W Series Frame Standoff Bracket
W Series Frame -2WB Installation Instructions
• (2) W Series Frame
2WB Pieces
• Phillips Head Driver
• Drill
• Level
• Metal Cutting Saw
• Tape Measure
• Metal File
• Pencil
Starter Kit Included Parts
Required Tools
Fasteners:
There are pre-drilled mounting holes in each Standoff Bracket. Appropriate fasteners for your
surface must be utilized in every mounting hole for proper installation. Fasteners for attaching the frames to the
floor or ceiling are not. We recommend the following fasteners for these surfaces:
• Drywall installations should attach to joists or wood backing when available with a #8 X 11/2” course
thread screw or larger alternatively, use expanding hollow wall anchors with at least #8 screw size
• Wood surfaces use #8 X 11/4” course thread screws or larger
• Concrete, Brick or Stucco: 3/16” x 11/4” masonry screw or #8 x 11/4” screw with appropriate size
expanding concrete anchor
Figure A
Figure B
1. Assemble the Frame:
Insert the plastic cou-
plers into the open ends of one frame section and slide
the second frame section over the exposed ends of the
couplers (Figure A), ensuring both sections are seated
flush against the coupler.
2. Measure:
Measure the distance from the floor
to the centerline where the wall brackets will at-
tach (Figure B). Add 3/8” (9.5mm) to allow for the
thickness of the bottom mounting plate and the offset
of the wall bracket. Mark the calculated distance on
both legs of the frame on the side nearest the Base
Plate you are replacing.
Note:
If the calculated measurement aligns with one
of the cross members, cut 2” (52mm) off one end
of the frame and then mark the cut lines, measuring
away from the cut end of the frame.