background image

Inspection Certificate 

Controlecertificaat 

 Kontrollschein 

 Bulletin de contrôle 

  Certificato 

di controllo  

 Certificado de control 

 Kontrollskjema 

 Kontrol 

Certifikat 

 
 

Please keep safely! 

Zorgvuldig te bewaren! 

 Bitte gut aufbewahren! 

 A bien conserver, 

s.v.p.! 

 Da conservare! 

 ¡A conservar! 

 Ta vare på denne! 

 

Opbevares sikkert! 

 

                     Art. Nr. FRF34-3232 

 

 

 
English:

  The  house  you  have  purchased  was  manufactured  in  accordance  with  the  high  quality  norms.  The  building  unit  has  been  carefully 

inspected and packed. In order to avoid possible problems during the assembly carried out by yourself or the building company of your choice, we 

recommend that you inspect the delivery for its completeness in accordance with the list of pieces before assembly. This inspection must be carried 

out within 14 days after delivery to your place. Warranty claims are limited to the exchange of defective materials. Defective building parts, which 

have already been used or painted, are excluded from being replaced. All further claims are excluded! In cases of complaints, please pay attention 

to the following procedures: Please present this inspection certificate along with the sales receipt to your place of purchase. Only in cases where 

these documents are presented will the complaint be dealt with quickly and without complications. 

 
Dutch

: Het door U gekochte tuinhuis werd vervaardigd volgens de hoge kwaliteitsnormen. Het tuinhuis werd zorgvuldig gecontroleerd en verpakt. 

Om tijdens de montage, uitgevoerd door Uzelf of een door U gekozen aannemer, problemen te vermijden, raden we U aan, vÓÓr de montage, de 

levering te controleren op volledigheid in overeenstemming met de onderdelenlijst. Deze controle dient te gebeuren binnen 14 dagen na levering bij 

U  thuis. Waarborgvorderingen  zijn  beperkt  tot  het  vervangen  van  gebrekkig  materiaal.  Gebrekkige  onderdelen  die  reeds  gebruikt  of  geschilderd 

zijn, zijn uitgesloten van vervanging. Alle latere vorderingen zijn uitgesloten! In geval van klachten, gelieve dan te letten op de volgende procedure: 

Leg dit controlecertificaat, samen met Uw aankoopbewijs voor aan Uw verkoper. Enkel in gevallen waarbij deze documenten voorgelegd worden, 

zal de klacht snel en zonder complicaties behandeld worden.

 

 
Deutsch:

  Das  von  Ihnen  gekaufte  Haus  wurde  nach  der  hohen  Qualitätsnorm  gefertigt.  Der Bausatz  wurde  sorgfältig  geprüft  und  verpackt.  Um 

etwaige  auftretende  Probleme  während  des  Aufbaus  durch  Sie  oder  Ihre  Aufbaufirma  zu  vermeiden,  kontrollieren  Sie  bitte  die  Lieferung  auf 

Vollständigkeit  laut  Stückliste  vor  dem  Aufbau.  Diese  Kontrolle  muss  innerhalb  14  Tagen  nach  Anlieferung  bei  Ihnen  erfolgen.  Ansprüche  auf 

Gewährleistung beschränken sich auf den Austausch von fehlerhaftem Material. Fehlerhafte Bauteile, die bereits verbaut oder gestrichen wurden, 

sind  vom  Umtausch  ausgeschlossen.  Alle  weiteren  Ansprüche  sind  ausgeschlossen!  Sollte  es  zu  einer  Beanstandung  kommen,  beachten  Sie 

folgende  Vorgehensweise:  Legen  Sie  Ihrem  Fachhändler  diesen  Kontrollschein  zusammen  mit  dem  Einkaufsbeleg  vor.  Nur  bei  Vorlage  dieser 

Unterlagen ist eine schnelle und problemlose Bearbeitung Ihrer Beanstandung möglich. 

 
Français:

 La cabane que vous venez d’acheter a été fabriqué en respectant de hautes normes de qualité. L’ensemble de construction a été testé 

et emballé avec soin. Afin d’éviter des problèmes éventuels pendant la construction par vous-même ou la société de construction mandatée, nous 

vous prions de bien vouloir vérifier que toutes les pièces ont été fournies selon la liste des pièces avant que vous ne commenciez la construction. Il 

vous incombe de faire ce contrôle dans les 14 jours après la fourniture. Les revendications en dédommagement se limitent à l’échange de matériel 

défectueux.  Des  pièces  de  construction  défectueuses,  déjà  construites  ou  peintes,  sont  exclues  de    tout  échange.  Toutes  les  revendications 

ultérieures sont exclues ! Si une réclamation avait lieu, veuillez respecter le déroulement suivant : Il vous faudra présenter, à votre commerçant 

spécialisé, ce bulletin de contrôle avec le récépissé de l’achat. Ce ne sera que moyennant présentation de ces documents qu’un traitement rapide 

et sans problème de votre réclamation sera possible! 

 
Italiano:

  La  casetta  che  avete  acquistato  è  stata  prodotta  secondo  la  norma  di  alta  qualità.  Il  kit  è  stato  controllato  ed  imballato  con  cura.  Per 

evitare eventuali inconvenienti durante il montaggio, si prega di verificare, prima del montaggio, la completezza della fornitura in base alla distinta 

dei pezzi. Tale verifica deve essere effettuata entro 14 giorni dalla consegna. Eventuali diritti di garanzia si limitano alla sostituzione di materiale 

difettoso.  Gli  elementi  difettosi  già  montati  o  verniciati  sono  esclusi  dal  diritto  alla  sostituzione.  Ogni  altro  diritto  resta  escluso!  In  caso  di 

reclamazione,  procedere  nel  modo  seguente:  presentare  questo  certificato  di  controllo  unitamente  alla  prova  d’acquisto  al  rivenditore.  Solo  in 

questo modo la Sua reclamazione potrà essere evasa rapidamente e senza problemi. 

 
Español: 

La casa que ha adquirido ha sido fabricada de acuerdo con normas de alta calidad. Las piezas de la casa han sido cuidadosamente 

inspeccionadas y embaladas. Con el fin de evitar posibles problemas durante el montaje, hecho por usted o por la empresa de construcción de su 

elección, le recomendamos revisar el paquete entregado, con la lista de piezas, antes de armar la casa. Haga la revisión dentro de 14 días 

después de recibir el paquete. La garantía se limita a reemplazar las piezas defectuosas. No se reemplazarán las partes defectuosas que ya hayan 

sido utilizadas o pintadas. ¡No se aceptan otras reclamaciones! En casos de queja, por favor, presente este certificado junto con la factura en el 

lugar donde hizo la compra. Sólo presentando estos documentos podremos resolver su problema rápidamente y sin complicaciones. 

 
Norsk:

 Produktet du har kjøpt, ble produsert i henhold til høye kvalitetskrav. Produktet har blitt kontrollert nøye og deretter omhyggelig pakket. For 

å unngå mulige problemer under monteringen, uansett om du gjør det selv eller får en godkjent håndverker til å gjøre det, anbefaler vi at du 

kontrollerer leveransen mot delelisten for å se om alle delene er inkludert. Denne kontrollen må gjøres innen 14 dager etter at delene ble levert til 

din adresse. Garantikrav begrenser seg til bytte av defekte deler. Defekte elementer som allerede har blitt brukt eller malt/beiset/limt, vil ikke bli 

erstattet. Alle andre krav er utelukket! Dersom du har en reklamasjon, vennligst gjør som følger: Lever dette kontrollskjema med kvitteringen til 

salgsstedet. Bare når du har med disse dokumentene kan klagen behandles raskt og uten komplikasjoner.

 

 
Dansk: 

Det købte hus er fremstillet i overensstemmelse med de høje kvalitets krav. Produktet er blevet omhyggeligt inspiceret og pakket. For at 

undgå eventuelle problemer i løbet af monteringen udført af dig selv eller håndværker af dit eget valg, anbefaler vi, at du undersøger leverancen for 

fuldstændighed i overensstemmelse med listen over dele før samling. Denne inspektion skal foretages inden 14 dage efter levering til din plads. 

Garantikrav er begrænset til udveksling af defekte materialer. Defekte bygningsdele, som allerede er brugt eller malet, er udelukket fra at blive 

erstattet. Alle yderligere krav er udelukket! I tilfælde af klager, skal du være opmærksom på følgende procedurer: Venligst præsentere denne 

kontrol certifikat sammen med kvitteringen til det sted hvor produktet er købt. Kun i de tilfælde, hvor disse dokumenter er forelagt kan klagen 

behandles hurtigt og uden komplikationer. 

 
Factory inspection by

 

 Fabriekscontrole door 

 Werkskontrolle 

durch 

 Contrôle à partir de l’usine par 

 Collaudato da 

 Inspector 

de fábrica 

 Fabrikkkontroll utført av 

 Fabriks Kontrol udført af :  

 

…………………………………………………………………………….. 

 
Pack number

 

 Pack Nr. 

 Pack Nr.

 Packet n° 

 Pacco N. 

 

Paquete N

o

 

 Serienr: 

……………………………………………………………………………. 

 
Date 

 Datum 

 Date 

 Data 

 Fecha 

 

Dato:…..............………… 

 

 

Summary of Contents for Sandy 3.0

Page 1: ...cations ultérieures sont exclues Si une réclamation avait lieu veuillez respecter le déroulement suivant Il vous faudra présenter à votre commerçant spécialisé ce bulletin de contrôle avec le récépissé de l achat Ce ne sera que moyennant présentation de ces documents qu un traitement rapide et sans problème de votre réclamation sera possible Italiano La casetta che avete acquistato è stata prodott...

Page 2: ...ankoopbewijs Datum Kaufbeleg Datum Date du récépissé Data prova d acquisto Fecha recibo Kvitteringsdato Kasse bons dato Forwarder Pick up Others Door Verzending Zelf afhalen Spedition Selbstabholer Par Transporteur Propres moyens Tramite Spedizioniere Mezzo proprio Entrega Transporte organizado transporte propio Transportør Sendes Hentes Transportør Sendes Hentes Description of complaint Beschrijv...

Page 3: ...ndre tekniske egenskaper ved produktet Alle rechten en technische wijzigingen voorbehouden Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de montaje Monteringsanvisning Installatiegids Log cabin FRF34 3232 Blockhaus Maisonnette en poutres Casa di travi Casa de jardin Anneks Tuinhuis Width 320 x Depth 320 cm Breite Tiefe Largeur Profondeur Lunghezza Profon...

Page 4: ...of the house We can only review complaints if you submit the control number of the house to the seller The warranty does not cover Peculiarities of wood as a natural material Wooden details already painted processed with a wood preservative Wooden details containing whole branches that do not endanger the stability of the house Colour tone variations caused by wood structure differences that do no...

Page 5: ... windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusive finishing a weather protection paint that will protect wood from moisture and UV radiation When painting use high quality tools and paints follow the paint application manual and manufacturer s sa...

Page 6: ... At the same time make sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete or pavement slabs Cast concrete bed Prepare the foundation so that the foundation joists are propped up on every side with intervals not exceeding 50 60 cm Consult an expert in this field or have th...

Page 7: ...orresponding materials are not included in the supplied kit Installation of foundation joists Walls When installing the walls it is important to remember that The logs are always assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the appended wall plans see Technical specifications Fir...

Page 8: ...leaves on the hinges now To open and close the door fit the separately packaged lock and handle Window installation Continue with the installation of the wall logs until you reach the window height The wall plans see Technical specifications show how many logs go under the window Install the window similarly with the door Just like the door push the window frame with the window into the window ape...

Page 9: ...or plane the apex or sidewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the roof use a stable ladder Do not step on the roof as the structure is suitable to sustain only an even load snow wind etc and not a point load Begin the installation of the roof boards from the front ed...

Page 10: ... with the supplied felt nails at intervals of about 15 cm Make sure that the felt strips overlap by at least 10 cm Having installed the roof cover material attach the wind braces to the roof and the facia boards to the rafters and upper wall logs Installation of wind braces and facia boards Floor Only when the house is built completely you can install the floor boards thus avoiding unnecessary smu...

Page 11: ...ary shorten the upper ends of the slats Do not turn the screws tightly so wood can further swell or diminish With the house having settled you should adjust the attachments so the wall logs can settle Installation of storm braces General advice Problem Gaps appear between the wall logs Cause Additional details are attached to the house that do not allow wood to swell diminish Solutions If the door...

Page 12: ...trollnummer des Hauses Es ist möglich die Reklamation nur dann als Garantiefall zu behandeln wenn Sie die Kontrollnummer Ihrem Fachhändler weitergeben Abweichungen die keinen Reklamationsgrund darstellen Holz ist ein Naturprodukt daher gehören die naturgegebenen Beanstandungen nicht unter Garantie Materialreklamationen werden nicht akzeptiert wenn bereits ein Anstrich erfolgte Äste die mit dem Hol...

Page 13: ...r wichtig sowohl die Innen als auch die Aussenseiten der Türen und Fenster auf einmal zu streichen Andernfalls können sie sich verziehen Nach dem Aufbau empfehlen wir Ihnen die Aussenhaut ohne Dach zu Grundieren sobald diese trocken ist sollten Sie das Haus mit einer Holzlasur streichen die das Holz vor Feuchtigkeit und UV Strahlung schützt Beim Anstrich benutzen Sie hochwertiges Werkzeug und Farb...

Page 14: ... Fundamentvorschläge Streifen oder Punktfundament Beton bzw Gehwegplattenfundament geschüttetes Betonfundament Bereiten Sie das Fundament so vor dass die Lagerhölzer überall im Abstand von max 50 60 cm gestützt sind Lassen Sie sich ggf von einem Fachmann beraten bzw lassen Sie das Fundament von einem Fachmann erstellen III Aufbau WICHTIG Im Paket finden Sie eine Zusatzbohle längste Wandbohle Im Pa...

Page 15: ...Die Wandbohlen werden immer mit der Feder nach oben zeigend zusammengesteckt Beim Bedarf benutzen Sie das Schlagholz und den Hammer Nie mit dem Hammer direkt auf die Feder schlagen Die Wandpläne Siehe Technische Daten zeigen Ihnen den Aufbau der Wände Als erstes verlegen Sie die halben Bohlen der Vorder und Rückwand und befestigen Sie sie mit Schrauben an die Lagerhölzer Danach legen Sie die Seite...

Page 16: ...enmontiert Montage der Türrahmen Nur bei Doppeltür nötig Montage der Tür Der Rahmen wird von oben in die entstandene Öffnung geschoben und fest auf die unterste Bohle gedrückt Bei einem Haus mit Doppeltür hängen Sie nun die Türblätter ein Montieren Sie nun die separat verpackten Türgriffe so dass Sie die Tür öffnen können Montage der Fenster Fahren Sie fort die Wände hochzuziehen bis Sie zur Fenst...

Page 17: ...Oberseiten der Pfetten mit dem Giebel nicht bündig abschliessen sollten Sie entsprechend die Wandbohlen nach unten klopfen oder den Giebel bzw die Seitenwandbohle etwas nachhobeln Dach Vor dem Verlegen der Dachbretter ist darauf zu achten dass das Haus hundertprozentig in Waage steht Überprüfen Sie mittels einer Wasserwaage alle 4 Seitenwände WICHTIG Der Dachbelag darf nur über eine standfeste Lei...

Page 18: ... bei der Anbringung der nächsten Lagen dass diese mindestens 10 cm über die vorherige Lage überlappen Nach dem Einlegen der Dachpappe erfolgt die Montage der Windbretter und die Befestigung der Giebelblenden an die Pfetten und obersten Wandbohlen Montage der Windbretter und Giebelblenden Fussboden Erst wenn das Haus komplett aufgebaut wurde erfolgt das verlegen der Fussbodenbretter dadurch vermeid...

Page 19: ...n Sie die Leisten von der oberen Seite kürzer Die Schlossschrauben dürfen nur Handfest angezogen werden damit das Holz weiterhin arbeiten kann Wenn das Haus sich gesetzt hat müssen die Befestigungen reguliert werden damit die Wandbohlen sich nach unten setzen könnten Montage der Sturmleisten Allgemeine Tipps Problem Es entstehen Spalten zwischen den Bohlen Ursache Es sind zusätzliche Details an de...

Page 20: ...ion ne peut être traitée dans le cadre de la garantie que si vous communiquez le numéro de contrôle à votre revendeur spécialisé Ecarts qui ne constituent pas un motif de réclamation Le bois est un produit naturel ce qui fait que les réclamations reposant sur des phénomènes naturels ne tombent pas sous le coup de la garantie Les réclamations concernant les matériaux ne sont pas acceptées si une pe...

Page 21: ... est très important de peindre en une seule fois aussi bien les faces intérieures que les faces extérieures des portes et des fenêtres Dans le cas contraire elles pourront se déformer Une fois le montage effectué nous vous conseillons de revêtir l extérieur sans le toit d un apprêt Dès que cet apprêt sera sec vous devrez revêtir votre maison d un glacis pour bois qui protégera le bois contre l hum...

Page 22: ...ent ventilée par dessous Nous vous proposons les fondations suivantes Semelle filante ou fondations ponctuelles Fondations en béton ou fondations en dalles de ciment Fondations coulées en béton Préparez les fondations de façon à ce que les longrines prennent partout appui à un écartement de max 50 60 cm Faites vous le cas échéant conseiller par un spécialiste ou faites réaliser les fondations par ...

Page 23: ...pas partie de l étendue de la fourniture Montage des longrines Parois Lors du montage des parois il est important de savoir ceci Les madriers des parois s emboîtent toujours ressort tourné vers le haut En cas de besoin utilisez la planche à frapper et le marteau Ne jamais frapper directement sur le ressort avec le marteau Les plans des parois voir partie Caractéristiques techniques vous montrent l...

Page 24: ...saire seulement dans le cas d une porte double Montage de la porte On introduit le dormant par dessus dans l ouverture créée et on le repousse en butée contre le madrier se trouvant tout en bas Dans le cas d une maison avec double porte accrochez alors les vantaux de la porte Montez ensuite les poignées de la porte emballées séparément de façon à ce que vous puissiez ouvrir la porte Montage des fe...

Page 25: ...i les côtés supérieurs des pannes n affleurent pas sur le pignon vous devez donner de petits coups sur les madriers des parois pour les abaisser ou bien raboter un peu plus le pignon et le madrier de la paroi latérale Toit Avant la pose des planches du toit il convient de veiller à ce que la maison soit à cent pour cent de niveau A l aide d un niveau à bulle d air vérifiez les 4 parois latérales I...

Page 26: ...es pour carton bitumé en respectant un espacement de 15 cm environ Lors de la mise en place des couches suivantes veillez à ce que celles ci recouvrent la couche précédente sur 10 cm au moins Après la pose du carton bitumé viennent le montage des pare vent et la fixation der bandeaux de pignon sur les pannes et les madriers de parois supérieurs Montage des pare vent et des bandeaux de pignon Planc...

Page 27: ... cas de besoin raccourcissez les baguettes du côté supérieur Les vis à tête bombée et collet carré ne doivent être serrées qu à la main afin que le bois puisse continuer à travailler Une fois que la maison s est bien mise en place il faut ajuster les fixations afin que les madriers des parois puissent s abaisser pour se mettre en place Montage des contreventements Conseils Problème Des fentes se f...

Page 28: ......

Page 29: ......

Page 30: ......

Page 31: ......

Page 32: ......

Page 33: ......

Page 34: ......

Page 35: ......

Page 36: ......

Reviews: