background image

UH219

UH219 Series

service 

instructions

UK 60908

IMSIUH219

EN

U H 2 1 9   S e r v i c e   I n s t r u c t i o n s

ENGLISH

Summary of Contents for UH219 Series

Page 1: ...UH219 UH219 Series service instructions UK 60908 IMSIUH219 EN UH219 Service Instructions ENGLISH ...

Page 2: ...required for element removal is as follows 4 2 1 UH219C series cover service 102mm 4in for length 4 203mm 8in for length 8 338mm 13 3in for length 13 and 508mm 20in for length 20 housings 4 2 2 UH219H series head service 100mm 3 9 for all lengths 4 2 3 The UH219 Housing is supplied without a filter element For element installation and servicing procedures refer to Section 7 4 3 Threaded differenti...

Page 3: ...abels 6 Differential pressure devices Reference should be made to product literature for dimensions operating parameters part numbering ordering information and specifications 6 1 Differential pressure devices actuate when the element needs changing or because of high fluid viscosity in cold start conditions 6 2 If visual indicator is fitted and actuates during cold start red button extends 5mm 3 ...

Page 4: ...the filter one and one half turns Open partially the blanking plug 6b in the filter head and drain fluid into a suitable waste receptacle This sequence may be long for high viscosity fluids Replace and torque tighten the blanking plug to 38 ft lb or 54Nm Unscrew and remove cover 3 from tube 2 counter clockwise when viewed from above It will be necessary to use a 1 socket wrench on the hexagon on t...

Page 5: ...ltered outside of the Seller s factory except by Seller or Seller s authorized distributor and then as to the latter only for products which have been assembled by the distributor in accordance with Seller s written instructions Nor shall Seller be liable for a product subjected to misuse abuse improper installation application operation maintenance or repair alteration accident or negligence in u...

Page 6: ...UH219 UH219 Series HIGH PRESSURE FILTERS s e r v i c e instructions 6 2 4 8 6b 3 1 Figure 2 5 7 6 Inlet Not shown on this diagram Not shown on this diagram ...

Page 7: ...AA 4 täyskierteistä reikää syvyys AA 4 trous taraudés de profondeur AA 4 fori completamente filettati profondità AA 4 tapgaten met draad over volle diepte 4st fästhål Gänga Z Min gängdjup AA GG Q Flange Connection Details Flange Code Nominal Tube Size GG Q Z Thread AA E16 1 1 093 2 250 7 16 14 UNC 0 87 G16 1 27 8 mm 57 2 mm M12 x 1 75 22 mm E20 11 4 1 250 2 625 1 2 13 UNC 0 75 G20 11 4 31 8 mm 66 ...

Page 8: ...2008 Printed in England IMSIUH219 Visit us on the web at www pall com Pall Corporation has offices and plants throughout the world in locations including Argentina Australia Austria Belgium Brazil Canada China France Germany India Indonesia Ireland Italy Japan Korea Malaysia Mexico the Netherlands New Zealand Norway Poland Puerto Rico Russia Singapore South Africa Spain Sweden Switzerland Taiwan T...

Reviews: