background image

IC8 Installation 

 

Unpacking Check list: 
 

  1 x IC8 Chiller 

  1 x Pressure Reducing Valve (PRV) 

  1 x Pressure Relief Valve (PRV110) 

  1 x Drain Clamp 

  2 x Push Fit Union/Tube Connectors 

  1 x Push Fit ‘T’ Connector 

  Basic Schematic 

 
 
Optional Extra:  

  Undersink Filter Kit – includes tube, faucet, take-off valve & carbon filter. 

  Faucets are not supplied and can be purchased separately. 

  Tube is not supplied and can be purchased separately. 

  If no filter is being fitted a choice of Take Off valves is available. 

 
 
 

When installing the IC8/C12E the Push Fit (¼ x ¼) Connectors must 

be fitted to the inlet/outlet stainless-steel pipes on top of the chiller. 

 
 

A Pressure Reducing Valve (PRV) must be fitted when installing the 
IC8/C12E   

 

Step 1 – Fitting 

PRV 

 

The PRV must be fitted prior to any filter and the 
chiller. 

The PRV should not be connected directly to 
chiller. Tube should be used to do so. 

Connect ¼” tubing (not supplied) between the 
PRV and drain clamp. 

Ensure that when connecting the tube it is done 
as per the flow direction of the arrow on the side 
of the PRV. 

Connect ¼” tubing (not supplied) between the PRV and drain clamp. 

Connect tubing using a Push Fit Union Connector to water chiller inlet. 

 

Refer to schematic for guidance. 

A Pressure Relief Valve (PRV110) must also be fitted when 

installing the IC8/C12E 

 

 

W

aterline PRV

R

ec

om

m

en

de

d

fo

r p

res

sure

s a bove 8

50 kP

a o

r  fo

r w

at

er

h

am

m

e

r

Reviews: