background image

H0402EN00

10.2011

OPERATOR MANUAL

FB 7100 PLUS

Summary of Contents for FB 7100 PLUS

Page 1: ...H0402EN00 10 2011 OPERATOR MANUAL FB 7100 PLUS...

Page 2: ...ginal document Published by N W GLOBAL VENDING SpA Via Roma 24 24030 Valbrembo BG Italy Part No H0402EN00 Published in 2011 week 41 The symbol indicates that the machine may not be disposed of as ordi...

Page 3: ...p tray 33 Cleaning the drip tray 33 Cleaning inside and outside 34 Mounting of cleaned parts 34 Rinsing machine 35 Last check 36 Deep cleaning Hygiene kit 37 Opening and disconnecting machine 37 Filli...

Page 4: ...ines Calling and resetting counters 56 Emptying the cash box 67 Adding change manually 68 Changing prices 69 Setting of free vend and key discount 70 Time Discount 71 Setting time discount 73 Energy s...

Page 5: ...ng and in a dark blue colour for deep cleaning All parts of action are supplied in a green colour If the vending machine is not used according to its purpose the manufacturer cannot take on any liabil...

Page 6: ...stalled and repaired by qualified personnel who are trained in the correct use of the machine according to the standards in force and who have the specific knowledge of the machine functioning from a...

Page 7: ...ed by its own serial number indicated on the rating plate attached at the rear of the vending machine This plate is the only one acknowledged by the manufacturer as identification of the machine The t...

Page 8: ...tion 2000 2450W Connecting cable Approx 1 8 3 5 m varies depending on local requirements Fuse Transformer primary 2A Transformer secondary on VMC 8A Water connection Water system connection The vendin...

Page 9: ...p tray Approximately 0 4 l Standard Freshbrew ingredient canister Approximately 5 5 l Dual Freshbrew ingredient canister Dual canister 1 2 5 l 0 9 kg Dual canister 2 2 0 l 0 7 kg Standard Instant ingr...

Page 10: ...chine components Machine front fig 1 1 Cabinet 2 Door 3 Freshbrew ingredient canister 4 Advertising poster 5 Operating panel 6 Door lock 7 Cup carrier 8 Pot platform Operating panel fig 2 1 Display 2...

Page 11: ...or dispense head chute for solid coffee waste 8 Dispense head 9 Solid waste container 10 Cover for boiler 11 Door switch 12 Base tray 13 Cash box 14 Drip tray 15 Lock for drip tray 16 Retaining pin fo...

Page 12: ...ion buttons are used as navigation buttons Display Button Function Up button Press this button to move up one step at a time Down button Press this button to move down one step at a time Sel button Pr...

Page 13: ...ad from the bottom line of the display Alternative functions of the navigation keys Display Button Function OK button Press this button to confirm an action e g resetting of counters Esc button Press...

Page 14: ...s Display Button Function Minus button Press this button to decrease a numeric value in increments of one Plus button Press this button to increase a numeric value in increments of one Next button Pre...

Page 15: ...hes the maximum value and the pot button is pressed once more the counter restarts at the predefined number If the machine is not set to free vend insert a card with sufficient credit or insert an amo...

Page 16: ...ress the multibrew button and insert the password needed to avoid free drink dispensing Drink to be dispensed in cup fig 7 place a cup on the cup platform Press the selection button of the desired dri...

Page 17: ...d is requested either when entering the operator menus or when entering the technicians menus See explanation on previous pages Test Complete selections Operator Filling Clean Rinse Rinse Total Machin...

Page 18: ...vend audit Total no nres Total no res No per drink nres No per drink res No per group nres No per group res MB discount audit MB number nres MB turnover nres MB number res MB turnover res Discount ke...

Page 19: ...group res Reset Counters Reset sales audit Reset cash audit Reset Test audit Printing Not Resetable Resetable Cash action Cash collected Dispense coins Manual filling Reset tube contents Basic operat...

Page 20: ...emp on display Set date and time Key discount Time discount Set Time discount Set Day s Set Time Machine Info Machine Code Operator Code Show Install Date Set Install Date Energy saving Save Energy On...

Page 21: ...g profile Pot Sensor On Off Cold water valve Undosed water Softener counter Ex WaterCirculation Set Rinse Timeout Brewer assembly chk Clogged filter chk Global dr scaling Reset relationship Change Com...

Page 22: ...ibit Low change inhibit Audit unit Ext Int Exact change eq Exact change offset Keyboard inhibit Price mode Price to index Zero vend mode Zero vend index Revalue Immediate change Currency code auto Cur...

Page 23: ...brew Change config files Set language file Set recipe file Set menu file Diagnostics Test Overall functions Wittlink test Full dispense test Test vend Cup handling Sensor test User interface Button Ke...

Page 24: ...t valve no X Test all IN valves Test IN motor no X Test all IN motors Sigma brewer 1 Brewer positions Move piston forward Move piston back Change password GSM settings GSM On Off PIN Code Pre Alarms S...

Page 25: ...s short cut is not present in all machines How to use the short cuts Step Action Display 1 Open and close door Wait and turn to the display 2 If the display shows the following short cuts selection wi...

Page 26: ...door to go directly to the test vend functions From here you can select one of the available test vend functions 8 Press 3 and if open close the door to go directly to reading the counters From here...

Page 27: ...n 10 2011 FB 7100 PLUS 23 9 Press 4 and if open close the door to go directly to the menu selections From here you can select one of the menus Step Action Display v Sel Esc MENU SELECTION Operator Tec...

Page 28: ...t to either multi vend or single vend Multi vend The machine can be set to enable selection of several drinks one after the other from only one payment action by coins or card Single vend The machine...

Page 29: ...ou to exactly perform the individual tasks Make sure that all components are installed correctly after the clean ing procedure Clean the inside and outside of the vending machine by using a clean damp...

Page 30: ...red Opening the door Filling the ingredient canisters Filling the freshbrew ingredient canister Removing and emptying the solid waste container Cleaning the cup carrier Cleaning the drip tray Cleaning...

Page 31: ...s Removing and emptying the solid waste container Cleaning the base tray Cleaning the cup carrier Cleaning the drip tray Cleaning machine interior and exterior Mounting cleaned parts Rinsing and last...

Page 32: ...00 PLUS 10 2011 Occasional Once a month Cleaning the instant ingredient canisters Cleaning the freshbrew ingredient canister Replacing the filter roll Rinsing descaling the brewer Interval Type of wor...

Page 33: ...d electri cal components Preparing for filling of canisters Pull forwards solid waste container Pull base tray forwards Filling the instant ingredient canis ters Check ingredient level of instant in g...

Page 34: ...guiding rail Place canister on a plain clean surface Fill the canister with instant ingredient press lid slightly down and push back canister in place Push the outlet tube downwards to open the outle...

Page 35: ...canis ter is locked in place Removing the solid waste container Shake the coffee chute up and down a few times to release possible solid coffee waste remnants into the waste container fig 15 Take out...

Page 36: ...uated on the rear side of the cup station fig 16 Disassemble cup carrier fig 17 Clean the drip grid a and tray b in hot water with cleaning agent and dry parts The complete cup carrier is dish washer...

Page 37: ...ar side of the cup station Cleaning the drip tray Take hold of the drip tray with one hand and pull it forwards in a gentle movement fig 19 Remove drip grid from lid Remove the lid and empty the tray...

Page 38: ...eaning 34 FB 7100 PLUS 10 2011 Cleaning inside and outside Clean the door and the housing inside and outside and finally the bottom with a clean damp cloth fig 21 Mounting of cleaned parts Remount all...

Page 39: ...rm a machine rinse 22 FB 7100 SHORTCUTS 1 Rinse 2 Test vend Start MENU SELECTION Operator Technician v Sel ESC Welcome End Rinse total machine Sel Esc Wait until program has finished Let the pot stay...

Page 40: ...agram above In this case the drink will not be included in the Sales Audit counter See Calling and resetting counters on page 56 There is a risk of scalding from hot water 23 Complete selections DISPE...

Page 41: ...offee mixer option hood for diffuser whipper wheel for coffee mixer option dispense head with outlets and hoses brewer cylinder with mixing funnel mixing funnel hood and valve filter and support for f...

Page 42: ...container Pull forwards the base tray fig 25 Push the outlet tube upwards to close the outlet spout of the wanted canister fig 26 Pull forwards and fill the instant ingredient canisters one by one as...

Page 43: ...nd fill the canister fig 29 Close lid and push the canister back in place Check to ensure that the canister is locked in place Do not use pressure to force more coffee tea into the canister as this co...

Page 44: ...ray Cleaning the instant ingredient dis pensing system components Remove the mixing funnel hoods by lifting off fig 32 Loosen locking rings of mixing funnels by pressing release lever anti clockwise a...

Page 45: ...emove the hood for diffuser and the upper sealing ring fig 35 Turn the diffuser clockwise and pull it off leaving the outlet hose back on fig 35 Remove the lower sealing ring The machine is fitted wit...

Page 46: ...outs from dispense head turn each spout until its locking tab can be released through the notch of the hole in dispense head and lift off the spout fig 39 Removing the coffee waste chute Shake the cof...

Page 47: ...act with the drink Washing can be carried out in a dishwasher 60 C max or using normal dish detergent The fresh brewer consists in the following parts see illustration Note Only clean the air cylinder...

Page 48: ...2011 Disassembling the freshbrew unit The parts to be cleaned are disassembled in the sequence indicated below The illustrations to be read row by row 1 from left to right and 2 from top to bot tom 1...

Page 49: ...LUS 45 The illustrations to be read row by row 1 from left to right and 2 from top to bottom 1 2 3 4 5 6 7 9 10 12 8 11 Reassembling the freshbrew unit The parts of the freshbrew unit are reassembled...

Page 50: ...46 FB 7100 PLUS 10 2011 Emptying the solid waste container Take out the solid waste container empty it and insert a new liner fig 40 Cleaning the base tray Remove and clean the base tray from machine...

Page 51: ...rrier Remove the cup carrier fig 42 see regular cleaning Clean the drip grid and tray see regular cleaning Cleaning the drip tray Take out and clean the drip tray and its parts fig 43 and 44 see regul...

Page 52: ...have been soaking thoroughly with clean and warm water Dry all parts with a dry cloth Check that no dirt or cleaning agent remains on the parts Mounting cleaned parts Remount all parts in reverse orde...

Page 53: ...ng and last check Turn on machine with the main switch Rinse machine twice see regular cleaning Clean outside of machine with a clean damp cloth fig 46 Perform a test dispensing by pressing a selectio...

Page 54: ...ll it forwards fig 48 until end stops in guiding rail Lift the canister upwards and pull forwards over the end stops The lid is automatically triggered open Empty the ingredient of the canister into a...

Page 55: ...ak all components in hot water with cleaning agent except felt disc Rinse all items thoroughly in hot clean water Let components dry completely Reassemble instant ingredient canister in reverse order...

Page 56: ...d and empty the canister into a plastic bag or a clean container fig 54 Place the canister upside down on a table Loosen the remaining coffee by turning the coupling fig 55 and by knocking on the bott...

Page 57: ...lean the canister in hot water Dry the canister Assemble canister and dosing system Fill canister with freshbrew ingredient and reinsert in machine Cleaning the dual chamber coffee canister A dual can...

Page 58: ...r or the gasket for a metallic filter must be replaced after a certain amount of selections even if apparently still efficient Nylon filter for coffee every 25 000 dispensings Gasket for metal filter...

Page 59: ...outlet hose Should the procedure be inter rupted e g if the door is accidentally opened too early the brewer must either be disassembled and rinsed manually or a new rinse procedure must be performed...

Page 60: ...ee black Sel Esc Total xxxxxx Sel OK v Coffee w sugar Total 000 00 Sel OK Esc Esc Total xxxxxxx Sel OK Total number res v Esc Total 00000 00 Sel OK Total turnover res v Esc Esc Esc No per drink nres N...

Page 61: ...tal 000 00 Sel OK Esc Esc Coffee black Sel Esc Total xxxxxx Sel OK v v Coffee w sugar Total 000 00 Sel OK Coffee black Sel Esc Total xxxxxx Sel OK v Coffee w sugar Total 000 00 Sel OK Esc Esc Turn p d...

Page 62: ...000 00 Sel OK Esc Esc Group 1 Sel Esc Total xxxxxx Sel OK v v Group 2 Total 000 00 Sel OK Group 1 Sel Esc Total xxxxxx Sel OK v Group 2 Total 000 00 Sel OK Esc Esc No per group nres No per group res...

Page 63: ...l OK Coffee Sel Esc Total 0000000 Sel OK v Coffee with milk Total 0000000 Sel OK Coffee Sel Esc Total 0000000 00 Sel OK v v Coffee with milk Total 0000000 00 Sel OK Coffee Sel Esc Total 0000000 00 Sel...

Page 64: ...bes Sel Esc Money to cash box v Collected money v Manually filled v v Esc Esc Esc Esc Amount 00000 00 Sel OK Manually delivered v Esc Amount 00000 00 Sel OK Value overpay v Esc Amount 00000 00 Sel OK...

Page 65: ...Total no nres Sel Esc Total no res v Esc Freevend audit Esc v Cash audit v v Coffee w sugar Total 000 00 Sel OK Coffee black Sel Esc Total xxxxxx Sel OK v Coffee w sugar Total 000 00 Sel OK Esc No pe...

Page 66: ...Sel OK Number xxxxx Sel OK Amount 00000 00 Sel OK D Key number nres Sel Esc D Key turnover nres v D Key number res v D Key turnover res v Esc Esc Esc MB discount audit Esc Esc v v Discount key audit T...

Page 67: ...it Sel Esc Time Discount audit Step price audit T Disc number nres Number xxxxxxx Sel OK Number xxxxxxx Sel T Disc turnov nres v Esc Number xxxxxxx Sel OK T Disc number res v Esc Number xxxxxxx Sel OK...

Page 68: ...ce nres Amount 000 00 Step price res Amount 000 00 Reset sales audit Sel Esc Continue Sel Esc Reset of sales audit finished OK Reset counters Reset cash audit Continue Sel Esc Reset of cash audit fini...

Page 69: ...inting in progress OK Please wait Printing in progress OK Please wait Printing in progress OK Please wait Printing in progress OK Please wait Printing in progress OK Overall Sel Esc Sel Esc Selections...

Page 70: ...tinue Printing audit Continue Sel OK Sel OK Sel OK Sel OK Printing audit Continue Sel OK Printing audit Continue Sel OK Sel Esc Selections Counters Overall v Time Bands v Free Vend v Esc Esc Discounts...

Page 71: ...Esc Esc Esc Select Menu Enter Password Test Operator Filling Clean Esc FB 7100 Emptying the cash box Open the door of the vending machine Insert cash box key into keyhole and turn it clockwise Pull ou...

Page 72: ...adjusted Esc Select Menu Enter Password Test Operator Filling Clean FB 7100 Applicable only to BDV and MDB ICP coin mechanisms Adding change manually This procedure is applicable only to BDV and MDB I...

Page 73: ...00 00 OK OK Price per cup Set value 0000 00 OK Sel OK Price per cup Set value 0000 00 Esc OK Sel OK Set step price Value 00 00 OK Sel OK Step price s Off 0 On 1 0 Esc OK Select drink v Esc Global step...

Page 74: ...Service information v v Cash action v Counter v Filling Clean v Esc Esc Esc Esc Sel Esc Off 0 On 1 1 Sel Esc Set percentage 000 Sel Esc Key discount v Esc Esc Esc OK OK v Select Menu Enter Password Te...

Page 75: ...days ALL 7 This means A time discount period that crosses midnight requires two period settings see Example 1 periods 1 and 2 If a time discount is to apply within the same period of time every day of...

Page 76: ...d time 06 00 Result Time discount is given between midnight and 06 00 a m of the same day Period 3 Set start day Sa 5 Set start time 06 00 Set end day Su 6 Set end time 23 59 Result Time discount is g...

Page 77: ...20 OK Sel Set start day Mo 0 Su 6 All 7 7 Esc OK Sel Set start time Time 22 00 OK Set end time Time 23 59 Set end day Mo 0 Su 6 All 7 7 Esc OK OK Esc OK OK OK Select Menu Enter Password Test Operator...

Page 78: ...d results The temperature during the energy saving period is set in set temperature Example The vending machine is to run Monday to Friday from 07 00 till 22 00 The remaining time of the week and duri...

Page 79: ...e leaves the energy saving mode and returns to the vend mode As soon as the temperature in the water tank has reached the nominal temperature the machine is ready for dispensing and the wanted drink c...

Page 80: ...art time Time 00 00 OK Set end time Time 00 00 OK Set end day Mo 0 Su 6 All 7 1 Esc OK Sel Esc Set temperature Temp 000 OK Sel Esc Set doorlight 1 On 0 Off 1 OK OK OK OK OK OK Select Menu Enter Passwo...

Page 81: ...e At the press of a selection button the machine will return to vend mode When the water is suffi ciently heated the machine is ready to dispense drinks If the selection panel is left untouched for 10...

Page 82: ...S 10 2011 Please remove pot Remove pot from pot platform No SB1 or 2 cyl Pressure Remove blocking object from upper valve of brewing cylinder SB Piston error Clean the brewer unit SB Scraper error Cle...

Page 83: ...canisters are located in their correct place Ensure that hoses from ingredient canisters are located cor rectly in the dispense head Too little water or no water is dispensed Ensure that water pipes a...

Page 84: ...s outside of the machine replace as necessary Check if the drip tray or base tray is empty Empty wipe and dry sensors Ensure that the door is properly closed Liquid in bottom of machine One or more ho...

Page 85: ......

Page 86: ......

Page 87: ......

Page 88: ......

Reviews: