background image

Ins
tallation & Oper

ating Ins

tructions

360° Flush Mount Ceiling  

PIR Light Controller

Model: PDFMMINIL 

Mini Recessed PIR Master Linkable  

and Power Box

Model: PDFMMINILS 

Mini Recessed PIR Slave Linkable

Summary of Contents for PDFMMINIL

Page 1: ... l a t i o n O p e r a t i n g I n s t r u c t i o n s 360 Flush Mount Ceiling PIR Light Controller Model PDFMMINIL Mini Recessed PIR Master Linkable and Power Box Model PDFMMINILS Mini Recessed PIR Slave Linkable ...

Page 2: ...ing Regulations Check that the total load on the circuit including when this PIR sensor is fitted does not exceed the rating of the circuit cable fuse or circuit breaker 3 Technical Specifications Power Box 230V AC 50 Hz This Power Box is of Class ll Construction and must not be earthed Maximum Switching Load 2300W Halogen 500W Low loss balance fluorescent 250W Electronic balance fluorescent CFL a...

Page 3: ...er body 64mm height Slave PIR Sensor These PIRs are of Class lll Construction and must not be earthed Motion Detection Range 8m diameter at a 2 5m mounting height Presence Detection Range 3m diameter Detection Angle 360 Warm Up Time 60 seconds Operating Temperature 20 C to 40 C Ceiling Cut Out 40mm diameter hole Connection Cable Pre fitted 5m long cable with an RJ11 connector IP40 Rated suitable f...

Page 4: ...flective surfaces such as mirrors etc Mounting the sensor near heat sources such as heating vents air conditioning units lights etc Mounting the sensor near objects that may move in the wind such as curtains tall plants etc 5 Installation 5 1 Ensure the mains supply is switched OFF and the circuit supply fuses are removed or the circuit breaker turned off ...

Page 5: ...table hole cutter to cut out a 40mm diameter hole 5 5 Pass the 230V 50Hz mains supply and load cables through the hole and prepare for termination 5 6 Undo the 2 fixing screw located on the far end of the power box and remove the terminal block cover opposite side to the RJ11 connection socket 5 7 Terminate the cables into the terminal block ensuring correct polarity is observed and that all bare ...

Page 6: ...1 cable into the socket on the power box Fix the master PIR sensor into position using the metal springs Note A maximum of 5 PDFMMINILS Slave PIR sensors can be linked to the PDFMMINIL Master PIR sensor to enable any detector to turn ON all the lights connected The total load must not exceed the lamp rating of a single PDFMMINIL unit Example ...

Page 7: ...ve Supply Brown or Red to L Neutral Supply Blue or Black to N A Loop Terminal centre terminal is provided should a 3 core cable be used Load Switched Live Brown or Red to L1 Neutral Load Blue or Black to N 6 Connection Diagram Connect the 230V 50Hz mains supply cables to the terminal block in the power box as follows ...

Page 8: ... testing to be carried out to establish whether the sensor is covering the required zone Walk around the sensor to establish the detection zone The sensor will detect within an approximately 8 metre diameter circle from the centre of the sensor location with a 2 5m ceiling As you cross a detection zone the lamp will illuminate Now stand still until the lamp extinguishes this should take approx 2 s...

Page 9: ... You can adjust the TIME as marked 30secs 2min 5min 10min 15min and 30min max Set the control to the desired setting The LUX control determines the level of darkness required for the unit to start operating The setting is best achieved by the procedure below 1 Make sure the LUX control knob is set fully clockwise Sun symbol 2 When the ambient light level reaches the level of darkness at which you ...

Page 10: ...t until the unit operates as desired Once the unit is set up as desired push the sensor body fully upwards into its housing and rotate clockwise to lock into place 8 Lens Mask There is 1x lens mask included in the accessory pack The purpose of the lens mask to mask out areas not desired for detection You can restrict left or right detection or reduce the 8 metre diameter to cover a smaller zone Us...

Page 11: ...s responsible for all shipping postage charges outside of the UK All shipping costs are to be paid in advance before a replacement is sent 9 Manual Override Mode The light can be switched ON for longer time periods by use of the Manual Override Mode This can be activated at night time only by using the internal wall switch or circuit breaker Switch the internal wall switch twice OFF ON OFF ON with...

Page 12: ...l csc timeguard com For a product brochure please contact If you experience problems do not immediately return the unit to the store Telephone the Timeguard Customer Helpline Qualified Customer Support Co ordinators will be on line to assist in resolving your query HELPLINE 020 8450 0515 or email helpline timeguard com www timeguard com ...

Reviews: