
Current consumption [A]
Available power output [W]
2
24
3
36
Combined Power Supply
2N Access Unit QR
can be fed from an external power supply and PoE at the same time. In this configura-
tion, the maximum power for the connected modules is available.
Power Supply Installation
Stand-alone access unit power supply installation
1.
Place the
2N Access Unit QR
on the flush mounting box / pre-drilled holes with dowels and pull the
cables through the bottom holes. Pull the Ethernet cable through the bottom hole to the left if necessary.
2.
Insert the metal fitting elements up and down and screw the access unit tight. You can level the unit
slightly in this mounting type.
Electric Installation Preparation
1.
Unscrew the second module blind on the main unit base.
2.
Use a flat screwdriver to take out the second module blind.
2-Module Electric Installation
1.
Place the 2-module base on the flush mounting box / predrilled holes with dowels and pull the power
cables through the bottom holes.
2.
Insert the metal fitting elements up and down and screw the base plate tight. You can level the base
slightly if you are mounting just one base.
3-Module Electric Installation
1.
Unscrew the blind on the extending 1-module.
2.
Use a flat screwdriver to take out the blind.
3.
Slide the 1-module to the 2-module base and secure its position with small side wedges and screws.
4.
Remove the microphone from the 2-module and loosen its cable.
5.
Lead the microphone (as shown in the
mechanical installation (p. 32)
figures) into the 1-module base.
6.
Place the joined bases on the flush mounting box / predrilled holes with dowels and pull the cables
through the bottom holes. Feed the Ethernet cable without the connector from the extending base to the
2-module base if necessary.
Electric Installation of Multiple Modules Next to Each Other
1.
Unscrew the blinds of the extending bases and take them out using a flat screwdriver.
2.
Slide the bases into each other as projected and secure their positions with small side wedges and
screws.
3.
Place the cover on the flush mounting box / predrilled holes with dowels and pull the cables if any
through the bottom holes.
4.
Pull the bus using the cable bushing available in the flush mounting box.
Installation
97
Содержание Access Unit QR
Страница 1: ...2N Access Unit QR User Manual...
Страница 34: ...1 Module Installation Installation 34...
Страница 35: ...Box Installation Installation 35...
Страница 36: ...CAUTION When the walling material has hardened break off the side stops Installation 36...
Страница 38: ...1 Module Installation into Box Installation 38...
Страница 39: ...Installation 39...
Страница 40: ...2 Module Installation Installation 40...
Страница 41: ...Box Installation Installation 41...
Страница 42: ...CAUTION When the walling material has hardened break off the side stops Installation 42...
Страница 44: ...2 Module Installation into Box Installation 44...
Страница 46: ...3 Module Installation Installation 46...
Страница 47: ...Box Installation Installation 47...
Страница 48: ...CAUTION When the walling material has hardened break off the side stops Installation 48...
Страница 50: ...Installation of Multiple 3 Module Boxes Next to Each Other Installation 50...
Страница 51: ...Installation 51...
Страница 52: ...Installation 52...
Страница 53: ...3 Module Installation into Box Installation 53...
Страница 56: ...1 Module Installation Installation 56...
Страница 57: ...Box Installation Installation 57...
Страница 59: ...1 Module Installation into Box Installation 59...
Страница 61: ...2 Module Installation Installation 61...
Страница 62: ...Box Installation Installation 62...
Страница 64: ...Installation of Multiple 2 Module Boxes Next to Each Other Installation 64...
Страница 65: ...Installation 65...
Страница 66: ...Installation 66...
Страница 67: ...2 Module Installation into Box Installation 67...
Страница 69: ...3 Module Installation Installation 69...
Страница 70: ...Box Installation Installation 70...
Страница 72: ...3 Module Installation into Box Installation 72...
Страница 76: ...1 Module Installation Installation 76...
Страница 77: ...Installation 77...
Страница 79: ...2 Module Installation Installation 79...
Страница 80: ...Installation 80...
Страница 82: ...Installation of Multiple 2 Modules Next to Each Other Installation 82...
Страница 83: ...Installation 83...
Страница 85: ...Installation 85...
Страница 86: ...Installation 86...
Страница 88: ...Installation of Multiple 3 Modules Next to Each Other Installation 88...
Страница 89: ...Installation 89...
Страница 90: ...Installation 90...
Страница 92: ...On uneven wall Installation 92...
Страница 93: ...On glass The backplate for uneven surfaces can also be used for installation on glass Installation 93...
Страница 94: ...Installation 94...
Страница 98: ...Device Connectors Figure 1 Main unit connector wiring Installation 98...
Страница 117: ...Troubleshooting Refer to faq 2n cz for the most frequently solved problems Troubleshooting 117...
Страница 128: ...2N Access Unit QR User Manual 2N Telekomunikace a s 2024 2N com...