Summary of Contents for HTL 400

Page 1: ...Oil red Heating Centers Operation Technology REMKO HTL 400 Edition GB R11...

Page 2: ......

Page 3: ...antee 15 Environmental Protection and Recycling 15 Wiring diagram 16 Maintenance Log 18 Technical data 19 Made by REMKO Before commissioning use of the device these operating instructions must be read...

Page 4: ...he device always observe the respective local construc tion and re protection ordinances as well as the regulations of the employers liability insurance association Description of Device Mobile fuel t...

Page 5: ...matically This process may repeat itself several times Monitoring operation of the device All functions of the device are monitored safely and fully auto matically by the thermostat of the three fold...

Page 6: ...The provision of adequate safety clearance The function Room heating open blown or ducted low pressure or high pressure in the set up room General aspects Heat requirement room temperature nominal air...

Page 7: ...est performed using pipes or special hot air or lm hoses The lengths possible are dependent upon re sistance provided by the air ducting in use When using hot air hoses the following points must be ta...

Page 8: ...the seams of the hot air tubes must point in the direction of the air ow Secure fastening of the tubes and pipes at the exhaust and any connection points used must be observed Only suitable air diffus...

Page 9: ...o preclude errors in measurement each phase conductor and fan stage must be tested separately 2 The setting of the thermal over load relay should be performed as follows Stage 1 6 7 A Stage 2 17 0 A 3...

Page 10: ...c rotation direction monitor for the fan motor NOTE The electrical connection of the device must be performed at a dedicated supply point with an earth leakage circuit breaker in compliance with VDE 0...

Page 11: ...ccessories The devices operate fully auto matically depending on the room temperature 1 Remove jumper plug 2 2 Connect plug 3 of the room thermostat 4 to the thermostat socket 1 at the switch cabinet...

Page 12: ...e Keep the device free of dust and any deposits of dirt Only clean the device with a dry or damp cloth Do not apply any direct water spray e g high pressure hoses etc Do not use abrasive or cleaning s...

Page 13: ...screws to the unit housing Pay attention to the OBEN UP HAUT label 3 Tighten the 2 upper fastening screws 4 Tighten the 2 lower fastening screws only lightly so that the burner ange can be pulled toge...

Page 14: ...the sensors and capillary tubes of the safety devices for damage or dirt 7 Check that the temperature monitor TW for correct func tion using appropriate means 8 Check the forced air burner for possib...

Page 15: ...packaging material at the corres ponding disposal sites Disposal of the old device Manufacture of our equipment is subject to constant quality control Only high quality materials that are recyclable t...

Page 16: ...16 REMKO HTL 400 We reserve the right to make changes in dimensions and design in the interest of technical advance Wiring diagram...

Page 17: ...17 When ordering spare parts always list the EDP no as well as the device no and device type see the type plate Wiring diagram...

Page 18: ...set by authorised expert personnel in accordance with legal speci cations 1 BImSchV An appropriate test log must be kept Maintenance work may only be performed on the forced air burner by authorised e...

Page 19: ...1 Stage kW 245 Ventilating performance max 1 2 Stage m3 h 25000 Ventilating performance max 1 1 Stage m3 h 16600 Pressure max total 2 Stage Pa 1000 Pressure max total 1 Stage Pa 500 Fuel EL heating o...