background image

0

 

 

 

 

 

 

 

 

 

 

X Cube Lift 

Model: XCU 190 

    XCU 180 

Installation Instructions 

 

 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for XCU 180

Page 1: ...0 X Cube Lift Model XCU 190 XCU 180 Installation Instructions ...

Page 2: ...tions 4 Dimensions 5 Installation Instructions 1 Preliminary Checking 6 2 Guidelines for Installations 6 3 Installation on Ceiling 7 4 Connecting to Power Supply 9 5 Installation of Projector 9 6 Cable Management 10 7 Installation of Lower Ceiling Cover 10 8 Adjusting the positions 11 9 Optional Accessories 15 The information in this manual is subject to change without any prior notice Updated on ...

Page 3: ...nstalled at the ceiling before operating 4 Please do not allow children or mental disability person to operate the equipment 5 Do not install the lift on adjacent ceiling or light fixture 6 Entire bottom of the lift must be unobstructed to allow proper operation 7 The lift must be installed in level from front to back and side to side 8 Please do not attach any projector with the weight above maxi...

Page 4: ...rom heated surface 4 Please turn off power supply or unplug before cleaning or servicing THE X CUBE LIFT Overview The lift is powered by a tubular motor which is operated on Single phase 230 240 V AC with the convenience of a remote setting controller with 3 programmable positions at ceiling or store level projection level and maintenance level It provides attractive solution to recess a projector...

Page 5: ...onsumption 100 W 100 W Voltage 230 240V AC 50 Hz 230 240V AC 50 Hz Rated Current 0 5 A 0 5 A Max Travel Distance 1500 mm 1500 mm Projector Cage W x D x H 550 x 550 x 250 mm 450 x 510 x 200 mm Exploded view of the X Cube Lift Mounting hole Mount to the ceiling Adjustable Ceiling Mounting Bar Ceiling Cover Projector Cage Lift Housing Ceiling Cover frame Scissor arms Steel wire robe ...

Page 6: ...5 Dimensions A mm B mm C mm D mm E mm F mm XCU 190 700 640 525 680 570 12 XCU 180 660 600 330 640 530 12 ...

Page 7: ...e lift to install at ceiling is 950mmWx850mmDx650mmH for XCU 190 and 900mmWx800mmDx450mmH for XCU 180 The installer must be accessible to every sides of the lift in order to install it 5 Check the dimensions of the projector to be mounted within the available space 6 Determine the projector installation position based on projection screen location and projector specifications 7 Confirm that there ...

Page 8: ...f the lift and the projector Reinforce the structure as required before installing the lift 1 Please check that the ceiling has enough space to mount the lift 2 No mounting material is provided Please use suitable anchors and fasteners base on the ceiling type 3 Mount two adjustable ceiling mounting bars to the ceiling In case the ceiling has limited space the installer has the option to mount the...

Page 9: ...xtend more than 2 600mm If the rods need to extend more than 2 please use the cross bracing to enhance the stability 8 Use the threaded locking compound angle nuts to prevent swinging 9 Adjust the threaded rods length to get the proper height 10 Adjust the nuts at treaded rods to level the lift 11 Check that the lift is leveled from front to back and side to side 12 A minimum size of opening on fa...

Page 10: ...The recommended cable size is 1 5mm2 16AWG The power supply has to connect to the building wires and a disconnection means must be provided in accordance with the wiring rules 5 Installing Projector 1 Prior to the installation of projector the lift should be checked for proper operation 2 Check the dimensions of the projector for proper operation within the available space 3 The projector should b...

Page 11: ...ver 1 The ceiling cover is fixed at the underside of the lift which normally greater in size and serve as platform to receive all types of ceiling materials The lift must be lowered down in order to fix the ceiling cover frame 2 The four angle bars will serve as the ceiling cover frame Fig below 3 Please use M5 Screw x8 to fix the ceiling cover frame and the lift housing 4 The ceiling cover is set...

Page 12: ...y if continuous operated for more than 4 minutes If such things happen please wait for the motor to cool down and restart it again The hand held transmitter remote control is paired with the lift in factory the transmitter will not communicate with other lift by default The lift is preset with Upper Stored Position and Lower Service Position limits UP button DOWN button MY button SHOW button Progr...

Page 13: ... To delete the limit setting of this position press the UP and DOWN button simultaneously until the lift begins to move briefly up and down 2 to 3 seconds c Adjust the lift to the require position while the UP or DOWN key are pressed holding period OR d Press and hold the STOP button until the lift begin to move briefly up and down the new position is recorded 2 to 3 seconds ...

Page 14: ...top at the position preset by the factory b To delete the limit setting of this position press the UP and DOWN button simultaneously until the lift begins to move briefly c Adjust the lift to the require position while the UP or DOWN key is pressed holding period OR d Press and hold the STOP button until the lift begins to move briefly up and down the new position is recorded ...

Page 15: ...topped in the position before setting more than 4 seconds c To delete the intermittent position that previously recorded press STOP button the lift will travel to the position that recorded d Press and hold the STOP button until the lift begins to move briefly up and down the intermittent position is deleted e Repeat step a and b to record the new position The Upper position Store Level intermedia...

Page 16: ...ontact Transmitter will be needed a Please refer the wiring diagram shown below to connect the dry contact transmitter Note The dry contact transmitter doesn t need to connect to motor They will interact each other by means of radio frequency b The UP or Down positions are achieved when the up or down inputs or are connected with the common input C The intermittent position is achieved when the th...

Page 17: ... the three positions are correctly recorded by pressing UP DOWN and STOP buttons on hand held transmitter remote control e Press and hold the Programming button at the back of the hand held transmitter remote control until the lift begins to move briefly Dry Contact Transmitter ...

Page 18: ...hree positions are memorized by the Dry Contact Transmitter which automically quits its programming mode NOTE TO PROGRAMMER i Please program AMX or Crestron contact closure to trigger the lift by pulse only ii Please do not hold the contact closure for more than 3 seconds the record will be deleted Programming button PROG button ...

Page 19: ...egins to move briefly b Press and hold PROG button on back of the wall switch until the lift begins to move briefly The setting is memorized by wall switch NOTE Please visit the following link for video instructions on XLT scissor lift limit settings The procedure to reset the limit setting for X Cube lift is the same as that of scissor lift http www youtube com watch v AfSyawTEtKU UP button DOWN ...

Page 20: ...with dry contact transmitter where manual override of control system is required XLT wall switch front XLT wall switch back Please refer the diagram below to connect XLT wall mount switch and dry contact transmitter UP button switch SHOW button switch DOWN button switch ...

Page 21: ...20 XLT wall mount switch Dry Contact Transmitter ...

Reviews: