10/11/2011 

carried out by Fabrizio Frattini  
Approved by Andrea Borghesi 

revision 1/1 

 

 

 

 

 
 
 

 

 

MACHINE INSTALLATION MANUAL 

 

KINESIS STATIONS CORE 

MH650E 

 

 

EQUIPMENT NECESSARY FOR THE INSTALLATION 

 

 

 

 

 

 
 
 

 

N.B. 

 

Wrenches T 5-6-8 
socket wrench/open end wrench 17  
knives 
Electric Phillips-head screwdriver and/or Phillips 
screwdriver carrier and/or dollies 

 

 

Bolts and nuts are contained in a special blister pack with relative legend 
The housings are extremely delicate (once unpacked they become 
dirty very easily) 
The weight of the machine is top-heavy towards the seat 

To fix the machine to the ground, position the plates before closing the housings 

 
 
 
 
 
 
 
 
 
 
 
 
 

PEOPLE NECESSARY FOR THE INSTALLATION 

 

 

Summary of Contents for MH650E

Page 1: ...rench 17 knives Electric Phillips head screwdriver and or Phillips screwdriver carrier and or dollies Bolts and nuts are contained in a special blister pack with relative legend The housings are extremely delicate once unpacked they become dirty very easily The weight of the machine is top heavy towards the seat To fix the machine to the ground position the plates before closing the housings PEOPL...

Page 2: ... 8 8 Z 1 0Z415 self locking nut M10 Z 2 0D004515AC frame unit housing 1 0Z165 M5x10 8 8 Z 2 0C002209AC rear housing 2 0Z216 Screw M6x35 10 9 Z 1 0 0B001935 washer 1 0G001314 well nut M6 1 H0007216AA handles unit 2 0N001388AA handle 2 0N001389AB plate 2 0Z208 Screw M8x16 10 9 Z 4 0N001523AB plates for fastening to the ground 2 0Z438 no blister lower nut M12 1 0Z313 no blister washer 13x24x2 5 3 0Z1...

Page 3: ...ied out by Fabrizio Frattini Approved by Andrea Borghesi revision 1 1 3 10 11 2011 UNPACKING MACHINE DO NOT USE KNIFE UNPACKING MACHINE SEQUENCE Phase 1 Operator A Operator B Remove cardboard packaging box ...

Page 4: ... Andrea Borghesi revision 1 1 4 10 11 2011 Phase 2 Operator A Operator B Disassemble the right left wooden frame dotted black line Remove 2 2 screws fixing right left of wood detail Take out and place the machine parts next to the unpacking area ...

Page 5: ...Borghesi revision 1 1 5 10 11 2011 Phase 3 Operator A Operator B Cut the lower blackties do not cut the 4 upper ones position the transport carrier separate the wooden frame from the pallet and transport the machine to an area close to the unpacking N O ...

Page 6: ...carried out by Fabrizio Frattini Approved by Andrea Borghesi revision 1 1 6 10 11 2011 Phase 4 Operator A Operator B Eliminate the wooden frame A eliminate the polyethylene bag ...

Page 7: ...1 8 10 11 2011 Transport the machine components to the assembly area using the transport trolley or dollies depending on the type of area MACHINE ASSEMBLY SEQUENCE Phase 1 Operator A B Tighten seat unit to frame with 2 2 screws and 2 2 washers eliminating the support clamp ...

Page 8: ... 2 Operator A Operator B Insert rear foot to frame unit tightening the 2 screws K 1 screw J 2 2 washers nut tighten all the arms the screws have already been preset by Operator B unhook 3 arms D remove plate F install the arms in the special housings inserting 2 screws G 2 washers for each arm ...

Page 9: ...oved by Andrea Borghesi revision 1 1 9 10 11 2011 Phase 3 Operator A Operator B Remove the packaging of central frame unit L slide down the frame in the open slot tighten with 2 screws M Insert 10 threaded pins well nut into the frame unit ...

Page 10: ...nsert into the frame unit starting from the top and continuing to the bottom tighten with 5 screws P 5 washers insert right handle Q and tighten with 2 screws R Remove the packaging take out the left housing and insert into the frame unit starting from the top and continuing to the bottom tighten with 5 screws P 5 washers insert right handle Q and tighten with 2 screws R ...

Page 11: ...to the customer WARNING If it is necessary to move the machine once the installation is completed pay attention to the housing of the front and back feet shown in the illustration Lift up the foot and remove the feet if needed When transporting the machine especially up stairs place a wooden beam take it from the packaging between the rods shown in the figure and the transport trolley to avoid ben...

Page 12: ...ground proceed in the same way on both sides of the equipment fasten clamps M with screws C with nuts and washers bolts and nuts are preassembled on the frame Mark on the floor the point where to drill the two holes Drill the floor Insert the anchoring bolts into the holes of clamps M ATTENTION use an anchor bolt with minimum guaranteed weight 50kg ...