background image

Pipe centres left to right 

=

Pipe centres from wall  

=

Depth from wall 

=

width of radiator plus valves

70mm 

 

  

120mm

Drawings

Pipe Centres

www.supplies4heat.co.uk    01342 306880

Aluminium Radiator in White
Horizontal and Vertical

Please read these instructions and terms and conditions carefully 
prior to installation. Failure to do so may invalidate the warranty.

SAXON

Fitting Instructions

Drawing 2 - Bracket Positions

Drawing 1 - Bush Configurations

2 x Right 
Hand 
Brackets

2 x Left 
Hand 
Brackets

Tighten ‘S’ 

 

Anti-clockwise

Tighten ‘D’  

Clockwise

SAX_IR_1.1

SAXON radiators have specific left and right hand threaded 
bushes and these can be easily damaged if forced or incorrectly 
fitted (this will inevitably cause leaks).

 Bushes require a dry fit 

connection only; you must not use any Compound materials 
(e.g. Jet Blue) or Plumbers Hemp.

 I

f you choose you may use 

up to 4 turns of PTFE tape to help seal the threads (the tape 
should be applied in the direction of the thread and no more 
than this amount should be used as this may cause leaks to occur) 

If looking directly at the front of the radiator, the two 
bushes with an ‘S’ cast on them are positioned on the 
left and turned anti-clockwise. The two bushes cast with 
a ‘D’ are positioned on the right and turned clockwise. 

 

Please see Drawing 1 

Reviews: