ANTENNA HEATING SYSTEM  

SOA-1022 

 

 

Operating manual  

 

 

 
 
 

 

 
 
 
 
 

Summary of Contents for SOA-1022

Page 1: ...ability Company NPK MORSVYAZAVTOMATICA info unicont com www unicont com 26E Kibalchicha str 192174 St Petersburg Russia Phone 7 812 622 23 10 Fax 7 812 362 76 36 ANTENNA HEATING SYSTEM SOA 1022 Operat...

Page 2: ...2 3 Multipurpose digital repeater DR 209 11 2 4 Junction box 124PW 22 3 INTENDED USE 23 3 1 Operational limitations 23 3 2 Usage preparations 23 3 3 Intended use 23 4 TECHNICAL SERVICE OF THE SYSTEM 2...

Page 3: ...ent and those who have had special training shall be permitted to operate the System according to the applicable regulations In addition to the instructions given in this document the safety regulatio...

Page 4: ...one CSAHS applying Maximum number of connected AHUs to one CSAHS 20 pcs 1 2 Technical specifications Tables 1 5 describe technical specifications of the System and SC Table 1 Main technical specifica...

Page 5: ...rical power supply voltage V frequency Hz 220 50 Max power consumption W 5 25 Operating temperature C 15 to 55 Limiting temperature C 60 to 70 Protection degree IP56 IP22 Weight kg 16 6 17 8 Overall d...

Page 6: ...list of SC included in the System Note Exact quantity of AHU and is defined at delivery and depends on the customer s facilities Table 6 The System components Name Description Notes CSAHS Main standby...

Page 7: ...DR 209 1 pc Junction box 124PW 2 pcs Antenna heating system SOA 1022 Type 4 1 set Antenna heating unit AHU 1 to 20 pcs Type may change depending on size and availability of RF transparent dome Applie...

Page 8: ...brasive cloth 0 06 0 06 m To polish surfaces of the Product in case of paint coating damage 1 6 Marking and sealing The SC have nameplates providing the following information name power supply voltage...

Page 9: ...in and standby power Once the power is supplied corresponding power LED is lighting up green when there is no power LED is not lighting ON LED is lighting green together with one of the power LEDs Rep...

Page 10: ...nna Figure 3 position 2 AHU may be delivered with a dome Figure 3 position 5 and without it Temperature sensors are located near THs to monitor current AHU temperature Figure 3 position 4 Use data con...

Page 11: ...in painted metal casing a port to connect power cable Figure 5 position 3 and interface RS 422 serial ports to connect data cables Figure 5 position 1 and 2 are located on the rear panel under the pr...

Page 12: ...ear panel Controls and colour LCD screen 8 resistive touch screen to display visual data are on the front panel Figure 6 describes a general view of the repeater s front panel Figure 6 Repeater s fron...

Page 13: ...Repeater s software Getting started Once repeater is switched on AHU initialization and operation test occur If all connected AHUs are on the network and operate correctly the display will take the ma...

Page 14: ...Version 1 0 14 Antenna heating system SOA 1022 Figure 8 Main screen view...

Page 15: ...se of error You can see main and standby power indication in the bottom left corner of the main screen If circle indication on the left is green power is available if red not available Press to open a...

Page 16: ...Version 1 0 16 Antenna heating system SOA 1022 Figure 10 Repeater s main menu Menu Figure 11 Menu Table 10 according to Figure 11 describes boxes and buttons of menu...

Page 17: ...Table 11 Description of parameters Parameter Default value AHU name this line appears only while editing one AHU t 20 0 To set up required temperature inside dome tset t 0 0 Heating will switch on whe...

Page 18: ...by the manufacturer s representative while providing primary settings 1 1 2 2 On On If one of the sensors has wrong readings it may be disconnected Calculations consider minimum value from the values...

Page 19: ...y when voltage complies with the preset range or when voltage exceeds the range Button Figure 12 position 7 is used only by the manufacturer s representative while providing primary settings To save t...

Page 20: ...s 5 and 6 in Figure 13 are used to set up current date and time To save the changes in menu and then return to the main screen press Figure 13 position 7 to save the changes in menu and continue worki...

Page 21: ...22 interface cable is not connected or connection is faulty All AHU heating elements are faulty or not connected 1 i2c 2 i2c Both temperature sensors are faulty Both temperature sensors are disconnect...

Page 22: ...g software Both temperature sensors were switched on using software Difference between readings of temperature sensors 2 4 Junction box 124PW is manufactured in metal casing A grounding stud is locate...

Page 23: ...for operation of electric installation and Safety rules for operation of electric installation while testing electrical circuits and insulation resistance 3 2 2 Visual check procedure Before switchin...

Page 24: ...g system SOA 1022 Disconnect the Product in the following order transfer automatic circuit breakers of main and standby power supply CSAHS to down position disconnect external main and standby power s...

Page 25: ...ment in operation The S 1 results are registered in log of operation duty log S 2 works organized and controlled by a person in charge and shall be provided by the staff on equipment in operation S 2...

Page 26: ...in visibility 1 person 5 mins Table 15 CL 2 Operation test To be done Routine Man hours Operation test of the Product 1 transfer automatic circuit breakers of CSAHS to top position 2 make sure that ma...

Page 27: ...f a single bag shall not exceed 1 kg After sealing the packaging joints press out the cover manually to remove excess air from the packaging make sure it is tight and seal the remaining holes Check vi...

Page 28: ...ere not damaged In this case re preservation is carried out in a similar way with preservation Storage time remains the same with the silica gel bags 4 5 Installation and dismantling Use connection di...

Page 29: ...as described in Table 16 Repair of other defects malfunctions shall be carried out only by specialists or authorized representatives of the Manufacturer Table 16 describes possible problems defects an...

Page 30: ...ntrol board No connection with AHU using KP by CAN bus Check connection with KP Touch screen does not respond to taps Touch screen failure Contact the Manufacturer Problems in KP operation Repeater di...

Page 31: ...e conditions 5 to 40 with the concentration of dust oil moisture and aggressive impurities in the air within the required limits for the working areas of production facilities After storage or transpo...

Page 32: ...rtation in sealed and heated compartments sea transportation in dry service spaces The Product must be transported in compliance with transportation rules applicable for each means of transport During...

Page 33: ...n also send an overage equipment unit to the manufacturer for its further disposal Proper disposal of Product components allows avoiding possible negative environmental and health impacts and it also...

Page 34: ...ll not consider damage claims in case of case violation of operating conditions More information about warranty terms you can find on the official site of NPK MSA LLC section Support Address and conta...

Page 35: ...22 APPENDIX MANDATORY OVERALL AND INSTALLATION DIMENSIONS OF THE SC While installing AHU 1 AHU 2 and AHU 3 types with dome leave 150 mm free space from surface B to connect the Product Figure 1 Overal...

Page 36: ...Version 1 0 36 Antenna heating system SOA 1022 Figure 2 Overall and installation dimensions of AHU 2 Figure 3 Overall and installation dimensions of AHU 3...

Page 37: ...37 Version 1 0 Operating manual SOA 1022 Figure 4 Overall dimensions of repeater Figure 5 Overall and installation dimensions of...

Page 38: ...Version 1 0 38 Antenna heating system SOA 1022 While installing CSAHS leave 120 mm free space from surface D to connect the Product Figure 6 Overall and installation dimensions of CSAHS...

Page 39: ...DATORY CONNECTION DIAGRAMS OF THE PRODUCT Figure B 1 Connection diagram of CSAHS to main and standby power supply Figure B 2 Connection diagram of two and more AHUs to power supply provided by CSAHS u...

Page 40: ...Version 1 0 40 Antenna heating system SOA 1022 Figure B 4 Connection diagram of two and more AHUs via CAN Figure B 5 Connection diagram of AHU board to power control board...

Page 41: ...41 Version 1 0 Operating manual SOA 1022 Figure B 6 Connection diagram of AHU power supply Figure B 7 Table of connection...