background image

22-100

MULTIBLOCK

22-100

MULTIBLOCK

24-225-6

FHCS

24-225-6

FHCS

PANEL SHOULD BE INSTALLED

IN "FLUSH MOUNT" ORIENTATION

MULTIBLOCK

ORIENTATION

Assembly Instructions

71-113-xx & 71-123-xx 
Floor Mount Day by the Hour Display Kits

Contact Information:

Parker Hannifin Corporation

Electromechanical Automation Division

email  [email protected]
www.parker.com/ips

Two Locations to Serve You: 

135 Quadral Drive
Wadsworth, OH 44281
Phone  800.333.4932
Fax  330.334.2350

5500 Business Park Drive
Rohnert Park, CA 94928
Phone  800.358.9070 
Fax  707.584.8029   

Recommendations:

Time to assemble: 

1-2 hours 

Assembly area: 

10’ x 10’ or larger open floor space. 

To prevent scratching, use cardboard or other protective 
underlayment.

Required Tools:

•  4 mm hex wrench
•  5 mm hex wrench
•  6 mm hex wrench (ball end)
•  Phillips screwdriver
•  Flat head screwdriver
•  Rubber mallet

Part Number: 70-104

Display Board 

Size (ft) 

H x W

Display Board Material

Kit 

Part Number

3 x 3

Clear Poly Board

71-113-PK 

Black Trespa Board

71-113-BK 

No Board

71-113-NK 

3 x 3

Clear Poly Board

71-123-PK 

Black Trespa Board

71-123-BK 

No Board

71-123-NK 

71-113-xx with  
Andon Post Option

71-123-xx

Reviews: