manualshive.com logo in svg
background image

IRGP-2.00GB1211

Roloid Gear Pump

Installation & Maintenance

Содержание Benzlers Roloid Gear Pump

Страница 1: ...IRGP 2 00GB1211 Roloid Gear Pump Installation Maintenance...

Страница 2: ...Shaft mounted helical speed reducers Series C Right angle drive helical worm geared motors reducers Series BD Screwjack worm gear unit Series G Helical parallel shaft bevel helical right angle drive g...

Страница 3: ...electrical equipment and isolate power before working on the unit or associated equipment in order to prevent the machinery being started 7 Installation Maintenance and Storage a In the event that eq...

Страница 4: ...rication 7 7 Motor Connections 8 8 Starting Up 8 9 Operation 9 1 Noise 8 9 2 General Safety 8 9 3 Gear units for use in a potentially explosive atmosphere 8 10 Maintenance 10 1 Prior to any Maintenanc...

Страница 5: ...nt We will upon a reasoned request from national authorities provide any relevant information on its products Warranty Conditions We arrant our products to be free of defects for a period of 12 months...

Страница 6: ...of Manufacture 3 2 Pump Unit Rating The flow capacity rating litres min pump speed rpm and operating pressure are marked on the nameplate Check that these details match the requirements of the machine...

Страница 7: ...requirements of the machine the pump unit is to be installed on 5 2 3 Thoroughly clean the shaft and mounting surfaces that are to be used of anti corrosion agents using a commercially available solv...

Страница 8: ...should be 75 of the values listed below Fit shaft coupling guards where appropriate Bolt Size Torque 10 Nm M16 M6 M8 M10 M12 25 Nm 50 Nm 85 Nm 200 Nm M20 M24 M30 M36 1220 Nm 2150 Nm 350 Nm 610 Nm Tabl...

Страница 9: ...hose marked on the nameplate 5 8 7 Pumped media must contain a lubricant and not contain any solid matter Petrol and Solvents are not permitted 5 8 8 For units operated with inverter drives check moto...

Страница 10: ...s locks fitted to prevent personal injury during assembly 8 1 4 Starting up should only be performed or supervised by suitably qualified personnel Caution Any deviation from normal operating condition...

Страница 11: ...rn seals clean away any sealant and degrease the housing facings 5 Warning rubber gloves should be worn when handling worn oil seals 10 2 4 Fit new seals Apply grease to the seal 2 lip and outer ring...

Страница 12: ...ckages Check that valves and other safety devices are working correctly Check that the size and design of the delivery line meets the specification of the pump Speed Too High Check drive speed is appr...

Страница 13: ...oupling diameter can be calculated in both the vertical and horizontal planes The maximum error of angularity should be checked and adjusted to be within the coupling manufacturer s recommendations If...

Страница 14: ...riving 13 Bearings set of 4 22 Foot Fastenings 5 Foot 14 Ring Dowels x2 23 Cover Fastenings 6 Rotors set of 4 15 Jointing x2 24 Nameplate 7 Adaptors set of 4 16 Body Fastenings 25 Nameplate Fastenings...

Страница 15: ...36 34 03 00 Fax 45 36 77 02 42 FINLAND Oy Benzler AB Vanha Talvitie 3C FI 00580 Helsingfors Finland Tel 358 9 340 1716 Fax 358 10 296 2072 SWEDEN NORWAY AB Benzlers Porfyrgatan 254 68 Helsingborg Swe...

Страница 16: ...0 Finland 358 9 3401716 Germany 49 800 3504000 Italy 39 02 824 3511 Sweden 46 42 186800 The Netherlands 31 77 3245900 www benzlers com Radicon Thailand 66 38459044 United Kingdom 44 1484 465800 USA 1...

Отзывы: