background image

Rev.

 

January

 

2019

 

 
 

 
 

Bubble

Up®

 

Jr

 

Interactive™

  

 

Installation and Operating Instructions 

U.S. Patent # 6,372,024 and 8,393,875 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 

The

 

Bubble

Up®

 

Interactive

 

unit

 

from

 

R.E.

 

Prescott

 

Co.,

 

Inc.

 

is

 

designed

 

to

 

remove

 

radon

 

gas

 

from

 

water.

  

Radon

 

is

 

a

 

radioactive

 

gas

 

which

 

can

 

cause

 

serious

 

health

 

problems.

  

Inside

 

the

 

unit,

 

air

 

is

 

blown

 

into

 

the

 

incoming

 

water

 

and

 

allowed

 

to

 

bubble

 

upward.

 

This

 

bubbling

 

action

 

releases

 

the

 

radon

 

from

 

the

 

water.

 

Air

 

containing

 

the

 

radon

 

is

 

then

 

collected

 

and

 

vented

 

out.

 

 

Installation

 

and

 

Service

 

By:

Содержание Bubble-Up Jr Interactive

Страница 1: ...R E Prescott Co Inc is designed to remove radon gas from water Radon is a radioactive gas which can cause serious health problems Inside the unit air is blown into the incoming water and allowed to bu...

Страница 2: ...8 Start Up Procedure 12 Operating Instructions 12 Maintenance 13 Trouble Shooting 14 Replacement Parts Listing 20 Start Up Data 23 Start Up Notes 24 Appendix A 7 gpm Mechanical Head Manual 25 B Meter...

Страница 3: ...epth of 26 507 lb filled to overflow water depth of 41 Influent Water Requirements Hardness 68 mg l 4 GPG Iron 0 03 mg l Manganese 0 05 mg l Plumbing Connections 1 male npt water inlet and outlet bypa...

Страница 4: ...tects the pump from running dry integral check valve and operates the pump from a 2 1 gallon tank 115V AC Radon Removal Efficiency Inlet Flow and Pressure Specifications Figure 1 Bubble Up Jr Interact...

Страница 5: ...ubble Up Jr Interactive Outlet Flow vs Pressure 14 GPM 0 10 20 30 40 50 60 70 80 0 5 10 15 Pressure PSI Flow GPM 7 GPM Mechanical Pump Control Pressure vs Flow House Pressure Control Pressure 0 10 20...

Страница 6: ...Bubble Up Jr Interactive Radon Removal System 6 Figure 4 Radon Removal vs Flow 99 Removal at 7 GPM 90 92 94 96 98 100 0 5 10 15 20 25 Radon Removal Flow GPM Tested Results Radon Removal vs Flow...

Страница 7: ...t is designed to monitor radon vent obstruction high water and fitting leaks It does this by incorporating a water alarm valve float switch water alarm floor sensor and water alarm tank top terminal b...

Страница 8: ...account when positioning the unit It is best if the unit can be positioned near a drain or sump pit with a sump pump 5 Depress the high water alarm float so it is flush with the rubber cord seal Figur...

Страница 9: ...lower motor If an outdoor source is desired a dryer vent kit can be modified by removing the flap check and replacing it with a screen Be sure to install the kit as directed and run the hose down to t...

Страница 10: ...ol and plug pump cord into low water piggy back float cord Plug the low water piggy back float cord into the female cord of pump control See Figure 7 18 Check all plumbing fittings to be sure all fitt...

Страница 11: ...ypass Valve Mechanical Pump Control Standard 54 65 Pressure Switch Yellow Float Switch Cord Black Pump Control Cord Typical Quadplex Outlet outlet not provided Use 2 20 amp Duplex Receptacles Water Se...

Страница 12: ...mportant to install a new sample valve or boiler drain in new piping so that the radon testing is not influenced by old piping 11 Perform the six month maintenance procedure and fill out the Start Up...

Страница 13: ...the high water float or wetting the floor sensor This should activate the motorized ball valve and shut off all incoming water Hold the RESET button on the front of the water alarm valve control for...

Страница 14: ...echanical pump control 3 Unplug and remove the pump control 4 Unplug the piggy back float switch cord from the duplex outlet box on the Bubble Up Jr Interactive 5 Loosen the 4 nuts on the pump access...

Страница 15: ...ugh the breather vent causing the sensors on the terminal block to detect an overflow of water Vent piping back pressure can be caused by an obstruction ice build up water trapped in a reverse pitch e...

Страница 16: ...Bubble Up Jr Interactive Radon Removal System 16 Figure 9 Bubble Up Blower BUB008 Blower Attachment Nipple BUB022 Bubble Up Mechanical Pump Control BUB075A...

Страница 17: ...1 Accessories Bubble Up Mechanical Pump Control BUB075A Fill Float Switch Assembly BUB007 Pump Assembly Including Motor Impellor and Check Valve BUB051B PVC Union BUB024 Well Seal BUB012 Pre filter Pa...

Страница 18: ...to a Bubble Up Interactive This kit includes all of the parts necessary for the conversion Seen below are the parts included in the retrofit kit Figure 13 Interactive Components Water Alarm Valve Con...

Страница 19: ...oval System 19 Figure 14 Overflow and High Water Alarm Water Alarm Float Wires Connect to terminal Block High Water Alarm Float Assembly Low water float switch grommet Bubble Up Jr Interactive Overflo...

Страница 20: ...5 X 1 Bottom 3629 1 each BUB035A 3 8 X 2 5 S S HEX BOLT 4 each BUB035B 3 8 S S WASHER 4 each BUB035C 3 8 ZINC PLATED NUT 4 each BUB300 1 2 Solenoid and Water Alarm Valve Assembly 1 each BUB310 3 4 Sol...

Страница 21: ...Pump Control Assembly 1 each BUB080 Meter Control Assembly W Transformer 1 each CD1402 01 Manifold w o Ports w Meter 1 each CV3630 Meter Control Mounting Plate 1 each CV3006 Bypass 1 each CV3007 04 1...

Страница 22: ...Bracket Nut 2 each PA 260 300 Leak Sensor Terminal Block 1 each BUB055G Leak Sensor Terminal Block Standoff 1 4 nylon 2 each BUB055H Leak Sensor Terminal Block Screw 2 each BUB009B 1 2 XP Adapter 1 e...

Страница 23: ...________________________________ Installer ______________________________________________ Address _____________________________________________________________________________ ________________________...

Страница 24: ...ractive Radon Removal System 24 Start Up Notes Fill Rate ______________________________________________ Radon In ______________________________________________ Radon Out ______________________________...

Страница 25: ...switch cover and making adjustments See pressure adjustment instructions under the cover 2 Adjust the large spring only until the pressure switch turns on at 45 PSI 3 Do not adjust the small spring T...

Страница 26: ...mp s male power plug into the Bubble Up mechanical pump control female cord 5 To start the pump refer to OPERATION below 6 The pressure switch factory set at to turn the pump on at 45 PSI To set press...

Страница 27: ...Bushing NP 10 Nozzle and Throat part of repair kit 3 1 1 4 Bubble Up Mechanical Pump Control Body 11 Stainless steel screws qty 3 4 Back Mount Pressure Gauge 12 1 4 PVC plug 5 45 65 Standard Pressure...

Страница 28: ...ing from left to right across the display Flow Displays CURRENT flow rate gal min Total Flow Displays TOTAL gallons treated since last meter reset gal Peak Flow Displays PEAK flow rate since last mete...

Страница 29: ...0 amps max Should be factory set at 80 which translates to 80 000 gallons 80 000 gallons is an estimated yearly service reminder for 4 people using 50 gallons per day each This threshold can be set fo...

Страница 30: ...nty A serial number is required for any warranty service R E Prescott Co Inc asks you to record the serial number on the outside of the packaging when shipping the product Proof of purchase may be req...

Отзывы: