manualshive.com logo in svg
background image

P H - L W 1 5 - B L P / 1 7 A

    LASER

 

CHILLE RS

USER

 

MANUAL

SUNRISE CHILLING PRODUCT SERIES

Shenzhen

 

Sunrise

 

Industrial

 

Co

.

Ltd

.

rd

Add

.:

No.4

,

the 4th Tengfeng Road ,th e

 

3

 

Industry

 

Zone

 

Fenghuang

,

Fuyong

,

Baoan

 

District

,

Shenzhen

,

China

P

.

C

.:

518103

Tel

:+

86

 

755

 

3393

 

5303

Fax

:+

86

 

755

 

29974586

email

:

info

@

dly

-

china

.

com

URL

:

http

://

www

.

dly

-

china

.

com

Содержание PH-LW15-BLP/17A

Страница 1: ...ILLING PRODUCT SERIES Shenzhen Sunrise Industrial Co Ltd rd Add No 4 the 4th Tengfeng Road the 3 Industry Zone Fenghuang Fuyong Baoan District Shenzhen China P C 518103 Tel 86 755 3393 5303 Fax 86 755...

Страница 2: ...LASER CHILLER OPERATORS MANUAL 20 Notes SUNRISE SUNRISE SUNRISE SUNRISE Notes...

Страница 3: ...oop system 3 7 Start up 4 Operation 10 4 1 Temp Controller 4 2 Error codes and trouble shooting 5 Maintenance 14 5 1 Condenser vent hole filter screen 5 2 Water circuit 5 3 Water level 5 4 Periodic cl...

Страница 4: ...user Your chiller is packed in special carton package please reserve the carton and other packing stuff before you can make sure chiller is running properly If the chiller doesn t work the chiller co...

Страница 5: ...oling effects Automatically cooling and heating alternating the display accuracy can reach 0 1 and temperature stability is 0 3 0 5 3 Use famous brand electric fan which offersbig air volume low noise...

Страница 6: ...Temp Controller panel Lock catch Front Top 4 5 6 7 8 4 Water outlet 5 Water inletl 6 Drain Back 7 Signal wire hole 8 Wheel 3 16 3 1 2 7 2 Cooling system Fan Drier Filter Cooling Solenoid Valve Capill...

Страница 7: ...ir Discharge m3 h Inlet Outlet Drain compressor power HP 1PH 220V 50Hz or 60HZ 3 5 Inner Thread DN15 1 2 cooling capacity R134a Power supply refrigerant 820 36 7 Maintenance and technical support 7 1...

Страница 8: ...diameter of the pipe is too small Please check whether the fluid viscosity is too high Please check the connection tube carefully 6 4 insufficient cooling or No cooling Please check whether the voltag...

Страница 9: ...her the temp of the installation site is too high and ventilation condition is bad Slightly refrigerant leakage E3 error has been reported yet Whether the chiller has exceeded its designed lifetime re...

Страница 10: ...ghtly connected and current frequency should be match with the requirements marked on the label which was pasted on the back of the chiller 3 4 Connection accessories Process pipeline There are 2 inne...

Страница 11: ...lue 20 default value 0 1 default 1min System standby water tank temp xx setting temp xx Temp differential xx default value 20 default value 0 1 4 Press set button to enter function option chosen optio...

Страница 12: ...width then wrap the connection for 3 4 circles tighten up the seal tape before installation screw the connection gently in order to avoid PVC connection break 2 Strain the seal tape and twist around t...

Отзывы: