background image

RAMSET T3 TOOL SYSTEMS

T3SS SINGLE SHOT, T3 MAGAZINE,  

OPERATOR’S SAFETY & OPERATING 

INSTRUCTION MANUAL

DANGER

READ AND OBEY ALL SAFETY AND OPERATING

INSTRUCTIONS BEFORE OPERATING TOOL.

GAS POWERED, LOW VELOCITY
PISTON TYPE FASTENING TOOL

  T3SS Single Shot 

T3 Magazine

T3SS

T3MAG

 & T3IF

Summary of Contents for T3SS

Page 1: ...T T3 MAGAZINE OPERATOR S SAFETY OPERATING INSTRUCTION MANUAL DANGER READ AND OBEY ALL SAFETY AND OPERATING INSTRUCTIONS BEFORE OPERATING TOOL GAS POWERED LOW VELOCITY PISTON TYPE FASTENING TOOL T3SS S...

Page 2: ...recharge refill or recycle fuel cells Never operate the T3 tool if flammable or explosive materials are nearby Just as no one can merely read a book about driving an automobile and then hope to drive...

Page 3: ...bility of the base material can result in serious injury to the eyes or other body parts Center Punch Test ALWAYS WEAR SAFETY GOGGLES WHEN PERFORMING THIS TEST 1 Always check the material being fasten...

Page 4: ...ee times the intended penetration depth into the concrete Driving fasteners too close to an edge or too close to each other can cause the concrete edge to fail or fasteners to fly free Fastening to Co...

Page 5: ...g Never place your hand or any other body part over the fastener loading end of the tool Never carry the tool with your finger on the trigger Never leave the tool unattended or allow anyone to operate...

Page 6: ...erving our environment and conserving our natural resources CHARGING INSTRUCTIONS 1 Connect the round plug of the wall mount unit to the front of the charger base and plug the wall mount unit into any...

Page 7: ...e tool is powered If the light flashes red the battery requires charging If the light is solid green and the fan is running the tool is ready to take the next shot If the light is solid red and the fa...

Page 8: ...set Fuel Cell contains liquid hydrocarbon fuel This provides enough fuel to drive approximately 1 000 fasteners The Fuel Cell is designed for proper operation at temperatures between 15 F 5 C and 120...

Page 9: ...picture on the right 1 Locate the port on the left rear of the tool and slide the fuel cell into position 2 Firmly push the fuel cell completely into the pocket until the adaptor on top of the fuel c...

Page 10: ...4 Note that the LED light on the side of the handle is a flashing green indicating the the tool is now ready to make a fastening 5 Place the tool in the spot where you want to make your fastening 6 W...

Page 11: ...y push the Work Contact Element up into the nose piece 3 Slightly twist the Work Contact Element to be sure it is fully engaged in the nose NOTE There should be no open gap between the shear block pla...

Page 12: ...Place the tool in the spot where you want to make the fastening 7 With the tool in position and perpen dicular to the work surface press down on the tool 8 Note that the fan motor is running and the L...

Page 13: ...run Battery in off position Fully insert Battery tool LED is off Battery Cell is Charge Battery Cell according to not charged Operating Manual Battery terminals or Clean Battery Cell terminals battery...

Page 14: ...ol Sleeve or Clean tool per Cleaning Procedure O Rings are dirty Returning Purging Stage of Operation Tool operated and Built up dirt and Clean Piston and Nose bore with drove fastener but debris on P...

Page 15: ...eplaces This warranty does not apply to part replacement required due to normal wear This warranty is void as to any tool which has been subjected to misuse abuse accidental or intentional damage use...

Page 16: ...CENTER VISIT OUR WEB SITE AT WWW RAMSET COM OR CALL 800 241 5640 Concrete Fastening Systems Glendale Heights IL 60139 800 RAMSET6 1 800 726 7386 www ramset com Buy with Confidence Buy From Your Autho...

Reviews: