manualshive.com logo in svg
background image

P 1

02POP411411-V3-PEFC

POPPY PLAYHOUSE 

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 880514

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

**Protim Aquatan T5 (621)**

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) 

including  a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm 

bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

TIMBER

As with all natural materials, timber can be affected during various weather conditions. 

For the duration of heavy or extended periods of rain, swelling of the wood panels may 

occur. Warping of the wood may also occur during excessive dry spells due to an interior 

moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is 

suggested that the outdoor building is sprayed with water during extended periods of 

warm sunshine and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to protect 

the product during transit and for upto 3 months against mould.  To validate your 

guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated 

with a wood preserver within the first three months of assembly and thereafter in 

accordance with the manufactures recommendations.  Care must be taken to ensure 

the product is placed on a suitable base.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to 

diagrams for the base dimensions,  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run 

off for water. It is also recommended that the floor be at least 25mm above the 

surrounding ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in 

the case of childrens products independently tested to EN71 level, we cannot accept 

responsibility for your safety whilst erecting or using this product.

Refer to the instructions pages for you specific product code

For ease of assembly, you 

will need a tape measure to 

check dimensions of 

components.

WARNING: Only for domestic use

Not suitable for children under 36 month

To be used under direct supervision of an adult

Содержание POPPY PLAYHOUSE

Страница 1: ...welling of the wood panels may occur Warping of the wood may also occur during excessive dry spells due to an interior moisture loss Unfortunately these processes cannot be avoided but can be helped I...

Страница 2: ...mm Fascia Board 12x95x980mm Roof Eave 28x28x1520mm Fascia Block 28x28x340mm Finial Ply Door Stop 22 23 24 25 Felt Wooden Door Handle T hinge L Bracket QTY x2 Window PI 03 0086 PI 07 0011 Window Block...

Страница 3: ...nce you are happy the door is in the correct position place a Hinge No 22 at the top and bottom of the door ensuring the screws will go into the framing and using 30mm black screws fix the hinge to th...

Страница 4: ...o there is equal spacing between the floor and cladding on all 4 sides 9x50mm screws 1 3 Step 6 Place the Ridge Bar No 11 in between the door and plain gable Ensure the top corners of the support bar...

Страница 5: ...each roof sheet 4x30mm screws Pre drill hole 30mm screw 15 Step 9 Once the roof is fixed attach the building to the floor with 50 mm screws 20x50mm screws Pre drill hole 50mm screw Step 10 Cut Felt No...

Страница 6: ...oles to avoid splitting Ensure to the trap the felt between the fascia and building 12x40mm screws Pre drill hole 40mm screw 13 16 13 Step 13 Place a Window Cross No 8 against the inside of each windo...

Страница 7: ...the top groove and push into the top left corner Repeat with a second piece of short beading and fit into the bottom right corner of the lower groove Place the Window Bar B No 19 onto the Window Bar...

Отзывы: