manualshive.com logo in svg
background image

P 1

05DTMBAX0103SD-V1

1X3 T&G GRAND STORE

2mm Drill bit

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All building’s should be 

erected by two adults

For ease of assembly, you 

MUST

 pilot drill all screw 

holes and ensure all screw 

heads are countersunk.

For assistance please contact customer care on: 01636 821215

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

www.merciagardenproducts.co.uk

CAUTION

Every effort has been made during the 

manufacturing process to eliminate the 

prospect of splinters on rough surfaces of the 

timber.  You are strongly advised to wear gloves 

when working with or handling rough sawn 

timber.

Please retain product label and instructions for future reference

             

General Instructions

BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a Phillips screw-

driver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

LOCATION FOR YOUR GARDEN BUILDING

A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance, 

annual treatment and to allow air flow around the building.

Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing 

damage to the building.

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy or 

extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during 

excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be 

helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine 

and sheltered as much as possible during rain or snow. 

Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent 

the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee. 

Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treatment 

to prevent water ingress

Pressure Treated buildings - Require a waterproof treatment to prevent water ingress

Log Cabins - Are supplied untreated and require a preservative and waterproofing treatment.

BUILDING A BASE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual 

treatment.

Ensure the base is level and is built on firm ground, to prevent distortion.  Refer to diagrams for the base dimensions,  

The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap 

the base, creating a run off for water. It is also recommended that the floor be at least 25mm above the surrounding 

ground level to avoid flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens 

products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or 

using this product.

Refer to the instructions pages for your specific product code

*Protim Aquatan T5 (621)**

Your building has been dip treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct 

application of Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and 

garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl 

sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

REGISTER FOR YOUR

ANTI-ROT

GUARANTEE TODAY

PLEASE SCAN HERE:

Содержание 05DTMBAX0103SD-V1

Страница 1: ...ine and sheltered as much as possible during rain or snow Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent the timber from deteriorating and to waterproof it This is required to maintain the anti rot guarantee Dip Treated buildings Require a preservative treatment to protect against rot and decay and a waterproof treatment to preve...

Страница 2: ...ble QTY 1 AI 05S11MBAGP975X1965 V1 Roof Panel QTY 2 AI S11MBOHAR610X580 Floor QTY 1 AI R11MBF552X970 V1 Door QTY 1 AI S11FBMBZBD743X1680 V1 Fascias 12 x 80 x 610mm QTY 4 S1280 610MM Cover Trims 12 x 40 x 1727mm QTY 4 S1240 1727MM Bolt Block 28 x 28 x 160mm QTY 1 FS2828 160MM Finial QTY 2 SHED DIAMOND FINIAL 11 Pad Bolt QTY 1 PI 07 0035 12 T Hinges QTY 3 PI 02 1042 Nail Bag Felt Tacks x 30 30mm Scr...

Страница 3: ...o open Ensure that the screws go through the cladding and into the framing behind 21x30mm Screws Pre drill hole 30mm screw PLEASE NOTE Before fitting the hinges ensure the door is in the correct position depending on which side you want the door to open See external illustration which show the doors internal framing Step 3 Parts needed No 9 QTY 1 No 11 QTY 1 Attach the bolt block No 9 to the insid...

Страница 4: ...r until the roof is fitted 9x50mm Screws 50mm screw Pre drill hole 2 4 Step 6 Parts needed No 4 QTY 2 Place the Roof Panels No 4 on top of the building making sure the framing in the roof panels sits firmly within the Gable Panels No 1 3 Make sure that you have got the roof panels the correct way round with the recess at the top of the apex as shown in the diagram The edges of the roof panel must ...

Страница 5: ...ims No 8 at each corner using 3x30mm screws per trim 12x30mm Screws 30mm screw Pre drill hole Pre drill hole 40mm screw Step 10 Parts needed No 7 QTY 4 No 10 QTY 2 Fix the Fasicas No 7 and finials No 10 in place using 40mm screws Make sure to trap the felt between the fasicas and building 8x40mm Screws 10 10 7 7 7 7 Step 11 Parts needed No 13 QTY 2 Fix the Turn Button No 13 onto the Door Panel No ...

Страница 6: ...P 6 Please retain product label and instructions for future reference It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled ...

Страница 7: ...P 7 2 1 3 4 ...

Страница 8: ... 1 2 REGISTER FOR YOUR ANTI ROT GUARANTEE TODAY PLEASE SCAN HERE ...

Отзывы: