Installation Details For Quest Enterprise Activity Unit (QU10) 

 

1

 

Construct base as per drawing P/QU10/01 ensuring the correct levels for safety surfacing. 

2

 

Excavate 400mm x 400mm holes for Posts as in drawing P/QU10/02 to a depth of 500mm 

(800mm 

loose fill)

 from finished safety surfacing height. (All Posts have finished ground level marks) 

3

 

Position the Posts as per drawing P/QU10/02, all posts are numbered. 

(Tap holes with a 10mm tap and make sure bolts are only hand tight at this stage) 

4

 

Fit the Posts in to the excavated holes and connect together using the various components as in 

drawing P/QU10/04 and the attached visual. 

5

 

Excavate 400mm x 400mm holes for events as in drawing P/QU10/03 to a depth of 500mm  

(800mm for loose fill) 

from finished safety surfacing height.  

6

 

Connect the events as per drawing P/QU10/04 using M10 x 30 resistorx & nylon washers. 

7

 

When installing the climb wall panel to the top and bottom rail use the M10 x 50 resistorx bolts & 

plastic caps 

8

 

When installing the Hang tough use drawing no. I/QUHT/01 

9

 

When installing the rotating platform assemble the top wishbone, remove the cap from the rotator 

top and insert in to the wishbone making sure it is inserted all the way in. Before concreting in place 

make sure the rotator is spinning freely. 

10

 

Assemble all other items of equipment as drawing P/QU10/04 using M10 x 30 resistorx & nylon 

washers. 

11

 

Connect all ropes using the 8mm quick links & vandal pins. 

12

 

Connect all chains using 6.5mm quick links & vandals pins. 

13

 

Once all equipment is fitted check levels again, tighten all bolts and concrete in to the ground. 

 

 

Содержание Quest Enterprise Activity Unit QU10

Страница 1: ... P QU10 04 and the attached visual 5 Excavate 400mm x 400mm holes for events as in drawing P QU10 03 to a depth of 500mm 800mm for loose fill from finished safety surfacing height 6 Connect the events as per drawing P QU10 04 using M10 x 30 resistorx nylon washers 7 When installing the climb wall panel to the top and bottom rail use the M10 x 50 resistorx bolts plastic caps 8 When installing the H...

Страница 2: ... MULTI UNIT DRG No DATE SCALE Play Leisure The Power of Play 88m 914 2387 1067 1662 1384 1238 1178 1575 1164 1164 377 5429 1384 1178 1327 1984 3029 4836 2756 1513 2067 764 1972 1392 978 1068 764 10065 13022 1500 1500 1500 1500 1500 1500 1800 2030 2160 1800 1700 ...

Страница 3: ...02 13 10 2014 N A POST HOLE LAYOUT DRAWING FOR ENTERPRISE MULTI UNIT DRG No DATE SCALE Play Leisure The Power of Play 88m 1114 1114 557 557 2046 1899 965 2114 965 1053 1 2 3 4 5 6 7 8 9 10 11 12 1830 1830 3660 ...

Страница 4: ...Play Leisure The Power of Play P QU10 03 13 10 2014 N A ACCESS HOLE LAYOUT DRAWING FOR ENTERPRISE MULTI UNIT DRG No DATE SCALE 88m 734 604 1601 1955 3319 3630 221 576 792 1163 1459 2531 2696 744 1026 ...

Страница 5: ...I UNIT DRG No DATE SCALE Curved Ladder Hammock Net Climb Bars Wave Link Handlebars Glider Bars Firepole Walkerboard x 2 Pull Up Bar Climb Wall Overhead Bars Parallel Bars Rope Platform Hang Tough Rotating Platform Walkerboard Semi Walkerboard Semi Walkerboard Semi Walkerboard Pull Up Bars Side Ladder ...

Страница 6: ...E I QUHT 01 SCALE 15 05 09 N A INSTALLATION OF HANG TOUGH Play Leisure The Power of Play Hole Plan Side View Short Long Length of ropes from eye bolt to platform M8 Quick Links Short Long 423 423 423 423 423 300 ...

Отзывы: