manualshive.com logo in svg
background image

Part Number 104373-102 05/2008

©2005 - 2008 Overland Storage, Inc.

Page 1 of 4

This document describes how to unpack and set up a new 
NEO 8000 Library. This same information is also found in 
the 

Overland NEO 8000 Library User Guide

.

WARNING:  Due to the weight and size of the library, it 
is recommended that at least two people be involved 
with the unpacking process.

CAUTION:  

Read and become familiar with the entire 

document before starting this unpacking procedure. 
Steps performed out of sequence may cause damage to 
the library which voids existing warranties.

NOTE: Retain all packaging materials in a protected place in 
case the library needs to be shipped to a different location.

Tools Needed

These tools are required to unpack the library:

9/16” wrench

10” adjustable wrench

Level tool

Large flat-blade offset screwdriver

Box knife

#2 Phillips screwdriver

1.

Position

 the shipping container on a level surface with 

adequate clearance to work around it (

Figure 1

).

NOTE: The container pallet is labeled “RAMP SIDE” on each 
corner of the removal side.

Allow at least 10 ft. (3.0m) of clearance on the 
removal side of the container

Allow about 3 ft. (1.0m) of clearance around the other 
three sides of the container

Allow at least 8 ft. (2.5m) of vertical clearance

Figure 1.  Unpacking Space Requirements

 

NEO 8000™ Library

Important Unpacking 

Instructions

Overview & Notes

Removing the Outer Carton

N

EO

-8

11

7`

Ramp (Front)

Floor

Allow at least 10 ft. (3.0m) 

to remove the library 

from the pallet.

Allow 3 ft.
(1.0m) around
the library

Allow 8 ft.
(2.5m) vertical
clearance

Содержание NEO 8000

Страница 1: ...nt location Tools Needed These tools are required to unpack the library 9 16 wrench 10 adjustable wrench Level tool Large flat blade offset screwdriver Box knife 2 Phillips screwdriver 1 Position the shipping container on a level surface with adequate clearance to work around it Figure 1 NOTE The container pallet is labeled RAMP SIDE on each corner of the removal side Allow at least 10 ft 3 0m of ...

Страница 2: ...the Ramp box and lay them down placing the brackets into the corresponding slots in the pallet Figure 4 Figure 4 Placing the Ramps in Position 2 Remove the rear hardware holding the library on the pallet a To provide access to the hold down bolts and leveling legs remove the rear door of the library set aside b Remove the four 4 crossbar screws from the pallet c Remove the rear crossbar Figure 5 F...

Страница 3: ...re moving the library to its final operating position attach the doors 1 Reattach the back door to the rear of the library 2 Remove the two doors from the Door shipping box then remove them from their plastic shipping bags NOTE The square straight end of the door is the top and the curved end is the bottom 3 Locate the bag of nylon washers taped inside one of the doors The washers are used as bear...

Страница 4: ... its operating location 2 Run down all four leveling legs by hand until they contact the floor 3 Using the 10 adjustable wrench turn each leg one after the other in equal increments until you have turned them at least one full turn NOTE Be sure the library has been raised high enough so none of the casters touch the floor 4 Place the level front to rear on the top side edge of the library see Figu...

Отзывы: