6...

Страница 10: ...ptional acces sories and must be ordered separately For any manipulation with the heater unit protective gloves must be used to avoid injury by sharp edges 6 1 3 1 Allocate the ceiling installation po...

Страница 11: ...the area of water installations who is required to follow standards and regulations in force Water inlet and outlet positions are marked on the heater unit shell Maximum water temperature is 110 C Max...

Страница 12: ...terminal board for the connection cable in the fan box L L N N 1 230V PE PE PE N L Your partner in ventilation SAVANA SAV L N PE L N PE 1 230V Wiring diagrams for the control system are provided in t...

Страница 13: ...supply phases to the heater unit must be connected through a protective power circuit breaker of corresponding current and type Distances between disconnected contacts must be higher than 3 mm The he...

Страница 14: ...unit is switched off Failing that there is a risk of reduced service life of the motor or its damage Should this procedure not be observed a claim regarding possible motor damage will not be admitted...

Страница 15: ...ly Whether the heater unit is duly covered Whether the regulation is connected correctly 7 1 ACTIVATION Verify basic functions of the device fan operation heating by first activation Verify other poss...

Страница 16: ...V 2 1 SAV 4 FI PYTEL KRUH G2 SAV 4 1 SAV 6 FI PYTEL KRUH G2 SAV 6 1 1 3 2 4 7 3 FILTER INSTALLATION Dust filters may be added to units It is a special filtration medium from synthetic fibres KS 15 60...

Страница 17: ...is necessary to wear protective gloves to avoid injury from sharp edges spanner size 10 mm vacuum cleaner hand brush rag non aggressive cleaning agent soap water It is recommended to carry out period...

Страница 18: ...R UNITS It is recommended to carry out periodic checks of the unit after each 500 hours of operation and also before and after the heating season water exchanger contamination check fan condition chec...

Страница 19: ...evice are not fully open Open fully the stop valves Damaged fan bearings Impeller shows clearance or cannot rotate freely It is necessary to dismantle the fan and replace bearings in an authorised ser...

Страница 20: ...ering a service intervention it is necessary to provide fault specification unit type on the label and place of installation 10 2 PRODUCT DISCHARGE FROM OPERATION DISPOSAL Before you discard the produ...

Страница 21: ...the unit it is necessary to read this manual and comply with the above mentioned For any inquiry or request for explanation please do not hesitate to contact our business department or the department...

Страница 22: ...urer is not responsible for damage incurred to the equipment due to unprofessional installation and operation which is contrary to the operating manual and usual conventions for installation and opera...

Отзывы: