WATCO MANUFACTURING COMPANY

Instructions for Installing Watco Innovator

®

 Cable Bath Wastes

Models: Watco CableFlex™: 928, 938, 948 – Watco Cable: 970, 980, 990 – Half Kits: 971, 981, 991

© 2011 Watco Manufacturing Company

 

Page 1

 

970INST  Rev. 4/11

3

Figure 2

Figure 3

Figure 4

19

20

21

22

24

25

26

21

22

Figure 1

Figure 6

Figure 5

Continued next page.

13

12

11

Step 1:

 Cut the 1½” Schedule 40  (or Flexible PVC) overflow pipe and drain pipe (

Items 14 and 16

) to the 

desired lengths to fit the tub.

Step 2:

 Using standard solvent cement procedures, assemble the bath drain pipe and fittings (

Items 13-16, and 19

).  

DO NOT LET SOLVENT CEMENT FLOW INSIDE THE OVERFLOW OR DRAIN ELBOWS PAST THE 

SOCKET!

  Any excess glue will prevent the bath waste from operating.

Step 3:

 Place the thick foam gasket (

Item 12

) onto the overflow elbow (

Item 13

).  

The testing membrane will still be attached. 

Thick-walled tubs will require the 

thin gasket (

Item 11

).

 

Step 4:

 Insert the overflow elbow and 

foam gasket assembly through the tub 

overflow hole from the back of the tub 

(

Figure 1

).

Step 5:

 Screw on the overflow elbow (OE) nut (

Item 3

from inside of the tub (

Figure 2

).  

HAND TIGHTEN 

ONLY

 until the nut is snug and the gasket is only slightly 

compressed against the back of the tub. 

You must get a 

minimum of 1½ turns when installing the nut.

  If there are 

not enough threads sticking through the tub to get the nut 

installed, remove the thick gasket 

(Item 12

) and replace it 

with the thin gasket (

Item 11

).

Step 6:

 Secure the drain elbow (

Item 19

) and drain 

flange gasket (

Item 20

) under the tub by screwing 

in the strainer body (

Item 21

) through the tub 

drain hole from inside the tub (

Figures 3 and 4

).  

If desired, a putty or sealant may be used between 

the flange of the strainer body and the tub. 

CAUTION:  Do not use linseed oil based putty 

products.  Use only thread compounds specifically 

intended either for ABS or PVC assembly.

If the bath waste will not be pressure tested, skip to step 8.

Step 7:

 Screw the strainer test plug (

Item 26

) into the strainer 

body 

Item 21

) and test the system (

Figure 5

).

Step 8:

 After the pressure testing is complete, remove 

the test plug (

Item 26

).  Cut away and discard the orange 

test membrane from the overflow elbow (

Figure 6

).  

Use 

caution not to damage internal parts on the inside of the 

overflow elbow.