background image

 

 

 

 

PO Box 51294 Philadelphia, PA 19115 • Phone: 877.333.8323 • www.sureshade.com 

 

 

 

SureShade Installation 

 

1)

 

Mark the position of the mounting clamps (Figs 1 – 4) 

2)

 

Secure the mounting clamps in place 

3)

 

Secure the actuators in place 

4)

 

Secure the roller assembly in place 

5)

 

Secure the crossbars in place  (Fig 5 – 6) 

6)

 

Set up the electrical system (Fig 7) 

7)

 

Preload the canvas (Fig 8) 

 
Position both actuators on top of the hardtop resting on the bottom half of the mounting clamps (Fig 1). 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Insert the outer crossbar and/or clamp roller to the actuators and measure across to align the actuators to be 
parallel (Fig 2). 

  NOTE – the actuators must be aligned (parallel) to ensure proper functioning of the shade 

system.

 

 
 

 

Fig 1 

 

Fig 2 

Insert outer 

crossbar 

and/or 
clamp roller 

to actuators 

Measure across to 

make actuators 

parallel 

Summary of Contents for ATF

Page 1: ...6 6 Set up the electrical system Fig 7 7 Preload the canvas Fig 8 Position both actuators on top of the hardtop resting on the bottom half of the mounting clamps Fig 1 Insert the outer crossbar and or clamp roller to the actuators and measure across to align the actuators to be parallel Fig 2 NOTE the actuators must be aligned parallel to ensure proper functioning of the shade system Fig 1 Fig 2 I...

Page 2: ...e the mounting clamp to the hardtop in the marked locations Secure actuators to the mounting clamps and slide the roller assembly onto actuators and secure in place Fig 4 Slide crossbars onto actuators and secure in place Fig 4 Slide roller assembly onto actuators Fig 5 Fig 6 Secure aft crossbar in place with screw Secure mid crossbar in place with screw Fig 3 Fig 3A Mark the position of the mount...

Page 3: ...second until the slower actuator catches up and then continues movement again 1 All control wires for the actuators to the controller and connection from the boat power are supplied with Deutsch connectors Once the control wiring for the actuators is properly fed through tubing and fiberglass connect one end of the control wire to the actuator and the other end to the electrical housing 2 Connect ...

Page 4: ...oller in the direction of the arrows Preload the roller several revolutions by rotating the canvas and roller in the same direction that the canvas comes off the roller in the direction of the arrows and zipper to outer crossbar Do as many revolutions as necessary to make sure that the canvas is taut Fig 8 ...

Reviews: