background image

                                  

Assembly Instructions Greenhouse

 

Round Style 12 x 24 x 8  

 

 

 

V1 

Please Do NOT Return Assembly to Dealer or Store. For All questions or Shortages please call MDM Products directly 

Customer Service 800-447-7079 or 203-877-7070 

1

ASSEMBLY INSTRUCTIONS  

ROUND STYLE GREENHOUSE 

12Wx24Lx8H 

 

Congratulations! 

 

Congratulations on your purchase of a Round Extended 
Style Greenhouse by MDM Products LLC.  With proper 
installation, use, and maintenance, your new unit will 
provide many years of good and suitable service.  Your 
new Rhino Shelter greenhouse is a combination of 
excellent engineering and well thought out design.  The 
unit is comprised of a rigid tubular frame, covered with a 
long life polyethylene cover and double door ends.   
 
The multiple part frame is pre-drilled for easy insertion of 
hardware to assemble.  The tubing is made from high-
grade galvanized steel tubing, to resist moisture and 
oxidation over the life of the shelter.  The covering 
membrane is made from ASTM-5 approved polyethylene 
materials.  The cover is UV protected for continual 
exposure to the sunlight. 
 
It is suggested that you read the assembly instructions 
completely before you begin.  This will help attain the 
best results for your installation the first time.   

 

SAFETY & CODE WARNING 

The installation of this unit must conform to the 

requirements of all authorities having jurisdiction in 

your specific local area.  In the absence of such 

requirements, the installation must conform to the 

provided assembly and installation instructions.  

MDM Products LLC will not be responsible for failure 

to comply with any requirements in a given local 

area.  Consequential damages or injuries caused by 

improper installation, alteration, or improper use are 

strictly that of the user.  Unit MUST be cleared of All 

Snow Accumulation immediately to avoid overload.  

Unit is not to be used for occupancy for any length 

of time.  No running internal combustion engines, 

open flames, or contact with heated surfaces are 

allowed. 

 

For installation assistance or Customer Service, please 
call 800-447-7079 or 203-877-7070, 8AM-5PM EST. 
Cartons should be inspected upon delivery from carrier, 
and any evident damages should be noted on the bill of 
lading before signing.   If upon opening the cartons 
hidden damage is noted, contact carrier or its agent 
immediately.  Claims for shipping damage MUST be 
made with the shipping company.  An inspection of the 

goods will most likely be required.  Do not discard 
packing or any components before the freight company’s 
inspection.  All claims for freight damage must be made 
with 15 days of receipt of the goods in accordance with 
ICC regulations. 

 

ASSEMBLY PROCEDURE 

 

The proper sequence and steps to install this unit will 
produce a proper and good installation.  Failure to read 
and follow these guidelines may result in an improper 
installation and will void all warranty and protection the 
owner is entitled to with the product.  The steps to be 
undertaken are: 
 
1.  Perform an inventory check before beginning to be 

certain all components are available for installation. 

2.  Prepare location and place both unit boxes near 

location sight. 

3.  Assemble seven (7) frame arches of unit 
4.  Assemble unit end arch, first interior arch, and Wind 

Braces with first base rails and side rail sections. 

5.  Add additional arch assemblies with each section of 

base rails and side rails. 

6.  Place frame into desired position and level frame 

both end-to-end and side-to-side.  Measure interior 
of frame feet across opposite corners and square  

7.  Anchor frame assembly to ground with provided 

anchors, u-bolts and drive rod provided. 

8.  Install two(2) doors on both ends of frame assembly. 
9.  Install main cover over frame assembly. 

 

TOOLS REQUIRED 

 
The following hand tools will be needed for proper 
installation of your new Rhino Shelter unit: 

9/16” Open End Wrench 

9/16” Socket or Box Wrench 

Large Flat Tip Screwdriver 

Maul or Sledgehammer 

2 foot Level 

6-Foot Step Ladder 

 

INVENTORY CHECK 

 

Start installation procedure by removing all components 
from packaging and ensure all components are present 
 
Qty

No.

Part Number 

Description 

 

RUC-10000 

Main Unit Cover 

– 

122408RSK

 

 

DZD-5002 

End Panel Door with 
Double Zippers 

4 1 EUL-4021 

End 

Upright 

w/Foot 

Содержание 12Wx24Lx8H

Страница 1: ...nce or Customer Service please call 800 447 7079 or 203 877 7070 8AM 5PM EST Cartons should be inspected upon delivery from carrier and any evident damages should be noted on the bill of lading before...

Страница 2: ...4 CSU 4020 Center Straight Uprights 2 5 CW 1800 Corner Wind Brace 25 6 SCR 2030 Swedged Cross Ridge Poles 5 7 ECR 2031 End Cross Poles plain ends 8 TB 3004 Turnbuckles 35 CBN 3005 3 Carriage Bolts 3...

Страница 3: ...with the washers and nuts on the inside of the arches This will avoid tearing the fabric on doors and main cover when installed Do not tighten the nuts completely until the frame is completed and set...

Страница 4: ...under the End Top Crest Arch at the End arch Top Ridge Under End Arches Top Ridge Over Interior Arches NOTE Do not completely tighten bolts that connect the Cross Rails to the End Arches They must be...

Страница 5: ...ds of frame members NOTE Frame must be anchored before installing any doors or cover Each Rhino Shelter 12x24x12 greenhouse comes with 12 EARTH CABLE ANCHORS with U bolts and nuts These versatile anch...

Страница 6: ...removed by wrapping the cable around the tie down rail END PANEL INSTALLATION Note End panels MUST be installed before installing Main Cover onto frame Step1 Remove Carriage bolts from the Top Crest R...

Страница 7: ...slit another inch or two to relieve it The PE fabric is rip stop weave and can easily be cut to relieve stress at the frame members Step 3 Tie off one end of the rope coming out of the end panel to a...

Страница 8: ...er tying off one end of the rope in the Main Cover pull the excess slack out of the rope and cover Hold the end of the rope and push directly down with a foot onto the excess rope Temporarily tie the...

Страница 9: ...w accumulation on the main cover should be removed as soon as practical The days following a snowfall when snow melts are when the most damage can occur Unit is not designed for any amount of accumula...

Страница 10: ...r questions about the installation of the unit in any way Care and attention to a proper installation will add many years of life and function to your Rhino Shelter unit Please retain purchase documen...

Отзывы: