PO Box 51294 Philadelphia, PA 19115 • Phone: 877.333.8323 • www.sureshade.com
SureShade Installation
1)
Mark the position of the mounting clamps (Figs 1 – 4)
2)
Secure the mounting clamps in place
3)
Secure the actuators in place
4)
Secure the roller assembly in place
5)
Secure the crossbars in place (Fig 5 – 6)
6)
Set up the electrical system (Fig 7)
7)
Preload the canvas (Fig 8)
Position both actuators on top of the hardtop resting on the bottom half of the mounting clamps (Fig 1).
Insert the outer crossbar and/or clamp roller to the actuators and measure across to align the actuators to be
parallel (Fig 2).
NOTE – the actuators must be aligned (parallel) to ensure proper functioning of the shade
system.
Fig 1
Fig 2
Insert outer
crossbar
and/or
clamp roller
to actuators
Measure across to
make actuators
parallel