background image

 

14401 Keil Road NE, Aurora, Oregon, USA 97002 

PHONE 503-678-6545  

  FAX 503-678-6560 

www.vansaircraft.com  

  [email protected] 

 

Page 

1

 of 

3

  

 

 

 

 

 

              

SD-SB-SL Template R6.4  12/11/20   VAD-10009 
 

 

 
 

SERVICE BULLETIN 99-06-01 

 

Date Released: 

October 21, 2021

 

 

October 21, 2021 (Rev 2, made SB mandatory; removed 
the original option for ongoing inspections) 

 

June 30th, 1999 (Rev 1)

 

 
Date Effective:  

 

October 21, 2021 

 

Subject:  

O

verhead (“suspended”) rudder pedals for the RV-6 and 

RV-6A are cracking and need to be replaced or 
reinforcement gussets need to be installed 

 

Affected Models:  

 

RV-6, RV-6A  

 

Required Action:  

Replace or reenforce all affected WD-655-L/R rudder 
pedals with gussets 

 

Time of Compliance:  

Before further flight 

 

Supersedes Notice:

   

Revises and replaces SB 99-06-01 Rev 1 

 
Labor Required: 

6.0 Hours

 

(Note this number is highly dependent on the 

configuration of the RV-6, the presence of a center 
console, or other unique features that may inhibit the 
removal and subsequent installation of WD-655-L/R) 

 

Level of Certification:

 

Check the rules of the local controlling authority/agency 
and the operating limitations for your aircraft 

 

Synopsis: 

 
There have been several cases of welds breaking on the overhead-style rudder pedals 
(WD-655L and WD-655R) used in the RV-6/6A. These breaks usually occur where the 
upright tubes from the pedal connect to the torque tube that runs across the fuselage. 
The forward side of the torque tube fails in compression, allowing the aft side of the 
torque tube to tear. 
 
Va

n’s Aircraft, Inc. has static tested a set of production pedals and found they exceeded 

the strength limits specified in FAR Part 23. However, since several operational failures 
have occurred, corrective action should be taken. 

 
 
 

Reviews: