background image

W Series Frame Standoff Bracket

W Series Frame -2WB Installation Instructions

•  (2) W Series Frame 

2WB Pieces

•  Phillips Head Driver

•  Drill 

•  Level 

•  Metal Cutting Saw 

•  Tape Measure

•  Metal File 

•  Pencil

Starter Kit Included Parts

Required Tools 

Fasteners: 

There are pre-drilled mounting holes in each Standoff Bracket. Appropriate fasteners for your 

surface must be utilized in every mounting hole for proper installation. Fasteners for attaching the frames to the 

floor or ceiling are not. We recommend the following fasteners for these surfaces:

•   Drywall installations should attach to joists or wood backing when available with a #8 X 11/2” course 

thread screw or larger alternatively, use expanding hollow wall anchors with at least #8 screw size

•  Wood surfaces use #8 X 11/4” course thread screws or larger

•  Concrete, Brick or Stucco: 3/16” x 11/4” masonry screw or #8 x 11/4” screw with appropriate size 

expanding concrete anchor

Figure A

Figure B

1. Assemble the Frame:

 Insert the plastic cou-

plers into the open ends of one frame section and slide 

the second frame section over the exposed ends of the 

couplers (Figure A), ensuring both sections are seated 

flush against the coupler.

2. Measure:

 

Measure the distance from the floor 

to the centerline where the wall brackets will at-

tach (Figure B). Add 3/8” (9.5mm) to allow for the 

thickness of the bottom mounting plate and the offset 

of the wall bracket. Mark the calculated distance on 

both legs of the frame on the side nearest the Base 

Plate you are replacing.

Note: 

If the calculated measurement aligns with one 

of the cross members, cut 2” (52mm) off one end 

of the frame and then mark the cut lines, measuring 

away from the cut end of the frame.

Reviews: