background image

T

H

E

U

N

I

N

T

E

R

R

U

P

T

I

B

L

E

P

O

W

E R

P R

O V

I D E

R

M G E

U P S  S Y S T E M S

www.mgeups.com

Quick Installation
Startup

Pulsar MX

ModularEasy

Summary of Contents for Pulsar MX ModularEasy

Page 1: ...T H E U N I N T E R R U P T I B L E P O W E R P R O V I D E R M G E U P S S Y S T E M S www mgeups com Quick Installation Startup Pulsar MX ModularEasy ...

Page 2: ...34008130FR AA Page 2 ...

Page 3: ... 3 Unpacking contents check Needed not included Hotswap Parallel D curve 32 A D curve 63 A x 2 x 2 x 2 x 4 67 64 65 62 63 66 ModularEasy 41 43 44 49 40 UPS Pulsar MX RT 46 68 3 x 10 mm2 3 x AWG6 69 3 x 6 mm2 3 x AWG8 70 ...

Page 4: ...08130FR AA Page 4 Possible setups UPS Hotswap Parallel ModularEasy 1 Pulsar MX RT ModularEasy 2 Pulsar MX RT Largest possible setup Parallel 2 x 3 EXB Battery extension 62 40 41 64 66 40 62 40 41 64 66 66 ...

Page 5: ...30FR AA Page 5 Quick installation Step 1 ModularEasy UPS 1 For this step no operations with ModularEasy 2 3 After Step 1 40 M disconnected disconnected 46 disconnected 46 connected 40 M disconnected connected ...

Page 6: ...34008130FR AA Page 6 Step 2 ModularEasy UPS No operation with ModularEasy After Step 2 Hotswap Parallel RS232 CONTACTS BAT NO RPO PARALLEL SWITCHED GROUP 2 SWITCHED GROUP 1 40 63 46 62 40 62 40 40 ...

Page 7: ...130FR AA Page 7 Step 3 ModularEasy UPS 1 2 For this step no operations with UPS 3 After Step 3 Hotswap Parallel 46 62 Normal AC N L 62 68 69 Normal AC Source Output N L 62 N L 69 Output 62 40 62 62 62 40 40 ...

Page 8: ...dularEasy UPS 1 1 2 2 3 3 After Step 4 Hotswap Parallel 62 RS232 CONTACTS BAT NO RPO PARALLEL SWITCHED GROUP 2 SWITCHED GROUP 1 40 UPS 62 N L 70 Modular Easy N L 70 40 UPS N L 62 62 62 70 Modular Easy N L 70 40 62 40 62 62 62 40 40 ...

Page 9: ...RALLEL SWITCHED GROUP 2 SWITCHED GROUP 1 40 65 RS232 CONTACTS BAT NO RPO PARALLEL SWITCHED GROUP 2 SWITCHED GROUP 1 40 RS232 CONTACTS BAT NO RPO PARALLEL SWITCHED GROUP 2 SWITCHED GROUP 1 40 62 RS232 CONTACTS BAT NO RPO PARALLEL SWITCHED GROUP 2 SWITCHED GROUP 1 40 RS232 CONTACTS BAT NO RPO PARALLEL SWITCHED GROUP 2 SWITCHED GROUP 1 40 62 ...

Page 10: ... A Step 7A ModularEasy UPS 1 2 After Step 7A Wait 20 Seconds The equipments are now protected by the UPS 68 ON Only if necessary 62 NORMAL TEST BYPASS ESC I O 21 22 20 29 HOTSWAP UPS 3s ESC I O 34 32 30 20 20s LOAD PROTECTED x xkVA xxx LOADED ONLINE MODE HOTSWAP UPS ...

Page 11: ...34008130FR AA Page 11 Parallel Step 6B Circuit Breaker 63 A Step 7B ModularEasy UPS 1 2 UPS 1 3 UPS 2 68 ON Only if necessary 62 NORMAL TEST BYPASS ESC I O 29 PARALLEL UPS 3s ESC I O 29 PARALLEL UPS 3s ...

Page 12: ...r s manual section 5 page 28 Maintenance See UPS user s manual section 7 page 32 After Step 7B Wait 20 Seconds UPS 1 2 The equipments are now protected by the UPS ESC I O 34 32 30 20 20s LOAD PROTECTED x xkVA xxx LOADED ONLINE MODE xUPS xUPSredundant ...

Page 13: ...34008130FR AA Page 13 ...

Page 14: ...34008130FR AA MGE UPS SYSTEMS T H E U N I N T E R R U P T I B L E P O W E R P R O V I D E R 140 Avenue Jean Kuntzmann ZIRST Montbonnot St Martin 38334 Saint Ismier Cedex France www mgeups com ...

Reviews: