background image

    

    

    

 

HD-8122 

 

Toilet Partition Installation 

Manual

 

 
 
 
 

PHONE:  866-820-3579 

 

FAX:  866-317-2786 

Summary of Contents for HD-8122

Page 1: ...HD 8122 Toilet Partition Installation Manual PHONE 866 820 3579 FAX 866 317 2786...

Page 2: ...866 820 3579 2 ATTENTION DO NOT MIX FASTENER PACKS EACH FASTENER PACK HAS THE NECESSARY BOLTS BARRELS AND SCREWS TO INSTALL THE RESPECTIVE PANEL PILASTER OR DOOR TORX HEAD BITS ARE PACKED IN THE EXTRA...

Page 3: ...MARK THE PARTITION LAYOUT 6 4 INSTALL THE PANELS 8 5 INSTALL THE WALL PILASTER 5A USING LEVELING DEVICES 10 5B USING SHOE HEEL 12 6 INSTALL THE PILASTERS 14 7 INSTALL THE HEADRAIL 17 8 ATTACH THE DOO...

Page 4: ...RIVER torx head bits supplied FLAT HEAD SCREWDRIVER PHILLIPS HEAD SCREWDRIVER 1 WAY SCREWDRIVER TWO 9 16 OPEN END WRENCHES HAMMER TWO 12 BLOCKS DRILL ROTARY HAMMER DRILL HACKSAW 5 16 CARBIDE TIPPED HA...

Page 5: ...s 2 4 Clear bathrooms to provide workroom Thank you for choosing Columbia Partitions from Partiton Systems Inc We appreciate your business At Partition Systems we strive to provide the industry s best...

Page 6: ...shop drawings See fig 3 1 3 6 Mark and drill holes for the floor fasteners 3 6 1 For leveling devices mark 5 8 in from the end of the pilaster s centered from front to back Drill a 2 deep hole in the...

Page 7: ...www natpart com 866 820 3579 7...

Page 8: ...lide the panel into the wall brackets until the bottom is from the wall 4 3 Drill the bottom bracket hole through the panel with a drill bit and secure with a bolt FA 900 and a barrel FA 950 4 4 Level...

Page 9: ...www natpart com 866 820 3579 9...

Page 10: ...aster and mark the sides and bottom of the headrail on the wall See figure 5A 2 5A 7 Remove the pilaster Using the headrail bracket as a template mark and drill the headrail bracket holes in the wall...

Page 11: ...www natpart com 866 820 3579 11...

Page 12: ...the bracket The side holes of the mounting bracket should be on bottom 5B 5 Mount the headrail bracket to the wall using 1 stainless steel screws FA 801 5B 6 Place the shoe onto the pilaster and plac...

Page 13: ...www natpart com 866 820 3579 13...

Page 14: ...er and secure the pilaster to panel brackets with bolts FA 900 and 5 8 barrels FA 951 6 7 Place the shoe onto the pilaster and place the pilaster onto the leveling device or heel Slide the panel into...

Page 15: ...www natpart com 866 820 3579 15 SEE SHOP DRAWINGS FOR DISTANCE BETWEEN PILASTERS BEFORE FASTENING PILASTERS TO FLOOR...

Page 16: ...8 barrel FA 951 See the notes to determine how many holes to drill 7 5 For in corner and free standing configurations place an end cap and a corner headrail bracket onto the end of the headrail Drill...

Page 17: ...www natpart com 866 820 3579 17...

Page 18: ...ge part 1 See fig 1 8 2 Secure part 2 of the top hinge onto the top of the door with bolts FA 900 and 5 8 barrels FA 951 See fig 1 8 3 Secure part 3 of the bottom hinge onto the bottom of the pilaster...

Page 19: ...position is 15o open For the best installation place the barrel through the hinge On inswing doors the hinge is located on the inside of the stall On outswing doors the hinge is located on the outside...

Page 20: ...Using the latch as a template mark and drill holes through the door 9 3 1 For inswing and outswing doors secure the latch with bolts FA 900 and 5 8 barrels FA 951 9 3 2 For outswing doors secure the...

Page 21: ...www natpart com 866 820 3579 21 Notes For ADA and emergency access doors mount the latch near the top of the keeper so that when in the latched position the door can be lifted and opened...

Page 22: ...www natpart com 866 820 3579 22 10 ADJUSTABLE ALUMINUM PILASTERS...

Page 23: ...www natpart com 866 820 3579 23 11 BOLT AND BARREL SIZES...

Page 24: ...www natpart com 866 820 3579 24 866 820 3579 www natpart com Copyright 2003...

Reviews: