manualshive.com logo in svg
background image

Page

 

1 from

 

4

923297000

_005

_09

SPOT LIGHT 

EMERGENCY

 LUMINAIRE WITH WHITE LEDs

MAINTAINED 

OPERATION TEMPERATURE RANGE
RELATIVE HUMIDITY
CONSTRUCTION MATERIAL

EXTERNAL DIAMENTION
WEIGHT

GUARANTEE

OPERATION VOLTAGE

MAXIMUM POWER CONSUMPTION
BATTERY

 (

Ni-MH

)

CHARGE TIME

INDICATIONS - CONTROLS

BATTERY PROTECTION

MINIMUM DURATION

DEGREES OF COVER PROTECTION

PRODUCED IN ACCORDANCE WITH

EMERGENCY ILLUMINATION

LIGHT SOURCE

220-240V AC/50-60Hz

3 h

s

our

24 hours

Discharge and over charge protection

IP40

4.8

1.2

V/

Ah

  

lm 

350lm / 110

  White

 

LEDs

5.9W / 7.3VA

5 t

  o 40  C

o

Up to 95% 

Bayblend FR3010

clear

 

polycarbonate

3 years

 (1 

year for the battery

)

470gr.

Ø125 x 6

5

 mm

EN 60598-1, EN 60598-2-22

, ΕΝ 55015, ΕΝ 61547, ΕΝ 61000-3-2, ΕΝ 61000-3-3

Battery charging LED TEST button

GR-297/60L/180

GENERAL

These  luminaires  are  used  indoors  ta 

 

where emergency light is needed.
E a c h   l u m i n a i r e   m u s t   b e   p e r m a n e n t l y  
connected to mains power supply

.

In normal operation the battery is charging and 
the illumination source, lights

.

In  case  of  a  mains  power  supply  failure  the 
luminaire  will  light  the  illumination  source 
automatically  in  emergency  mode.  When  the   
mains  power  supply  is  restored  the  device 
turns to normal operation.

INSTALLATION

To  install  the  luminaire  follow  the  installation 
instructions on page 2.

ΑΤΤΕΝΤΙΟΝ

!

1.  Operations  for  installation,  maintainance  or 
testing  must  be  done  by  authorized  personel 
only

.

2. 

The device must be connected to the mains 

power  supply  thru  a  fuse  dependent  by  the 
total amount of the line’s  power load

.

3. 

It  is  sugested  to  check  every  month  the 

indication  LED  for  battery  charging,  and  by 
pushing  the  TEST  button  (use  a  pointy  tool 
with    diameter  of  2mm  max.)  to  check  the 
emergency  cirquit.  The  illumination  LEDs 
should  light  as  long  as  the  TEST  button  is 
pressed

4. 

It  is  sugested  to  check  every  6  months  the 

m i n i m u m   a u t o n o n o u s   d u r a t i o n   b y  

o

(

40 C

)

!!

.  In  the  opposite  condition  contact  the 

installer.

 

disconnecting  the  mains  power  supply   Count 
the time that  the luminaire lights and in case of 
less  time  than  the  minimum  autonomous 
duration  the  battery  must  be  replaced.  If  the 
measured  time  is  considerably  less  than  the 
minimum  autonomous  duration 

  In  case  of  battery  or  light  source 

replacement,  these  must  be  replaced  by  parts 
of  the  same  type,  by  the  manufacturer  or  by  a 
competent person.

t i

 

in  battery  recycling 

points. Do not incinerate.

NOTE: 

LED= Light Emitting Diode

LABELING EXPLANATION:
X: 

Self contained

   

1: 

Maintained 

(*) 

A: 

Including test device

  

180: 

3 hour duration

(*)

 

Maintained operation: The luminaire lights its 

illumination  source,  when  it  is  powered  by  the 
mains power supply or not

.

Non-Maintained  operation:  The  luminaire  lights 
its  illumination  source,

 

only  in    power  supply’s 

failure.

.

contact  the 

installer.

5. 

In  case  of  inactive  use  for  a  period  greater 

than 2 months, disconnect the battery by pulling 
out the battery’s connector.

 

6. 

I

s not allowed to discard batteries in to 
common  trash  bins,  they  must  be 
discarded  only 

TECHNICAL CHARACTERISTICS

 FOR LED MODULE SPECS (see page 4)

Thank you for your trust in our products.  

Olympia Electronics -  European manufacturer

.

Содержание GR-297/60L/180

Страница 1: ... thru a fuse dependent by the total amount of the line s power load 3 It is sugested to check every month the indication LED for battery charging and by pushing the TEST button use a pointy tool with diameter of 2mm max to check the emergency cirquit The illumination LEDs should light as long as the TEST button is pressed 4 It is sugested to check every 6 months the m i n i m u m a u t o n o n o u...

Страница 2: ...f the luminaire A For permanent maintained operation B use two wires to power the luminaire Ν for neutral and L for live wire and link the L and L1 as shown in the picture 4 Refit the reflector mind the correct orientation tighten the screw securely and the luminaire is ready for mounting NOTE After finishing the installation you must power the luminaire at least for 24 hours for battery charging ...

Страница 3: ...e mounting Install the luminaire according to the following steps Drill 2 holes on the base using a 4mm drill bit in order to permit the retaining screws to pass Mark these two drilled points on the required mounting location drill the holes and install the supplied plastic plugs Next use the 2 fasteners to install the unit to the require location Step 1 Step 2 Unfasten the retaining screw Figure ...

Страница 4: ... the technical leaflet which accompanies each product This warranty ceases to exist if the buyer does not follow the technical instructions included in official documents given by Olympia Electronics or if the buyer modifies the goods provided or has any repairs or re setting done by a third party unless Olympia Electronics has fully agreed to them in writing Products that have been damaged can be...

Отзывы: