C2020H / C2040H

CONTAINER SHELTERS 

(with Back Cover)

www.varnabuildings.com

VARNA

Summary of Contents for C2020H

Page 1: ...INSTRUCTION MANUAL C2020H C2040H CONTAINER SHELTERS with Back Cover www varnabuildings com VARNA...

Page 2: ...1 www varnabuildings com...

Page 3: ...A Y L B M E S S A TOOLS REQUIRED FOR INSTALLATION SITE PREPARATION CONTAINER SHELTER PLACEMENT BASE PLATE INSTALLATION Y L B M E S S A E M A R F FRAME INSTALLATION ROOF COVER INSTALLATION BACK COVER I...

Page 4: ...al of the container shelters Improper site preparation assembly and maintenance of the container shelters may invalidate warranty Please reach out to your local dealer for any queries with their respe...

Page 5: ...it s likely to be windy 8 Ensure personal safety during assembly of the shelter Wear safety goggles and gloves during assembly and exercise caution when handling clips and tubes 9 Ensure there is adeq...

Page 6: ...10 18 5 Top Roof Purlin 4 8 6 Connection Purlin 16 32 7 Lower Tension Tube for Roof Cover 2 Groups 2 Groups 7A Ratchet Tie Down 10 18 7B Ratchet Tie Down Strap 10 18 8 Angle Seats 4 4 9 Roof Cover 1 1...

Page 7: ...is slightly larger than the shelter area 4 Lay out all the components within this site in the approximate locations at which they will be assembled The containers base plates and square tubes will be...

Page 8: ...www hardlifeutility com Figure 1 C2020H Figure 2 C2040H CONTAINER SHELTER PLACEMENT Use a crane to place the two containers in the correct position as shown in Figures 1 and 2 7 www varnabuildings co...

Page 9: ...bes for the middle component code R1 at equidistant points as shown in Fig ures 1 and 2 3 Fix the base plates square tubes and connectors used for fixing the square tubes component code 15 using the 1...

Page 10: ...ures 6 and 7 is made of One three way fitting tube component code 1 for the first and last arch OR One four way fitting tube component code 2 for the arches in the middle Two top bent tubes component...

Page 11: ...10 www hardlifeutility com Figure 6 C2020H Figure 7 C2040H 10 www varnabuildings com...

Page 12: ...rch in the same manner immediately after installing the first arch and connect the two arches using connection purlins component code 6 Secure the purlins using M8 X 70 mm bolts as shown in Figures 6...

Page 13: ...s for the roof cover component code 7 into the pockets of the roof cover as shown in Figures 8 and 9 make small slits in the cover and use ratchet tie down straps component code 7B to attach the tube...

Page 14: ...eutility com Figure 9 C2040H 5 Adjust the cover such that it is evenly centred on the frame and smoothen to remove all wrinkles on the cover as shown in Figures 10 and 11 Figure 10 C2020H 13 www varna...

Page 15: ...cover to the angle seats NOTE Ensure that you do not over tighten the lacings 8 Attach ratchet tie downs component code 7A at the base of the arches using the bolts provided on both the inner sides o...

Page 16: ...ardlifeutility com Figure 12 C2020H Figure 13 C2020H WARNING Never leave the roof cover unattached under any circumstances until the final assembly and tightening have been completed 15 www varnabuild...

Page 17: ...en the steel frame after installation of the shelter if required as shown in Figure 15 Duct tape is also used on some tube connections near the top of the frame to ensure that the roof cover doesn t t...

Page 18: ...CRIPTION C2020H C2040H Quantity 16 Tube for Connecting the Back Cover 4 17 Angle Seat 6 18 Ratchet Tie Down 2 19 Iron Plate 2 20 M10 X 30 mm Bolts 6 Sets 21 Ropes 20 Metres 22 Back Cover 1 INSTALLING...

Page 19: ...o E 4 Connect the tubes for connecting the back cover component code 16 to the angle seats 2 tubes on either side using M10 X 30 mm bolts component code 20 as shown in Figure 16 refer to Photos D G 5...

Page 20: ...al as the roof fabric tends to be stiff in the cold season autumn and winter and slack during summer Hence the roof fabric should ideally be retightened before the next winter Adjust the roof cover ev...

Page 21: ...20 www hardlifeutility com 20 www varnabuildings com...

Page 22: ...nt subject to availability 5 YEAR SPARE PART REPLACEMENT Spare part availability for 5 years from the date of purchase EFFICIENT AFTER SALES SUPPORT Lifelong technical assistance for all our products...

Page 23: ...22 www hardlifeutility com 22 www varnabuildings com...

Page 24: ...MERCHANT HOUSE TILBURY ESSEX UNITED KINGDOM RM18 7HP Call us 44 01279 214299 VARNA www varnabuildings com...