background image

Short Manual Installation TTT 
 

 

 

1.

 

General notes TTT 

2.

 

Unpacking 

3.

 

Release transport lock 

4.

 

Install the platter 

5.

 

Set the level 

6.

 

Install the tonearm 

 

 

 

Summary of Contents for TTT

Page 1: ...Short Manual Installation TTT 1 General notes TTT 2 Unpacking 3 Release transport lock 4 Install the platter 5 Set the level 6 Install the tonearm ...

Page 2: ...r delivered with the TTT The clamp uses a spring loaded mechanism to make sure the record is not pressed on the platter with high forces This means you can tighten the clamp to the arresting point for best result 2 Unpacking The package consits of three layers Please take out all items of one layer before taking out the layer completely Please always use the original packaging for any transport of...

Page 3: ...sport the TTT with the platter mounted to prevent damage to the main bearing Please loose the four screws of the lockers using the 5mm hexagon key Take out the four screws completely Turn the lockers 180 around their own axle The center spindle will lower down around 1mm Put the four screws in again Tighten the four screws Make shure the center spindle rund freely Locker Locker 2x locker screw 2x ...

Page 4: ... please move the main platter carefully and slowly on the sub platter Make sure to hold the main platter absolutely lateral all the time If the main platter is properly installed there is a gap of around 1mm between its lower surface and the chassis Main platter Sub platter Chassis ...

Page 5: ... use the water level to adjust the level correctly 6 Install the tonearm Take away the connection terminal using the 1 3mm hexagon key Guide the tonearm wire thru the prepared channel and solder it to the connection terminal Re install the connection terminal Set the tonearm according to its manual Adjustable spikes channel Connection terminal ...

Reviews: