background image

Industrial Box Thin Client

BTC01

PROCESS AUTOMATION

MANUAL

Summary of Contents for BTC01

Page 1: ...Industrial Box Thin Client BTC01 PROCESS AUTOMATION MANUAL ...

Page 2: ...f Delivery for Products and Services of the Electrical Indus try published by the Central Association of the Electrical Industry Zentralverband Elektrotechnik und Elektroindustrie ZVEI e V in its most recent version as well as the supplementary clause Expanded reservation of proprietorship Industrial Box Thin Client ...

Page 3: ...tions 5 2 Product Description 6 2 1 Application 6 2 2 RM Shell 6 2 3 ACP ThinManager Ready 7 2 4 Technical Data 7 2 5 Accessories 9 3 Installation 11 3 1 Mounting 11 3 2 Electrical Connection 13 3 3 I O Connection 15 3 3 1 Use of PS 2 Ports in Hazardous Locations 21 4 Commissioning 22 4 1 Video Card Option 22 4 2 Power Mode Options 22 4 3 Multiple Display Setup 22 ...

Page 4: ...ype examination certificate EU declaration of conformity Attestation of conformity Certificates Control drawings Additional documents 1 1 2 Target Group Personnel Responsibility for planning assembly commissioning operation maintenance and dismounting lies with the plant operator Only appropriately trained and qualified personnel may carry out mounting installation commissioning operation maintena...

Page 5: ...rdous location installation guidelines Special Conditions of Use for Hazardous Locations Mount device in a suitable enclosure providing a minimum degree of protection of NEMA 4x or IP54 which only allows access by using a tool Supply the device with a power supply that meets the requirements for safety extra low protective voltage SELV or protective extra low voltage PELV Do not connect or disconn...

Page 6: ...l 5 is based on Windows 10 IoT Enterprise LTSB an embedded version of Windows with long term support that is compatible with the latest versions of common remote protocols such as RDP 10 Citrix Receiver and VNC With these protocols the BTC01 and other VisuNet Remote Monitors can be easily integrated into all major process control systems whether they are virtualized or conventional workstation bas...

Page 7: ...ThinManager shows the following information thin clients are operating terminal servers the clients are assigned to thin clients log in information applications run by the thin clients ThinManager partners with certain thin client manufacturers like Pepperl Fuchs to flash the BIOS of their hardware to ensure it automatically boots into the ThinManager environment These are referred to as ThinManag...

Page 8: ...WUXGA 1920 x 1200 1 x VGA up to WUXGA 1920 x 1200 Video option 1 x HDMI up to 3840 x 2160 30Hz 1 x DVI D up to WQXGA 2560 x 1600 Audio 1 x mic in 1 x line out Directive conformity Electromagnetic compatibility Directive 2014 30 EU EN 61326 1 Low voltage Directive 2014 35 EU EN 60950 1 Software Operating system Windows 10 IoT Enterprise x64 VisuNet RM Shell 5 x Windows Embedded Standard VisuNet RM ...

Page 9: ...M DVIF Video Adaptor DVI D male to HDMI female ADP V DVIM HDMIF Accessories Designation AC power cord IEC320 C13 to US Japan S BN 12 1500 US JP2 AC power cord IEC320 C13 to European S BN 12 1500 EU2 AC power cord IEC320 C13 to United Kingdom S BN 12 1500 UK2 AC power cord IEC320 C13 to Australian S BN 12 1500 AU2 Note All units ship with US Japan AC power cord For other regions power cords must be...

Page 10: ...2018 10 10 Industrial Box Thin Client Product Description Efficiency 88 Operating Temperature 30 60 C Storage Temperature 40 85 C Humidity 20 95 RH Non condensing Dimensions 125 x 50 x 31 5 mm PG12 BTC1 ...

Page 11: ...t the unit on the wall The unit must be mounted so that the heat fins are vertical to allow for proper convection cooling Attaching Brackets 1 Remove the feet from the steel base Figure 3 1 Warning Install the device in accordance with the instructions by competent personnel Observe national laws and regulations Warning Hot surface The surface of the unit can be hot when system is in use 1 1 ...

Page 12: ...lation Figure 3 2 2 Use the screws from the feet to attach the brackets to the steel base as shown below 3 Use appropriate mounting screws with a diameter of 5 mm not included and the following mounting diagram to mount the unit to a wall 1 2 1 2 ...

Page 13: ...ons depending on the ordered device type Figure 3 4 Electrical connection depending on device type AC For AC power you insert a plug into the back of the unit AC power utilizes connector type C14 See Figure below 265 170 1 1 1 Warning Do not connect or disconnect the electrical connection of the device in the presence of a potentially explosive atmosphere ...

Page 14: ... VDC power you insert a power jack into the back of the unit The connector on the back of the unit is a 5 5 mm barrel jack The polarity of the plug is center positive For this option an AC power adapter with 5 5 mm barrel jack is supplied Figure 3 6 12 VDC barrel jack Warning The connector on the back of the unit is an IEC320 C14 receptacle and requires a mating of an IEC320 C13 The intended insta...

Page 15: ...re size for this setup is 14 AWG 18 AWG The recommended tightening torque is 0 24 Nm 2 in lbs The pinout for the power connection is as follows Position 1 VDC Position 2 VDC Position 3 Ground Figure 3 7 18 VDC 30 VDC terminal I O plate 3 3 I O Connection Figure 3 8 BTC01 Industrial Box Thin Client I O Connection Ports Front Warning The 18 VDC 30 VDC power has to provide a SELV output according to ...

Page 16: ...Back 1 PS 2 Mouse Port 2 COM Port 1 COM1 3 COM Port 3 COM3 4 LAN RJ 45 Port 5 HDMI Port HDMI2 6 LAN RJ 45 Port 7 DVI D Port 8 Line out green 9 Microphone pink 10 USB 3 0 Ports USB3_0_1 11 USB 2 0 Ports USB_0_1 12 VGA Port VGA1 13 COM Port 2 COM2 14 PS 2 Keyboard Port 15 HDMI Port HDMI1 1 4 2 3 5 6 7 15 14 13 12 11 10 9 8 ...

Page 17: ... 11 Pin PS 2 1 Keyboard data 2 Not used 3 Ground 4 5 Volt 5 Clock 6 Not used Pin RS 232 1 DCD 2 RXD 3 TXD 4 DTR 5 GND 6 DSR 7 RTS 8 CTS 9 COM1 5V 12V 5VSB COM2 3 5V 12V 1 2 3 4 5 6 1 9 5 6 Note Use the cable retention bracket 3 to mount the connectors to the COM ports securely See chapter 3 3 1 ...

Page 18: ...HDMI Port Figure 3 13 Pin RJ45 1 Tranceive data 2 Tranceive data 3 Receive data 4 Bidirectional data 5 Bidirectional data 6 Receive data 7 Bidirectional data 8 Bidirectional data Status LED green LED Yellow Off No Link 10 Mb s connection Blinking Data Activity 100 Mb s connection On Link 1 Gb s connection Pin RJ45 1 TMDS data 2 2 TMDS data 2 shield 3 TMDS data 2 4 TMDS data 1 5 TMDS data 1 shield ...

Page 19: ...lug detect Pin DVI D 1 TMDS data 2 2 TMDS data 2 3 TMDS data 2 4 shield 4 TMDS data 4 5 TMDS data 4 6 DDC clock SCL 7 DDC data SDA 8 Not used 9 TMDS data 1 10 TMDS data 1 11 TMDS data 1 3 shield 12 TMDS data 3 13 TMDS data 3 14 5 VDC 15 Ground 16 Hot plug detect 17 TMDS data 0 18 TMDS data 0 19 TMDS data 0 5 shield 20 TMDS data 5 21 TMDS data 5 22 TMDS clock shield 23 TMDS clock 24 TMDS clock Pin ...

Page 20: ...on Bracket Pin USB 1 5 Volt 2 Data 3 Data 4 Ground Pin VGA 1 Red video 2 Green video 3 Blue video 4 Reserved 5 Ground 6 Red ground 7 Green ground 8 Blue ground 9 Not connected 10 Ground 11 ID0 ground 12 ID1 no connect 13 Horizontal sync 14 Vertical sync 15 Not connected 1 2 3 4 1 5 15 6 10 11 Warning All connectors with screw terminals must be appropriately fastened ...

Page 21: ...o hold the connectors securely in place 1 Remove the mounting screws 2 of the COM ports 1 2 Place the cable retention bracket 3 between the COM ports 1 by aligning the four threaded holes 3 Put the mounting screws 2 back into place and torque them to 4 inch lbs 0 45 Nm in a crisscross pattern Figure 3 17 1 COM ports 2 Mounting screws 3 Cable retention bracket 1 2 3 ...

Page 22: ...solution 2560 x 1600 pixel 120 Hz HDMI maximum resolution 3840 x 2160 pixel 30 Hz 4 2 Power Mode Options The Industrial Box Thin Client BTC01 is available with two different power mode options AT and ATX With the AT power mode the industrial box thin client automatically starts up when connection is made to the power main With ATX power mode you must press the power button to start the computer af...

Page 23: ...he secondary display input port VGA 3 Plug in the optional third display into the third display input port HDMI2 4 Plug in the optional fourth display into the fourth display input port DVI D Configuring Multiple Displays 1 In the RM Shell log in as the Administrator user using the Switch User dialog Figure 4 2 Note If you don t have an HDMI enabled display connect your display to the secondary di...

Page 24: ...2018 10 24 Industrial Box Thin Client Commissioning 2 Select the System Settings application Figure 4 3 3 Open the Display tab Figure 4 4 ...

Page 25: ...solution dialog Figure 4 5 5 Use the Screen Resolution dialog to reposition the displays to match your current setup This screen allows you to see your monitor layout and rearrange it by dragging and dropping the blue boxes This dialog can also be used to set the resolution and orientation of each display Figure 4 6 ...

Page 26: ... Industrial Box Thin Client Commissioning 6 Set the main display by selecting it and then checking the setting Make this my main display Figure 4 7 7 Click OK to save any changes and follow any resulting prompts ...

Page 27: ...Industrial Box Thin Client Commissioning 2018 10 27 ...

Page 28: ...erl fuchs com Worldwide Headquarters Pepperl Fuchs GmbH 68307 Mannheim Germany Tel 49 621 776 0 E mail info de pepperl fuchs com For the Pepperl Fuchs representative closest to you check www pepperl fuchs com contact PROCESS AUTOMATION PROTECTING YOUR PROCESS DOCT 4946D 10 2018 ...

Reviews: