background image

Ginlong Technologies Co.,  Ltd. 
No. 57 Jintong Road,  Binhai Industrial Park, Xiangshan,  Ningbo, 
Zhejiang,  315712,  P.R.China. 

Tel: +86  (0)574  65781806 
Fax: +86  (0)574  65781 6 06 

Email:[email protected] 

Web:www.ginlong.com 

Please adhere to the actual products in case of any discrepancies in this user manual. 

If you encounter any problem on the inverter, please find out the inverter S/N 

and contact us, we will try to respond to your question ASAP. 

O

solis 

Solis RHl-5G Series Hybrid  Inverter 

Instruction Manual 

Ver  1.5 

Ginlong Technologies Co.,  Ltd. 

Summary of Contents for RH l-6K-48ES-5G

Page 1: ...mail info ginlong com Web www ginlong com Please adhere to the actual products in case of any discrepancies in this user manual If you encounter any problem on the inverter please find out the inverter S N and contact us we will try to respond to your questionASAP Osolis Solis RHl 5G Series Hybrid Inverter Instruction Manual Ver 1 5 Ginlong Technologies Co Ltd ...

Page 2: ...12 4 4 Battery Terminal Components 13 4 5 Assembling the AC Connector 14 4 6 Meter Installation 16 4 7 Communication Cable Assembly 18 4 8 External ground connection 19 4 9 Logic interface connection 20 4 1 O Inverter monitoring connection 21 4 11 LED Indicates 22 5 Operation 23 5 1 Initial Display 23 5 2 Main Menu 25 5 3 Information 25 5 4 Settings 28 5 5 Advanced Info 30 5 6 Advanced Settings Te...

Page 3: ...isplay 1 Introduction 1 2 Packaging Please ensure that the following items are included in the packaging with your machine lnverterx1 AC backup terminalx1 CAN cablex1 Terminal coverx1 E User manualx1 Back platex1 DC connectorx2 Rs485 Meter cablex1 For AcreI Meter 0 S O 0 ft S 1111 Acrel Meter with GTx1 For Other markets Fastening screwx3 o I Oo RJ45 connectorx1 Only for UK Rs485 Meter cablex1 For ...

Page 4: ...quired for circuits connected to the inverter The DC OCPD shall be installed per local requirements All photovoltaic source and output circuit conductors shall have isolators that comply with the NEC Article 690 Part 11 All Solis single phase inverters feature an integrated DC switch CAUTION Risk of electric shock do not remove cover There is no user serviceable parts inside refer servicing to qua...

Page 5: ...ding to the correct technical specifications 3 Overview 3 1 Screen Solis RHl 5G Series adopts 7 inch color screen it displays the status operating information and settings of the inverter 3 2 Keypad There are four keys in the front panel of the inverter from left to right ESC UP DOWN and ENTER keys The keypad is used for Scrolling through the displayed options the UP and DOWN keys Access and modif...

Page 6: ...ires Do not install the inverter in areas containing highly flammable materials or gases Do not install the inverter in potentially explosive atmospheres 4 Installation Install on a wall or strong structurecapable of bearing the weight of the machine 17kg Install vertically with a maximum incline of 5 degrees exceeding this may cause output power derating To avoid overheating always make sure the ...

Page 7: ...he mounting height of the bracket and mark the mounting holes For brick walls the position of the holes should be suitable for the expansion bolts Suitable fixing screws Bracket Figure 4 4 Fix bracket on the wall 4 Installation WARNING The inverter must be mounted vertically 2 Lift up the inverter be careful to avoid body strain and align the back bracket on the inverter with the convex section of...

Page 8: ...erminal i 1 1 I I Use appropriate crimping tools for crim ping Figure 4 6 Inverter terminal 4 Installation 4 4 Battery Terminal Components To avoid DC Arc Solis recommends installing DC switch between batteries and Hybrid Inverter Ensure the correct polarity of batteries before connecting to the inverter WARNING Power cables use water proof A M PHENO L connectors When pull out the power cable you ...

Page 9: ... 12mm 2 Lead the AC cable through the cablegland and the housing 3 Remove a length of 40mm of the cable jacket and strip the wire insulation to a length of 8 15mm 4 Installation 4 Each of the terminals are labeled Ensure that the correct conductor is fastened 1 2 N m torque to the correct terminal WARNING Observe theterminallayoutofterminalblock Do not connect the phase lines to PE terminal otherw...

Page 10: ...clude Italy Below 4 6 2 section describes the connection diagram of the Eastron 1ph meter Direct Insert Standard Accessory for Italian market 4 6 1 Single phase meter installation RS485 Meter COM N L I 7 i I Dlu v o E RCD f RJ45 _J Poll i CT direction i towards to grid 16 i RHl 5K 41ES E CB RS485 _____________ L N GRID PE Battery Grid Load_a Figure 4 8 Power cable Communication cable Note If the C...

Page 11: ... need BTS battery temperature sensor which is connected to CAN port at one side and battery negative pole at the other side BTS is optional For further information pleasecontact the sales manager For lead acid battery battery SOC calculation may not be accurate according to battery inconformity between cells battery aging or other specifications of lead acid battery etc 4 Installation NOTE For CAN...

Page 12: ...n use a network cable crimping tool to make it tight Rj45terminal Correspondence between the cables and the stitches of plug Pin5 and Pin6 of RJ45 terminal is used for the logic interface other Pins are reserved Pin 1 Reserved Pin 2 Reserved 1 2 3 4 5 6 7 8 Pin 3 Reserved Pin 4 Reserved Switch_input2 Pin 5 Switch_input 1 Pin 6 Switch_input2 Swilch_input1 DRM logic interface Pin 7 Reserved Pin 8 Re...

Page 13: ...ng ON Fault condition is detected ALARM OFF No fault condition detected FLASHING Either the grid or solar cannot be detected Table 4 1 Status I n d i cator Lig hts 22 5 Operation ESC Monthly Energy 1 ESC Pressing the ESC key calls back the pre vious menu Main interface Pressing the ENTER key to switch to the submenu Figure 5 1 Operation Overview 5 1 Initial Display main menu WN advanced settings W...

Page 14: ...Smart Meter When the smart meter is connected successfully it will display RS485 OK otherwise RS485 Fail o Critical Loads Loads connected to the AC Backup port which will be supported by battery and solar even if the grid is in malfunction tf Grid The arrow and value indicate the export import power of the hybrid system 5 Operation 5 2 Main Menu There are four submenu in the Main Menu 1 Informatio...

Page 15: ...Information 201 5 02 23 1 9 35 Grid Meter PV Inverter Meter Meter Voltage 000 0V Meter Voltage 000 0V Meter Current oo 00A Meter Current oo 00A Meter Power 000000W Meter Power 000000W Meter Energy 0000 00kWh Meter Energy 0000 00kWh Input Energy 0000 00kWh Input Energy 0000 00kWh Output Energy 0000 00kWh Output Energy 0000 00kWh 4 4 Figure 5 8 Information Page 4 NOTE Meter Power Grid Power Positive...

Page 16: ...ill update the inverter time based on the time zone of the system Press UP and DOWN to change the value Press ENT to mover the cursor Press ESC to save the change Set Time Date 201 5 02 23 1 9 35 yy mm M M 2 H H M M 20 53 O D 23 N EXT E N T D O N E E S C Figure 5 10 Set Time 5 Operation 5 4 2 Set Add ress Set the slave addressof the inverter The default addressis 01 Set Address 201 5 02 23 1 9 35 ...

Page 17: ...O Grid NO Grid NO Grid Date Time 02 23 19 35 02 23 19 34 02 23 19 34 02 23 19 24 02 23 18 22 01 40 Figure 5 14Alarm Message Date 0000 0000 0000 0000 0000 5 Operation 5 5 2 Running Message This function is for maintenance person to get running message such as internal temperature Standard NO etc Values are for reference only 5 5 3 Version Running Message 201 5 02 23 1 9 35 DC Bus Voltage Reactive P...

Page 18: ...e screen shows the daily energy detail of the inverter Daily Energy 201 5 02 23 1 9 35 60 1 50 I 40 1 30 _________ ____ ____ 20 1 00 r r r l 0 0 0 0 03 00 06 00 0 9 0 0 1 2 0 0 1 5 0 0 1 8 00 2 1 00 0 0 0 0 2 0 1 5 f 2 3 Figure 5 18 Daily Energy 5 Operation 5 5 6 Monthly Energy The screen shows the inverter monthly energy detail of different month Monthly Energy 201 5 02 23 1 9 35 600 1 500 1 l 40...

Page 19: ...y NOTE This function is for authorised technicians only Improper access and operation may result in abnormal results and damage to the inverter Password required restricted access authorised technicians only Un authorised access may void the warranty Password 001O Select Advanced Settings from main menu the LCD screen show the password is needed Password 201 5 02 23 1 9 35 Please Input The Cu rren...

Page 20: ...top the generation of the inverter ON OFF 201 5 02 23 1 9 35 STOP Y E S E N T N O E S C Figure 5 26 Set ON OFF 5 Operation 5 6 3 Calibrate Warranty or maintenance may result in resetting total generating data this function allow the maintenance personnel to amend the total generating data of replacement inverter to the original one By using our data monitoring hardware the data on monitoring websi...

Page 21: ...e setting battery cont rol setting etc Storage Energy Set 201 5 02 23 1 9 35 Battery Select Meter Select Storage Mode Select Battery Wakeup Figure 5 31 Storage Energy set 5 6 6 1 Control Parameter Enterthe Control Parametermenu as shown below Don t change the settings without the permission of technicians Control Parameter 201 5 02 23 1 9 35 Backup Supply Disable Floating Charge 055 0V Backup Vota...

Page 22: ...ect Zeta NOTE If hybrid inverter is not connected to a battery select No Battery to avoid alarms For above compatible battery modules Only two parameters need to be defined OverDischg SOC 10 40 default 20 Inverter will not discharge the battery when the OverDischg SOC is reached Battery self discharge is unavoidable SOC may go lower than the limit if the battery can t get charged for a long period...

Page 23: ...fine the voltage that stops discharging the battery 6 Force Charg Voltage Define the voltage that forces to charge the battery to prevent a dead battery 7 I_Max Discharge Define the max discharge current for the battery 8 I_Max Charge Define the max charge current for the battery 9 Temp Compensation Define the temperature compensation parameter for the battery After configuration save and send Sel...

Page 24: ...n 3ph meter Eastron 3ph meter With CT SDM630MCT Optional Eastron 3ph meter No meter is connected No Meter 5 Operation 5 6 6 3 2 Meter Placement Grid Meter is installed at the grid connection point Load Meter is installed at the load branch circuit Grid PV Inverter One meter is connected at the grid connection point the other meter is connected at the AC output port of an extra PV inverter Eastron ...

Page 25: ...allation do not active battery wakeup function before finishing the first commissioning 5 6 7 Export power Set 46 This function is to set the export power control 1 Backflow Power 2 ON OFF 3 Failsafe ON OFF Setting 1 3 are only valid when Setting 2 is set to ON Export power Set 201 5 02 23 1 9 35 ON OFF Fa1ISafe ON OFF Figure 5 44 Export power Set 5 Operation 5 6 7 1 Backflow Power Determine the a...

Page 26: ...e Current Version FO CAN C E E S C UPDAT E SYSTE M E N T Figure 5 48 HMI Update 5 Operation 5 6 9 DSP U pdate This function is used to update DSP software Values are for reference only DSP Update 201 5 02 23 1 9 35 The Current Version 00 CAN C E E S C UPDAT E SYSTE M E N T Figure 5 49 DSP Update 5 6 10 Baud Rate RS485 This function is to change the internal communication Baudrate BaudRate RS485 20...

Page 27: ...tact after sales engineer or technical support WARNING The AFCI Level is reserved for technicians ONLY Do not change the sensitivity otherwise it will lead to frequent false alarms or malfunctions Manufacturer is not responsible for any further damages caused by unauthorized modifications 5 Operation WARNING The setting corresponds to the current status as well which can be used to inspect the ON ...

Page 28: ...rameters 5 Switch on AC backup and AC grid 6 Verify inverter initializing 6 3 Shutdown procedure 1 Turn off the AC isolator at the grid connection point 2 Turn off the DC switch of the inverter 3 Turn off the DC switch between inverter and battery 4 Waiting for the LCD of inverter to turn off and the system shutdown is completed 52 7 Maintenance Solis RHl 5G Series inverter does not require any re...

Page 29: ...aults occur the Fault state will be shown on the main screen Follow the steps below to check what fault occurs Steps Enter Down Advanced Information Enter Alarm Message Step1 Press ENTER Status Generating 2017 05 04 09 48 O OOkW 1 i CAN OK 0 00kW RS4850K cm mo I 0 00kW Tirr r ilc f ACBackup 0 00kW M E N U E N T M O N T H LY E N E RG Y E S C Step2 Press DOWN to select Advanced Information then pres...

Page 30: ...kup overvoltage fault 1 Restart inverter or contact installer IG AD Grid current sam pling fail 1 Check inverter surrounding ventilation ILeak PRO leakage current protection 1 Check AC and DC connection 01 02 03 04 2 Check inverter inside cable connection OV TEM O ver Tem perature 2 Check if there s sunshine direct on inverter in hot weather IN I FAULT Initialization system fault 1 Restart inverte...

Page 31: ...Solis Single Phase Inverter if available 3 Installation date 4 The description of problem i e the alarm message displayed on the LCD and the status of the LED status indicator lights Other readings obtained from the Information submenu refer to Section 6 2 will also be helpful 5 The PV array configuration e g number of panels capacity of panels number of strings etc 6 Your contact details 9 Specif...

Page 32: ...or G99 VD E AR N 4 1 05 VDE V 01 24 E N 50549 1 Power Factor 0 99 0 8 leading 0 8 lagging VDE 0 1 26 UTE C 1 5 VFR 20 1 9 RD 1 699 RD 244 Grid connection standard UN E 206006 UN E 206007 1 C E I 0 2 1 C 1 0 1 1 THDi 2 N RS 097 2 1 TOR E I FS 201 8 2 IEC 62 1 1 6 IEC 61 727 Efficiency I E C 60068 IEC 61 683 E N 50530 M EA PEA Max e fficiency 97 5 Safty EMC standard IEC E N 621 09 1 2 E N 61 000 6 2...

Page 33: ... 23 0A I 23 9A M PPT number Max input strings number 2 2 Power Factor 0 99 0 8 leading 0 8 lagging Battery THDi 2 Battery Type Li ion Lead acid Efficiency Battery Voltage range 42 58V Max efficiency 97 5 Battery Capacity 50 2000Ah EU e fficiency 96 8 Maximum Charging Power 5kW Protection Maximum Charge discharge current 1 00A Ground fault monitoring Yes Communication CAN Residual current mornitori...

Page 34: ...97 2 1 TOR E I FS 201 8 2 IEC 62 1 1 6 IEC 61 727 M PPT number Max input strings number 2 2 Battery I E C 60068 IEC 61 683 E N 50530 M EA PEA Battery Type Li ion Lead acid Safty EMC standard IEC E N 621 09 1 2 E N 61 000 6 2 3 Battery Voltage range 42 58V Features Battery Capacity 50 2000Ah DC connection MC4 connector Maximum Charging Power 5kW AC connection Quick connection plug Maximum Charge di...

Page 35: ...0549 1 Power Factor 0 99 0 8 leading 0 8 lagging VDE 0 1 26 UTE C 1 5 VFR 20 1 9 RD 1 699 RD 244 Grid connection standard UN E 206006 UN E 206007 1 C E I 0 2 1 C 1 0 1 1 THDi 2 N RS 097 2 1 TO R E I FS 201 8 2 IEC 62 1 1 6 IEC 61 727 Efficiency I E C 60068 IEC 61 683 E N 50530 M EA PEA Max e fficiency 97 5 Safty EMC standard IEC E N 621 09 1 2 E N 61 000 6 2 3 EU efficiency 96 8 Features Protectio...

Page 36: ...s Lock Button during pulling out the power plug G Connector Body 1 1 Barrel sealing Not included when no sealing requirement 1 2 0 Ring Not included when no sealing require ment Barrel Only for cable size 16mm2 Grommet Not included when no sealing requirement Back Shell 1 0 Append ix Step 1 Wire cutting andstripping Apply for 10mm2 16mm2 Cable Stripping conductor 18 1mm 1 8 1mm conductor Insulatio...

Page 37: ...2 cable apply assembly barrellnto lug firstly as shown 16 mm2 8 10 0 20 mm 7 5 0 0 2mm 1000N Min 25 mm2 10 20 0 20 mm 1200N Min Recommended crimping tool Manual hydraulic crimping Die 25 mm2 D Tie closely in here Step 5 Install grommet and back shel Step 4 Crimping the lug as shown assemble back shell ltem 4 onto the connector body ltem 1 and tlg 70 71 ...

Page 38: ...ode Logic Maximize the usage of PV PV Power Using Priority Load Battery Grid Load Support Priority PV Battery Grid Battery Charging Power comes from PV If Charging From Grid is allowed it can also come from Grid If Time of Use is Run the logic will follow the charging discharging settings and time settings as defined in Time of Use For those undefined period of time it will still follow the Self U...

Page 39: ...Total Time 14 00 N EXT E N T D O N E E S C Charging from gird for Feed for priority Path Advanced Settings Storage Energy Set Storage Mode Select Feed in Priority Mode O N Charging from gird for Feed for priority Charging from gird for Feed for priority 201 5 02 23 1 9 35 No Allow Y E S E N T N O E S C 1 0 Append ix Mode 3 Backup Mode Logic Keep the Battery at a certai n SOC and only use it during...

Page 40: ...l Solis NPS switching Box to achieve switching fu nction When grid is available only the Grid Port is enabled and load is supported through NPS box by the grid When grid is lost Grid Port will be disabled and after the Switching Time the Backup Port will be enabled and then load is supported through NPS box by the Backup Port It gives up the UPS function of the backup port and manually set the swi...

Page 41: ... Voltage Grid General E N50438 Requirement 4 E N50438 L Possible to be used in Austria Cyprus Finland Czech Republic Slovenia etc 5 E IFS SW Sweden For Swedish Low Voltage Grid 6 France France For French Low Voltage Grid 7 C10 11 Belgium For Belgian Low Voltage Grid 8 N R S097 South Africa For South African Low Voltage Grid 9 CEI0 21 Italy For Italian Low Voltage Grid 10 E N50549 L General E N5054...

Reviews: