background image

03/2021  V 1.0

VIEW 09

Illustration - View 09

H1 Handle

SB7 Stay Bar

Right Hand

Summary of Contents for VIEW 09

Page 1: ...03 2021 V 1 0 VIEW 09 Illustration View 09 H1 Handle SB7 Stay Bar Right Hand...

Page 2: ...at all times until the glass is moved to its final position Ensure that the glass is installed correctly taking care to avoid installing the glass upside down On certain panels an easy clean coating i...

Page 3: ...03 2021 V 1 0 VIEW 09 Supplied Parts Inline Fixed Panel x1 Door x1 Nylon Block x1 Glass Support x2 Return panel x1 Glass to Glass Hinge x2 Wall Profile End Cap x2 Door Handle Option dependant x1...

Page 4: ...Supplied Parts Underframe Wedge Gasket x4 Underframe x2 Underframe Gasket x2 Wall Profile x2 Wall Profile Soft Seal x2 Wall Profile Rigid Seal x2 Underframe Top x1 Return Panel to Door Bubble Seal x1...

Page 5: ...03 2021 V 1 0 VIEW 09 Supplied Parts Bottom Door Seal x1 Spacers Underframe 90 Connector x1 Packers...

Page 6: ...03 2021 V 1 0 VIEW 09 Supplied Parts Please use this page to find which stay bar your enclosure has been supplied with SB7 With Glass Clamp and T Connector SB1 With Glass Clamp SB2 45 With Glass Clamp...

Page 7: ...low diagram to reference the list of parts A B I C H D F E G Return Panel Door Panel Fixed Inline Profile Wall Profile End Cap Wall Profile Rigid Seal Wall Profile Soft Seal Underframe Wedge Gasket Un...

Page 8: ...GI 7QGjP Ijkg IQOPj 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 ADJUSTMENT SHEET STANDARD ENCLOSURES Please Note Only Standard Enclosures are shown above If you have a Bespoke Enclosure reference the delivery no...

Page 9: ...ape edge to the tiling and take note of this distance Repeat for the Return Underframe F R Check the dimensions are within the allowed adjustments by referencing the attached adjustment sheet Subtract...

Page 10: ...strips from the self adhesive and x rmly to the tray Place the Underframe Gaskets where the glass will sit into the Underframe and butt up against the wall Place the Wall Pro les over the Underframe...

Page 11: ...on each Wall Pro le to cover the screws Ensure the n is on the inside wet side Use the Nylon Block to help Using purpose built Glass Lifters position and sit the Return Glass Panel on to the Underfra...

Page 12: ...pose built Glass Lifters carefully place the Inline Panel on to the Underframe Gasket and push against the Wall Pro le Note the orientation and position of the Panel this can be determined by any hole...

Page 13: ...ful not to damage the channel nish Re drill the screws in to the Wall Pro le and remove after drilling Reinstall the Wall Pro les Wall Pro le Soft Seals and Glass Panels Measure the width of the Door...

Page 14: ...s in both the Wall Pro les 6mm is recommended Apply the Rigid Seals to the dry side of the Wall Pro les starting from the archway of the Wall Pro le up to the top Gently tap the Wall Pro le Rigid Seal...

Page 15: ...Gaskets at the edge of the Inline Panel Remove both Wedge Gaskets and trim Reinstall Wedge Gaskets after trimming Trim both of the Wall Pro le seals at the top face of each Wall Pro le using a blade C...

Page 16: ...the Return Panel to the wall opposite Ensure this measurement is truly horizontal Subtract 6 5mm to get your nal dimension Mark the nal dimension on the Stay Bar Tube wrapped with some masking tape Ca...

Page 17: ...es with a pen Drill holes using a 5mm drill bit Assemble the Glass Clamp to the Stay Bar as shown Secure the Glass Clamp over the panel making sure the glass is fully inserted into the groove Ensure t...

Page 18: ...tape on the tiles to help Using a 5mm high quality drill bit for a clean and precise hole drill the marked areas fully insert the wall plugs and x the Connector to the wall Professional Tip If drillin...

Page 19: ...03 2021 V 1 0 VIEW 09 11 20 Assemble the Glass Clamp to the Stay Bar Secure the Glass Clamp over the panel ensuring it is ush against the wall tile STAY BAR CONFIGURATION B SB2 B1 B2...

Page 20: ...B2 Using a 5mm high quality drill bit for a clean and precise hole drill the marked areas fully insert the wall plugs and x the Connector to the wall Fix Glass Clamp over the Glass and attach the Stay...

Page 21: ...03 2021 V 1 0 VIEW 09 13 20 STAY BAR CONFIGURATION C SB2 X2 Follow Con guration B SB2 and repeat for Inline Panel C1...

Page 22: ...VIEW 09 14 20 Follow steps A1 A4 Secure the T Connector to the Inline Panel as shown Secure the Stay Bar to the Return Panel ensuring the Glass is fully inserted into the Clamp STAY BAR CONFIGURATION...

Page 23: ...ng ceramic tiles place masking tape on the tiles before marking and drill through the tape to prevent the drill bit from skidding DO NOT use Hammer Action as this will break the tiles STAY BAR CONFIGU...

Page 24: ...the archway gap of the Return Panel and trace along the Glass on both sides Spray water on Glass Panel and use Nylon Block to help feed Gasket Trim the Wedge Gasket where it meets the Underframe Top...

Page 25: ...eck the orientation is correct Leave the Seal oversized This will be trimmed later Place the Glass Supports over the Underframe as shown With one person inside the enclosure position the Door onto the...

Page 26: ...t the bottom door seal accordingly Trim the outside edges on both ends to allow the two vertical seals to touch the glass Attach the Seal ensuring the Seal is correctly oriented Push both Vertical Sea...

Page 27: ...visible when looking down on the handle Using a sharp modelling knife trim any excess gasket material from the Hinges that may have squeezed out when tightening Take care not to scratch the glass surf...

Page 28: ...r all around the outside of the Underframe and Wall Pro les Apply silicone to the edge of the Underframe Top where it meets the Inline and Return Panel Check silicone has been applied to all the below...

Reviews: