background image

INVENTORY

IMPORTANT! 

Never plug in or turn on unit without liquid in the vessel. Doing so could severely damage the 
unit. Always plug the unit into a GFCI rated outlet. Do not move unit when in use. Sidewalls 
will become hot during use.

ASSEMBLY & PREPARATION

Install bulkhead

1. 

 Remove the nut and collar from the main body. Do not remove the 
o-ring.

2. 

 Feed the main body of the bulkhead, from the inside, through the 
drilled port in the vessel. The o-ring should be pressed against the 
inside of the vessel.

3. 

 Slide the collar, from the outside, onto the main body. Position the 
small notch in the collar so it is facing straight up. The notch indicates 
the curved side of the collar to ensure it sits flush against the 
curvature of the vessel.

4. 

Thread the nut onto the bulkhead and tighten against the collar.

5. 

Thoroughly hand-tighten and if desired, use a wrench to tighten.

6. 

 Apply a few wraps of teflon tape to the external threads of the 
bulkhead before installing the 1/2” NPT ball valve.

7. 

 Insert dip tube into assembly and position pick up as close to bottom 
as possible. 

As seen in the picture above.

Thoroughly clean the interior of the boiler with a cleaner like OneStep or 
PBW. 

Important. 

Do not submerse the boiler. Contact with water can 

destroy the electronics.

Main Body

O-Ring

Collar

Nut

Boiler Wall

Outside

Inside

Main Boiler

EZ Clean

 Kettle Valve Kit 

with Barb

This fully portable electric brew kettle uses a standard 120 volt outlet, enabling you to brew 

anywhere, anytime. A fully integrated digital control and a built in timer ensure that steeping 

grains are always kept at the perfect temperature for the perfect amount of time. Simply set 

the temperature and you are ready to brew! Ditch the stove and create your own custom 

brew cave anywhere you have an outlet!

E L E C T R I C   B R E W   K E T T L E

Reviews: