Product Guide 

For Topaz LinkSign LCD 1x5

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for LinkSign LCD 1x5

Page 1: ...Copyright 2019 Topaz Systems Inc All rights reserved For Topaz Systems Inc trademarks and patents visit www topazsystems com legal Product Guide For Topaz LinkSign LCD 1x5 ...

Page 2: ...uring Signatures 4 Signature Pad Base Information 6 Base LED Functions 6 Signature Pad Information 7 Pad LED Functions 7 Pad Usage Charging 7 Battery Length 7 Battery Replacement 7 LinkSign Range 7 Power Modes 8 LinkSign June 2019 Feature Upgrade 8 Hardware Compatibility 9 Software Compatibility 9 Channel Configurations 9 LinkSign RMAs 9 ...

Page 3: ...paz LinkSign LCD 1x5 Guide List of Included Parts The following parts are included with the LinkSign set 1x LinkSign LCD 1x5 signature pad with charger not pictured 1x Signature pad base unit with power adapter and antenna 1x Serial cable ...

Page 4: ... the signature at the appropriate time 4 The customer returns the LinkSign to the teller 5 The teller completes the transaction by returning the customer s documents checks cash or receipts in a standard transport canister Capturing Signatures 1 Disconnect the pad from the charger 2 Verify that the green LED on the end of the pad is on 3 If the green LED is off push the button near the charging co...

Page 5: ...1x5 Guide 5 Touch the signing surface and verify that an activation wave moves down the signing LCD surface see below and that the backlight is on 6 Sign the pad using the attached stylus 7 Verify that the application has received the signature and save it ...

Page 6: ...d base by screwing it on until snug Then tilt the radio antenna in the desired direction 2 Connect the serial cable from the base to your computer connect the black power adapter labeled Base Only to the base and plug in Base LED Functions LED STATUS CONDITION Red Solid Link is established with the LinkSign Yellow Flashing Data is being sent signature in process Green Solid Power is ON ...

Page 7: ...night for regular use Do not charge the pad while in use or between transactions A full battery charge 0 to 100 takes approximately 4 hours The charger shuts off after 5 hours of continuous charging and will not continue to charge the batteries for an extended period of time if they are already fully charged Battery Length Operation time of the LinkSign LCD 1x5 is 12 hours This is from 100 charge ...

Page 8: ...ode shuts off the LinkSign s internal radio and the LCD backlight 3 From Sleep to OFF 90 minutes LinkSign June 2019 Feature Upgrade A major hardware revision was made to the LinkSign LCD 1x5 in June 2019 The following changes have been made 1 Data paths LinkSign LCD 1x5 is bi directional Graphics can now be sent from a PC to the LCD display of the LinkSign 2 Encryption All wireless data is encrypt...

Page 9: ... Each LinkSign signature pad is configured to work with its own base station Users with multiple LinkSign signature pads must have them configured on different channels so that they do not interfere with each other A back up pad can be configured to work with the same base station as a primary pad but both are not able to operate with the one base station at the same time In this case both LinkSig...