background image

 

 

 
 
 
 
 
 
 
 
 

 

 

 

Installation 
guidelines

 

www.oxgard.com 

[email protected] 

Tel.+7(812) 366-15-94 

Praktika T-04(K) speedgate

 

 

Summary of Contents for Praktika T-04

Page 1: ...Installation guidelines www oxgard com info oxgard com Tel 7 812 366 15 94 Praktika T 04 K speedgate...

Page 2: ......

Page 3: ...ss control system optional 20 6 1 Card collector description 26 6 2 Connecting power supply 27 6 3 Connecting operating device 28 6 4 Connecting of ACS controller 29 6 5 Installation of proximity card...

Page 4: ...peedgate 4 List of abbreviations PS power supply FA fire alarm RC remote control ACS access control system OD operating device turnstile NC normally connected NO normally opened Speedgate firmware ver...

Page 5: ...sion of side unit depending on passage lane mm 660 900 1140 1500 500 1140 1500 620 107 107 25 Weight of side unit depending on passage lane kg 660 900 110 0 113 0 0 5 Temperature range 0 C operation t...

Page 6: ...1 5 values mentioned at a nominal supply voltage optional to form a passage area required 2 side units i e 2 power supply 12V 5A The manufacturer reserves the right to change the packaging specificati...

Page 7: ...middle units depending on customer requirements Fig 1 General view of speedgate Several speedgates set a required pass zone when mounted in a row In this case side and middle units should be used Fig...

Page 8: ...op view LED panel Display panel of the speedgate is made of artificial stone with an insertion made of acrylic glass Speedgate operating modes are displayed on the panel in the form of mnemonic signs...

Page 9: ...play Remote Control Panel The housing of RC panel is made of polished stainless steel On the front side there are control buttons and LED indicators of RC operational modes Fig 3 The standard supplied...

Page 10: ...ge to human life and health total or partial loss of workability of products and or auxiliary equipment for non compliance of the safety requirements specified in this section as well as terminates th...

Page 11: ...he installation site Before checking operability of the speedgate carefully read this section of the Regulations 4 1 Required equipment Tools used for card reader mounting Electric perforator 20mm dia...

Page 12: ...separate power supply CAUTION During installation of the speedgate prepare conduits for cable routing of CAN bus to connect side units 4 2 1 Prepare horizontal surface at the installation site of spee...

Page 13: ...0 900 mm passage width 4 2 5 Open the box and unpack side units remote control panel with cable lock keys 8 pcs 4 2 6 Route cable of RC panel cable of PS unit cable of CAN Bus and if provided cables o...

Page 14: ...ign together the holes in the lower plate of side unit and anchors in the floor Check the vertical installation in 2 planes If necessary use appropriate steel underlayers for proper installation of th...

Page 15: ...nnection of RC PS and ACS is performed with the use of motherboard Figure 7 shows the location of motherboard at the front of the side unit Fig 7 Location of motherboard on the side unit Figure 8 depi...

Page 16: ...eedgate J1 removed Pulse mode see article 5 3 J1 installed Potential mode see article 5 3 J2 installed Speedgate does not respond to the remote commands Status of the buttons is transmitted to the out...

Page 17: ...oss section Each passage two wings is powered by two sources of 12V DC voltage PS unit shall be selected on the basis of these parameters Also note that an increase in the length of the supplied cable...

Page 18: ...s Marking of contacts 12V CL CH GND Table 4 Marking of PS contacts Contacts marking Wire color 12V Red CL Yellow CH Green GND Blue 5 3 Connecting side units Connecting pattern for two side units is sh...

Page 19: ...ction pattern of side units For normal operation of the entrance with two passages perform the following combine two side units A and C and one middle unit B with two three wire buses CAN 2 first bus...

Page 20: ...erboard 1 is open J4 on the motherboard 4 is closed J4 on the motherboard 3 is open J4 on the motherboard 6 is closed Detailed connection pattern of two units of speedgate is shown in Appendix 6 In or...

Page 21: ...and do not respond to other signals STOP input has medium priority When the input is closed on GND contact the speedgate switches to Stop and does not respond to other signals except AP LEFT and RIGH...

Page 22: ...free passage can be set by control signals to both inputs simultaneously Priorities of LEFT and RIGHT inputs at the switch to the pulse mode remain unchanged Motherboard contains two relay outputs for...

Page 23: ...the remote without controller are regarded by the system as a forced entry To use this connection pattern of speedgate J2 jumpers shall be set on both motherboards of chosen passage Fig 8 When J2 jump...

Page 24: ...t I O1 Left button status 1 0 I O2 Right button status 3 0 I O3 Stop button status 2 Fig 10 I O4 Antipanic button status 4 0 I O1 I O3 outputs show the current status of the RC panel buttons i e trans...

Page 25: ...to ACS controller is shown in Fig 12 In this case the controller controls the speedgate via Left Right and Stop contacts and the antipanic contact is turned on and off with the RC panel Please note t...

Page 26: ...and to the board when PS OD and ACS cables are connected fig 13 The hatch includes a card storage device ATTENTION Card reader is not included in the delivery set Customer can choose reader model suit...

Page 27: ...s performed via card collector board To do this open the hatch with a key Figure 13 depicts the location of the board on the card collector stand Fig 13 General view of the card collector Fig 14 shows...

Page 28: ...consumption is present in the mode of card collection 1 5A Locate the PS unit to be accessible for operator Connect PS cable to the card collector board Connect and contacts of power supply to 12V an...

Page 29: ...tact set Pass Ok and GND contacts Pulse input that receives a signal from OD confirming that the passage was performed The operating principle is based on normally open contacts Passage is detected by...

Page 30: ...cation is shown in Fig 14 6 4 1 Take Card GND contact set signal for collection of guest card Take Card and GND contacts Pulse input that receives a signal from ACS controller allowing the collection...

Page 31: ...to the OD via Let Go contact set see Article 6 3 1 In this case a green arrow indicator on the LED panel turns on Free Pass input of the card collector shall operate in pulse mode activation upon con...

Page 32: ...ide contact set signal for card collection confirmation NC NO and COMM contacts Relay output operating on a dry contact principle which closes opens for 1 second transmitting a confirmation signal of...

Page 33: ...16 and remove the universal bracket for readers 2 Fig 16 6 5 4 Disassemble the reader removing the M3 screw 6 Fig 16 and set its lower part 1 Fig 16 on the bracket using the two M4 screws with nuts w...

Page 34: ...this case the guest and permanent card will be read equally well 6 5 7 Put the cable of reader in the housing of the card collector 6 5 8 CAREFULLY set the LED panel in its original position Tighten...

Page 35: ...Installation guidelines 35 Fig 16 Installation of proximity card reader Fig 17 Recommended option of card reader installation...

Page 36: ...wer supply wire from the PU to the speedgate is not required See Fig 18 Two RC panels can be connected to the same speedgate An important feature of the CAN2 0 bus is the use of 120 Ohm resistors at t...

Page 37: ...Installation guidelines 37 Fig 18...

Page 38: ...OD can be controlled either by ACS controller or by the card collector directly that is why connections 1 and 2 are drawn by dotted lines This scheme features two readers The second reader shall be i...

Page 39: ...nd interface provides a possibility to connect several identical ACS controllers to one reader in parallel ACS controllers are connected to different inputs of the card collector Memory of one of the...

Page 40: ...be a logical development of the block diagram 2 It reduces the cost of installed system For this purpose the controller with two output signals to one input of a reader i e the controller can disting...

Page 41: ...allation guidelines 41 Appendix 3 Location of mounting holes in relation to the overall dimensions of the speedgate Fig 22 Location of mounting holes in relation to the overall dimensions of the speed...

Page 42: ...Praktika T 04 K speedgate 42 Fig 23 Dimensions of speedgate depending on passage lane top view...

Page 43: ...onnections for synchronized operation of wings In order to secure stable operation of the speedgate unit one GND terminal of one unit shall be connected to another GND terminal of another speedgate un...

Page 44: ...Oxgard 192289 Saint Petersburg Sofiyskaya st 66 Tel fax 7 812 366 15 94 www oxgard com info oxgard com...

Reviews: