manualshive.com logo in svg
background image

 

Info 

Content 

Superpro

 

SB0X User Manual

 

Rev. 03 

 User Manual

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

手册信息

 

Keywords 

Vision

,  SB02&05&05X&05E&05EX, V8

SP7500 

 

Abstract 

This document describes the  programming  system from XELTEK 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Содержание Superpro SB02

Страница 1: ...1 Info Content Superpro SB0X User Manual Rev 03 User Manual 手册信息 Keywords Vision SB02 05 05X 05E 05EX V8 SP7500 Abstract This document describes the programming system from XELTEK ...

Страница 2: ... reserved User Manual Rev 03 5th MAY 2020 2 of 200 编辑日志 01 2018 11 27 Initial Edit 04 1 02 2019 05 01 Second Edit 04 2 03 2020 05 21 Third Edit 04 3 More information Welcome to visit our website http www xeltek cn com Emails for more information Sales02 xeltek cn com ...

Страница 3: ...lay interface real time display of UPH and work order status 7 3 3 SB0X Specifications 7 3 3 1 Tool Bars 7 3 3 2 I O settings 7 3 3 3 Configuration settings 8 3 3 4 Positioning settings 8 3 3 5 Camera and Vision Check 11 3 3 6 Automatic programming 12 3 3 7 Reports 12 3 3 8 Connect 12 4 Introduction of the mechanical system 13 4 1 System composition 13 4 1 1 Total power supply and load switch 13 4...

Страница 4: ...at the machine is in normal condition and turn on the switch to on state Waiting for the industrial computer ready Press the control buttons on the front panel respectively for the system button and programmer control button Open the application SB0X and SP7500 to enter debugging or working status Power off End the session and move the mechanic arms to the home point then Turn off the applications...

Страница 5: ...Open SB0X click on connect the SB0X and SP7500 Step3 Edit the IO set the input and out of components tray and tape are available Step4 Go to configuration setting set the orientations if need Step5 Go to positioning setting set the positions and heights of the sockets or IIO cells Step6 Go to automatic sessions start Tips All the settings will be auto saved according to the adapters ...

Страница 6: ...omatically nozzle heights compensation This function is suitable for multiple nozzle programming system such as SB05 Set the MARK point test the height of four suction nozzles with one click and the corresponding compensation value will be calculated automatically In the normal programming process the system will use the compensation value to improve the height consistency of the pickup plate of e...

Страница 7: ...ion immediately 3 2 6 New information display interface real time display of UPH and work order status 3 3 SB0X Specifications 3 3 1 Tool Bars From left to right the icons are Welcome Start up interface showing I O configuration Settings Setting interface Positioning Positioning interface Automatic Automatic programming interface Reports Reports of sessions Connect connect the SB0X and the SP7500 ...

Страница 8: ...or four nozzles can be selected the machine will pick two or four chips at a time Correction the system will do the correction when chips were found not placed well 3 3 4 Positioning settings Initial Point Fixed Camera Activate the camera below the countertop This function is used to adjust the actual target point of initial point Move the cross of the target to the center of the camera After sett...

Страница 9: ...s of the current XY axis as the XY coordinates of the cell o Auto Pos Automatically set XY coordinates using the socket templates o Camera 2 Pick Move Pick up the chip to the fixed camera and make a template Using the fixed camera to make a template for vision check o AutoHeight Test the height for the unit Please make sure that there s a chip in the sockets Please make sure that the air pressure ...

Страница 10: ...superpro sb05 o Clamp_ XX XX Corresponding Programmer flags locations o State Red Closed Green Open o On Open o Off Close Positions of input output Tray Activate the tray position adjustment interface o Click on the camera to activate the corresponding cell slot Position adjustment of the input o Camera activate the corresponding cell slot o Save Use the coordinates of the current XY axis as the X...

Страница 11: ...wo camera for positioning and vision check respectively o An example for taking a template This is not a good template This is a good template o Taking the template for the socket positioning Try to cover the whole socket We can use the calculate button to check the differences between from the picture and the template The deviation will be showed in the next X Y A bar ...

Страница 12: ...o Only when the pause paused prompt to enter the pause state o The machine will stop right after the current movement o The button would be disable if the clear up process is under way Clear up o All the sockets will be cleared Reset o Reset the status of the programmers Vision check o On Enable Device check o On Enable 3 3 7 Reports Programming information 3 3 8 Connect Connect to SP7500 ...

Страница 13: ...g the system on the whole machine power the industrial computer automatically start 4 1 2 Device switch button and emergency stop button Programmer Button controls the power supply of the programmers System Button controls the power supply of the motors Emergency Stop Emergency button 4 1 3 Warning lights Lights The middle orange light is lit when the machine is preparing The green light is lit wh...

Страница 14: ...licable programmer group divided into two groups before and after a total of 8 modules through the 8usb line alone communication On the right is the programmer group for SB02 and the 4 module is centralized to 1 USB cable communications via the hub board 4 2 System Specification 4 2 1 Motion parameters Maximum machine efficiency up to 2500UPH Composition High performance Motion Control Board servo...

Страница 15: ...ically moved out to the position optional after the tray finished Laser marks can be optional when the tray is on the way back C Tape in Tape feeder strap width depends on the chip D Tape out Tape out machine compile the bandwidth degree 12 40mm air pressure or heat seal E Tube in Tubular feed the user can adjust the mounting position of each pipe according to the width of the pipe used can instal...

Страница 16: ...rly placed 5 2 Regular Maintenance Equipment is recommended to do the regular maintenance once 1 2 months Periodically check items 1 Maintenance of air pressure circuit Detect air pressure loops without leaks remove or clean air pressure sources and air pressure adjustments Detect voltage regulator pressure regulating valve and confirm air pressure 0 5Mpa Detect the pressure switch and confirm tha...

Страница 17: ...0 17 of 200 6 Trouble shooting Q Alarm on the servo No 21 0 A Servo signal problem please check the code cable Q Alarm on the servo No 16 0 A The motor is over loaded please check the movement of the motor Q Picking error A Please investigate the picking process The error is cause by one of the two sensors ...

Страница 18: ... 0 Overload protection 18 0 Regenerative discharge overload Protection 1 Regenerative Tr anomaly Protection 21 0 Encoder Communication Disconnection exception 1 Encoder Communication Exception Protection 23 0 Encoder Communication Data Exception protection 24 0 Too much protection for position deviation 1 Too much speed deviation protection 25 0 Excessive protection of mixing deviation 26 0 Over s...

Страница 19: ...SB 02 05 User Manual XELTEK Automatics SB0X XELTEK 2019 All rights reserved User Manual Rev 03 5th MAY 2020 19 of 200 ...

Отзывы: