background image

Table of Contents

1. 

General 

Notes     

  p.2

2. 

Description & Equipment Adjustments 

  

 

p.3

3. 

Components, Features & Functions   

 

 

p.4

4. 

Valve 

User 

Interface 

     p.5

5. 

Installation 

Instructions 

    p.6

6. 

Assembly 

Start-Up 

     p.7

7. 

Programming 

Operation 

    p.9

8. 

Master 

Programming 

Mode 

    p.11

9. 

User 

Programming 

Mode 

    p.16

10. 

Diagnostic 

Programming 

Mode 

   p.17

11. 

Programming 

Charts 

     p.18

12. Troubleshooting 

    

 

  p.19

13.

 

Cautions 

      p.21

14. 

Technical 

Information 

     p.22

Installation, Service &

Operation Manual

SoftH

2

O DUO

Spectrum

TM

Water Softener

Summary of Contents for SoftH2O DUO 100

Page 1: ...allation Instructions p 6 6 Assembly Start Up p 7 7 Programming Operation p 9 8 Master Programming Mode p 11 9 User Programming Mode p 16 10 Diagnostic Programming Mode p 17 11 Programming Charts p 18 12 Troubleshooting p 19 13 Cautions p 21 14 Technical Information p 22 Installation Service Operation Manual SoftH2 O DUO Spectrum TM Water Softener ...

Page 2: ...el expires This manual is for a range of softeners based on the fleck 9000 9100 9500 with various volumes of resin going from 30 to 350 litres Please take a look at the model supplied as this will have an influence on various parameters for starting up your softener especially during programming Once installed softeners are low in maintenance and only require a top up of salt in order to operate p...

Page 3: ...ber Inlet Water Hardness tH Tank Size Treated Water Volume litres Resin Type Outlet Water Hardness tH Resin Volume litres Salt Quantity per Regeneration kg Chronometric days Down Flow Brining 1 Backwash min 2 Brining Rinse min 3 Rapid Rinse min 4 Brine Tank Refill min Low Voltage DC Transformer 2 Description Equipment Adjustments ...

Page 4: ...ion efficiency Rinse Rinse the resin bed to remove the residual regenerant salt after the brining step until the water from outlet contains no regenerant rinse could also compact the resin bed for a better softening effect Refill Refill the brine tank with water to dissolve salt for the next regeneration Valve Operation Mode Softener Duplex water softener operation Regeneration Mode Volumetric imm...

Page 5: ...5 4 Spectrum TM 4 Valve User Interface Down Button Up Button Extra Cycle Button Cover Unlocking Nut Service Icon Time Data Display Drain Line ...

Page 6: ...t at least one drinking water tap is not connected to the softener Softened water has a high Sodium content which is to be avoided for people on low sodium or salt diets babies on infant formulas 5 1 Connecting 1 Two drain connections will be required The first drain should be connected directly to the valve For the 9000 9100 a hose for 9500 a BSP The diameter of the flexible drain hose should be ...

Page 7: ...ng spilt CAUTION Resin can present a serious slip hazard if excessive amounts are spilt 4 Lubricate the internal valve O ring with 100 silicon lubricant and screw the valve onto the top of the pressure vessel again making sure that the distribution system locates securely into the valve body 5 Repeat steps 1 4 for the secondary slave vessel 6 Connect one end of the brine tube to the valve and the ...

Page 8: ...ow water to flow into the pressure vessels 8 Open a cold soft water tap nearby and allow to run until the system has been purged of air 9 Plug the valve into a power source Once the valve has been connected to a power source it may cycle on its own in order to return to the service position 10 Start regeneration by pressing the button on the controller and to bring the 2nd slave vessel into servic...

Page 9: ...w chart A H Feedwater hardness Hardness of inlet water RS Reserve selection SF Percentage safety factor rc Fixed reserve capacity SF Safety factor Percentage of the system capacity to be used RC Fixed reserve Fixed volume to be used as a reserve DO Day override The systems day override setting RT Regen time The time of day the system will regenerate BW BD RR BF Regen cycle step times The time dura...

Page 10: ...ce Icon flashes if a regeneration cycle has been queued Regeneration can be triggered immediately by pressing the Extra Cycle button for five seconds The Parameter Display shows the current Cycle Step BW BF RR etc during regeneration and the data display counts down the time remaining for that cycle step While the valve is transferring to a new cycle step the display will flash The parameter displ...

Page 11: ...nd Down buttons together until the programming icon replaces the service icon and the Display Format screen appears 8 3 Exiting Master Programming Mode Press the Extra Cycle button to accept the displayed settings and cycle to the next parameter Press the Extra Cycle button at the last parameter to save all settings and return to normal operation The control will automatically disregard any progra...

Page 12: ...the Extra Cycle button Use this display to set the Control Type This specifies how the control determines when to trigger regeneration For details on how the various options function refer to the Timer Operation section of this service manual This option setting is identified by CT in the upper left hand corner of the screen 4 Number of tanks NT 2 Press the Extra Cycle button Use this display to s...

Page 13: ...er the feed water hardness in the same unit chosen for determining the capacity volume for softener systems This option setting is identified by H in the upper left hand corner of the screen Use the Up and Down buttons to adjust the value as needed 8 Reserve selection RS rc Press the Extra Cycle button Use this display to set the Safety Factor Use this display to select the type of reserve to be u...

Page 14: ...n Use the Up and Down buttons to adjust the value as needed This parameter is dependant by your individual needs 12 Regeneration time RT Press the Extra Cycle button Use this display to set the Regeneration Time This setting specifies the time of day the control will initiate a manually queued or day override triggered regeneration This option setting is identified by RT in the upper left hand cor...

Page 15: ...is display to set the current day on systems that have been configured as Day of Week controls This setting is identified by CD in the upper left hand corner of the screen Use the Up and Down buttons to select from Day 1 through Day 7 16 Flow meter type FM Press the Extra Cycle button Use this display to set the type of flow meter connected to the control This option setting is identified by FM in...

Page 16: ... Operation Parameter Description Parameter Image 1 Day override DO Use this display to adjust the Day Override This option setting is identified by DO in the upper left hand corner of the screen 2 Regeneration time RT Press the Extra Cycle button Use this display to adjust the Regeneration Time This option setting is identified by RT in the upper left hand corner of the screen 3 Feed water hardnes...

Page 17: ...t Flow Rate This option setting is identified by FR in the upper left hand corner of the screen It is expressed in m3 hr 2 Peak flow rate PF Press the Up button Use this display to view the Peak Flow Rate since the last regeneration cycle This option setting is identified by PF in the upper left hand corner of the screen Its expressed in m3 hr 3 Hours in service HR Press the Up button Use this dis...

Page 18: ...art Parameter Softener Capacity C Backwash BW Brine draw BD Rapid rinse RR Brine refill BR Total Flow meter FM WTP SOFT30D 150 6 60 4 12 82 0 75 WTP SOFT50D 250 6 70 4 10 90 0 75 WTP SOFT75D 375 6 70 4 13 93 0 75 WTP SOFT100D 500 6 70 6 10 92 0 75 WTP SOFT150D 750 8 80 8 16 112 1 5 WTP SOFT250D 1250 10 90 10 14 124 1 5 WTP SOFT350D 1750 10 90 10 18 128 1 5 ...

Page 19: ... pressure must be at least 20 psi 2 Clean brine line 3 Clean or replace injector screen 4 Check piston seals and spacers H Brine container overflow 1 Refill time too long 1 Contact your supplier for assistance I Water hardness remains 1 Fail to regenerate automatically 2 Brine concentration is poor 3 Injector is plugged 1 Check power of controller 2 Keep brine tank full of salt 3 Disassemble the i...

Page 20: ...pressure 1 Iron or scale builds up in line feeding unit Clean pipes 2 Iron build up inside valve or tank Clean control and add resin cleaner to clean the bed Increase regeneration frequency 3 Inlet of control blocked due to foreign matter Remove piston and clean control valve F Too much water in brine tank 1 Blocked injector or screen Clean parts 2 Foreign material in brine tank Clean parts G Unit...

Page 21: ...is not less than 3 meters It is recommended to install a check valve between the filter and the boiler if unable to meet the required piping length 8 The input water pressure must be between 2 8 bar 9 No chemicals should be present at the inlet and outlet connecting sectors 10 Besides the system spare part connection materials are not included in the scope of the manufacturer s warranty 11 The req...

Page 22: ...9100 FLECK 9500 FLECK 9500 FLECK 9500 Drain 1 1 1 1 1 1 1 Brine Line Power Requirements V 240V 50Hz 240V 50Hz 240V 50Hz 240V 50Hz 240V 50Hz 240V 50Hz 240V 50Hz Resin Volume l 30 50 75 100 150 250 350 Salt Consumption Per Regeneration kg 4 5 7 11 14 21 35 50 Pressure Tank Thread 2 2 2 4 4 Vessel Size 09x35 10x54 13x54 14x65 16x65 21x62 24x72 Brine Tank Volume l 140 140 140 350 350 350 500 Brine Tan...

Reviews: