background image

E

D

R4 117

9 G2.16 10/03

1

Summary of Contents for prolift 230T

Page 1: ...EDR4 1179 G2 16 10 03 1...

Page 2: ...release red handle on a rope such that it rests at a height of less than 1 8 m Install any fixed control wired or wireless within sight of the door but away from moving parts and at a height of more...

Page 3: ...n doubt about whether the door is suitable for automation consult Merlin Tilt door clearances The opener has been designed to fit most existing doors The minimum installation clearance from the garage...

Page 4: ...econds 60 seconds and 90 seconds For a 30 second delay autoclose short ON For a 60 second delay autoclose long ON For a 90 second delay both short and long ON NOTE Auto closing will only work if the b...

Page 5: ...se the Chain on the smaller of the two sprockets STEP 5 Thread up the chain The threaded end of the torpedo should now be pointing back toward the power head Additional setup for trackless tilt doors...

Page 6: ...d mark this maximum door height onto the header above the top edge of the door On tilt doors with tracks this maximum height might be as low as the top edge of the closed door If a sectional door tors...

Page 7: ...ener Check that the door does not hit the pole when manually open ing and closing Allow a minimum of 25mm clearance between the top edge of the door and the bottom of the pole Attaching the return pul...

Page 8: ...the straight arm is all that is required on tilting doors Usually the L arm is attached between the door and the straight arm for use with sectional doors You may have to shorten or re drill the door...

Page 9: ...wire to the power head Connect the wire to the two terminals inside the wall control box Mount the box to the wall CAUTION Keep the push button cable at least 60mm clear of mains power cables if it i...

Page 10: ...stay on continuously at the fully closed position The green LED will stay on continuously at the fully open position Identify the green operate button Ensure the door is engaged on the trolley STEP 3...

Page 11: ...trol panel cover STEP 2 Identify the green and the red control knobs marked open force and close force Note The opener can be set to either determine its own safe operating force level or it can be se...

Page 12: ...t s underside Remove the green control panel cover to expose the setup controls Identify the red learn button To learn a remote button to operate the opener Press the learn button for 1 2 seconds unti...

Page 13: ...have several openers that operate from this master remote then all these openers will begin to flash their courtesy lamps Press the button on the master remote that would normally operate the opener...

Page 14: ...t The high level of Infra Red light in bright sunlight may temporar ily prevent normal operation of the opener Switch off the power to the opener Run the pair of cables from each sensor back to the ac...

Page 15: ...le and strapping Trolley speed depending on sprocket and load 75 to 135mm sec Rated force 770N Standard pole length 2750mm to suit chain supplied Standard assembled overall length pole length 400mm 31...

Page 16: ...on Some features or accessories may not be available in certain markets or areas Please check with your distributor Merlin service centres New Zealand Auckland phone 09 415 4393 Phone toll free 0800 6...

Reviews: