background image

381-404H WHEELCHAIR SWING 

Installation Guide 

 

 

 

 

INSTALLATION INSTRUCTIONS 

381-404H 

ACCESSIBLE WHEELCHAIR SWING 

Please read the entire manual before beginning installation. 

 

3 CTN      5 PIPE      2 WF      10 TOTAL PCS      265# WEIGHT      CLASS 70 

Summary of Contents for 381-404H

Page 1: ...HEELCHAIR SWING Installation Guide 1 INSTALLATION INSTRUCTIONS 381 404H ACCESSIBLE WHEELCHAIR SWING Please read the entire manual before beginning installation 3 CTN 5 PIPE 2 WF 10 TOTAL PCS 265 WEIGH...

Page 2: ...381 404H WHEELCHAIR SWING Installation Guide 2...

Page 3: ...381 404H WHEELCHAIR SWING Installation Guide 3 dm 04 30 20...

Page 4: ...g them to the part list and component instruction pages Always compare the number of pallets cartons or other items the BOL has listed with the number actually received Note the any discrepancies on t...

Page 5: ...esigned to install on a clear and level site There should be no more than 3 of grade variations in a 10 span Footing layout is the first critical step once the installation begins Mark all holes using...

Page 6: ...n and Public Affairs Washington DC 20207 USA Call 1 800 638 2772 US and Canada only Call 301 504 0990 Direct Link http www cpsc gov For a copy of either the standard for surfacing ASTM F1292 or for pl...

Page 7: ...digger Wheelbarrow Large construction bar 5 Claw hammer Large dead blow rubber hammer Small sledgehammer to use in blocking the posts Strong and sturdy step ladders Extension cords power supply Level...

Page 8: ...sed immediately A maintenance section is included in the appendix of this instruction booklet If a part is missing or damaged the playground must be put out of service while the part is replaced Lack...

Page 9: ...e 2 Once the structure is in the desired location within the play area mark the locations of the post by inserting a stake into the center of each post location see drawing below for an example If usi...

Page 10: ...you may start installing concrete You must use concrete with a minimum of 2 500 psi 2 Always pre mix the concrete to the manufactures directions before pouring it into the hole Never put dry concrete...

Page 11: ...at some point you may want to apply lubricating oil to the hardware Stainless steel hardware has a tendency to seize so if you are planning on removing the hardware you may want to apply lubricant to...

Page 12: ...g from dangerous heights displacing of surfacing etc Inspecting for missing or broken equipment Do not allow children to play on broken equipment or equipment with missing components Keep children in...

Page 13: ...removes the swing platform of secures it to the nearest support to prevent unsupervised mis use of the equipment Additionally it is recommended that a barrier be placed in front on the sides and behi...

Page 14: ...IR SWING Installation Guide 14 X SET SCREW D SHACKLE 2 3 8 SWING HANGER 5 16 X 1 BUTTON HEAD NUT 5 16 X 2 BUTTON HEAD BOLT 5 16 LOCK WASHER 3 16 ALLEN WRENCH YELLOW BAG ALLEN WRENCH BLUE BAG 5 16 ALLE...

Page 15: ...381 404H WHEELCHAIR SWING Installation Guide 15 COMPONENT INSTALLATION INSTRUCTIONS...

Page 16: ...required MAINTENANCE As the owner of the playground you are responsible for maintenance of the equipment and play area A maintenance schedule must be developed and the equipment inspected frequently A...

Page 17: ...ain ASM 1 3 383 416 HD Front Platform Chain ASM 1 4 186 403 x 1 Flat Head Screw 12 5 226 402 Lock Nut 12 6 342 506 D Shackle 2 7 416 500BPK 5 16 Socket Key 1 8 805 532 Warning Label 1 9 805 534 Sports...

Page 18: ...382 408 HD WHEELCHAIR SWING PLATFORM INSTALLATION INSTRUCTION Note The swing hanger s pivot point to the ground should be 91 which will result an approximate 4 distance from the bottom of the platform...

Page 19: ...until the unit is completely assembled and all components are square and level Identify and separate all parts by referencing the detail drawings and the parts list As you unpack and separate the comp...

Page 20: ...x lock nuts 5 one Main Platform 1 one Back Platform 2 Place the back platform on top of the Main Platform then secure it with the bolts and lock nuts See Detail A __4 Attaching Front Platform to Main...

Page 21: ...atform into an operational position __2 One person must hold the platform in position while the other person is placing the wheelchair on the platform __3 The long restraining chain must be unsnapped...

Page 22: ...r added safety the long restraining chain can be positioned across the chest of the occupant The short restraining chain is then available as a Hand Hold for the occupant Both restraining chains have...

Page 23: ...le who are bound to a wheelchair to swing This unit can cause serious injury if used in an un supervised area where other children are playing Should a child run into the use are of this product while...

Page 24: ...d MAINTENANCE As the owner of the playground you are responsible for maintenance of the equipment and play area A maintenance schedule must be developed and the equipment inspected frequently A mainte...

Page 25: ...506 D Shackle 2 6 196 802 x Socket Set Screw 6 7 116 545 5 16 x 2 Button Head Bolt 2 8 216 512 5 16 x 1 Button Head Nut 2 9 326 501 5 16 Lock Washer 2 10 416 350 3 16 Socket Key 2 11 416 500BPK 5 16...

Page 26: ...ottom of the support post on a suitable flat blocking material to prevent it from sinking further into the soil We recommend you use a brick block of wood or several inches of gravel The footing depth...

Page 27: ...April 8 2020 4 381 404H WHEELCHAIR SWING INSTALLATION INSTRUCTION ELEVATION AND FOOTING LAYOUT VIEW...

Page 28: ...ake an adjustment It is recommended that you add a drop of oil to bolts that may have to be removed before you install them Do not tighten bolts all the way until the unit is completely assembled and...

Page 29: ...correct position Assemble swing frame on side on ground If more than one section assemble section by section __4 Attach Swing End to Legs To do this you will need four 1 7 8 x 11 pipe 2 two swing end...

Page 30: ...dig holes __8 Stand swing upright onto legs and brace in footing holes so that 2 3 of pipe will be under intended level of resilient surfacing and the top rail is at desired height Plumb and level en...

Page 31: ...s set back fill dirt over the footing holes inspect the area and components for tools hazardous debris and sharp edges Verify all components are installed and all hardware is tight and then install th...

Reviews: