This document describes how to replace the chassis of a NAS 
N2000 from Overland Storage.

WARNING:  

To reduce the risk of electric shock or damage to 

equipment, always remove any power cords while working 

with the unit.

AVERTISSEMENT:  

Pour réduire le risque de choc électrique 

ou endommagement de l'équipement, retirez toujours les 

cordons électriques en travaillant avec l'appareil.

CAUTION:  

While working with the unit, observe standard 

Electrostatic Discharge (ESD) precautions to prevent damage 

to micro-circuitry or static-sensitive devices.

Prepare the Unit

Power Off and Disconnect

1.

Power off the unit by pressing the 

Power button

 on the 

front of the server for 

no more

 than one second.

While there is no obvious change, the appliance starts its 
shutdown process.

2.

When all the front LEDs are off, disconnect the 

power 

cords

.

3.

Disconnect all remaining 

cables

 from the unit.

Remove the Front Bezel

Remove the 

bezel

 by pressing the latch on the right side, 

pulling the right side away from the unit, and pulling the bezel 
off to the right. 
Set the bezel aside.

Remove the Drives

IMPORTANT:  Overland recommends that you remove the 
drive assemblies to lessen the unit’s weight prior to removal.

NOTE: Do not remove the disk drives from their carriers. Doing so 
voids the drive warranty.

1.

Press the release 

button

 on the right side of the carrier.

2.

Using the built-in 

handle

, pull the drive carrier out.

3.

Number the drive 

and set it on a secure surface.

4.

Repeat 

Steps 1–3

 for 

all

 the remaining drive carriers.

Power

Power

LED

Press

Rack

Screw

Summary of Contents for SnapServer NAS N2000

Page 1: ... pressing the Power button on the front of the server for no more than one second While there is no obvious change the appliance starts its shutdown process 2 When all the front LEDs are off disconnect the power cords 3 Disconnect all remaining cables from the unit Remove the Front Bezel Remove the bezel by pressing the latch on the right side pulling the right side away from the unit and pulling ...

Page 2: ...ut onto the lifter and place it on a secure surface 5 Slide the rails back into the rack 6 Unpack the new chassis and place it on the secure surface next to the old chassis Move the Inner Rails 1 Remove and retain the screw holding a rail to the side of the old chassis 2 Lifting the T latch on the rail slide the rail to the rear and off the tabs on the chassis 3 Slide the rail onto the same side o...

Page 3: ...T To maintain proper airflow and cooling a drive assembly or a blank carrier must be installed in every slot No empty slots are allowed Attach the Bezel Replace the bezel on the front of the unit by inserting the left tabs into the chassis frame and pushing the right side in until it latches clicks Attach Cables and Power Cords 1 Reattach the data cables to the same connections previously used 2 A...

Page 4: ...rt contact htm ts 2 If replication is activated on this appliance activate the Storage Journal drive Refer to the SnapServer Administrator s Guide for complete details a In the SAN Web Manager click the Pools tab b In the Actions list on the left click Set Storage Journal c At the Storage Journal Configuration page select the SCSI drive 80 GB from the list and click Add NOTE If the server was conf...