2C Frame IT Cinema
Flocked Frame Screen
Installation Manual
For more information please go to
www.2cdisplays.com.au
or call 1300 730 025
2C_FrameIT_Cinema_Flocked_Mar11_v1.1
Protecting Your Screen:
• Keep away from direct sunlight or
high temperatures.
• Examine both the front and back surfaces
before retracting into the case to make sure it is
free of dust, dirt, insects or other foreign matter.
• Use a soft brush or cloth to lightly remove any
foreign particles.
Cleaning Your Screen:
• Do not use any solvents, chemicals or abrasive
cleaners on the screen surface.
• Use a mild detergent with warm water to
remove any marks on the surface or
screen case.
• Always immediately dab the screen with a soft
cloth to avoid soap marks.
• Do not scrub the surface.
Warranty: 12 Months
Happy Viewing!
There is a locking latch on the bottom wall mount only. (Fig 16)
Step 6
Up Bracket
Bottom Bracket
Secure Button
(Fig 16)
Fix the mounts onto the wall separately. (Fig 17-18)
(For 95” - height (h) = 1260mm & 105” - height (h) = 1430mm).
Step 7
Up Bracket
Bottom Bracket
h
(Fig 17)
(Fig 18)
Hook screen onto the top mount and bottom mount. (Fig 19-20)
Step 8
(Fig 19)
(Fig 20)
To uninstall the screen, please press the latch towards the
wall to release bottom frame from bottom mount, then lift the
screen a little to release it totally from top and bottom groove
of the mounts. (Fig 21-22)
Step 9
(Fig 21)
(Fig 22)