background image

02GARA0806-V1-PEFC

8x6 Garage Playhouse

In all instances for assistance with your product, please contact customer care on :  

01636 880514 or [email protected]

Mercia Garden Products Limited, 

Sutton On Trent, 

Newark, 

Nottinghamshire, 

NG23 6QN

Please retain product label and instructions for future reference

        

General Instructions

BEFORE YOU START PLEASE THE READ INSTRUCTIONS CAREFULLY 

- Check the pack and make sure you have all the parts listed in the parts list provided. 

- When you are ready to start, make sure you have the right tools at hand (not supplied) including  a 

Phillips screwdriver, Flathead screwdriver, Stanley knife, Wood saw, Step ladder, Hammer, Spirit level and 

a Drill with 2mm bit.

- Ensure there is plenty of space and a clean dry area for assembly. 

- Ensure you have enough time to build the product to ensure the building is water tight.

TIMBER

As with all natural materials, timber can be affected during various weather conditions. For the duration 

of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may 

also occur during excessive dry spells due natural processes. Unfortunately, these processes cannot be 

avoided but can be helped. It is suggested that the outdoor building is sprayed with water during 

extended periods of hot weather and sheltered as much as possible during rain or snow. 

Our buildings are pre treated with a water based treatment**; this only helps to prevent discolouration 

whilst in stock.  To validate your guarantee and ensure longevity of the product, it is ESSENTIAL the 

building is treated with a suitable preservative in accordance with the manufacturers recommendations.  

Care must be taken to ensure the product is placed on a suitable base.

We recommended using a suitable protection for your playhouse. As the product is destined for use by 

children, a water based treatment that is 

EN71 tested

 for children is ESSENTIAL.

We also recommend treating the building prior to construction.

POSITIONING YOUR PLAYHOUSE

When thinking about where the building and base is going to be constructed: 

Ensure that there will be access to all sides for maintenance work and annual treatment. 

We recommend a 

minimum space of 2m around a playhouse

, away from any structure or obstructions 

such as fences, garages, houses, overhanging branches, washing lines or electrical wires.

It is recommended that the position of the Playhouse, Slide and Swing is

 not in direct sunlight.

Activity toys such as swings and slides for towers shall not be installed over concrete, asphalt or 

any hard surface.

BUILDING A BASE 

Ensure the base is level and is built on firm ground, to prevent distortion, checking with a spirit level.  

Refer to diagrams for the base dimensions.  The base should be slightly smaller than the external 

measurement of the building, i.e. The cladding should overlap the base, creating a run off for water. It is 

also recommended that the floor be at least 25mm above the surrounding ground level to avoid 

flooding.

TYPES OF BASE

- Concrete 75mm laid on top of 75mm hard-core.

- Slabs laid on 50mm of sharp sand.

- Wooden base.

CAUTION 

Wood is a natural product and can change post manufacture. So despite every effort being 

made to ensure the material used are cut and machined to a clean and smooth finish, care 

must be taken when handling the product and preparing for use by your child.

Any areas of concern, in the play areas, can be rubbed over with sandpaper to achieve a 

smoother finish. Alternatively, call the customer service department who will be happy to 
arrange replacement panels/parts.

 

WARNING 

 ONLY SUITABLE FOR DOMESTIC USE.

• 

TO BE USED UNDER DIRECT SUPERVISION OF AN ADULT.

 THIS PRODUCT SHOULD NOT BE MODIFIED IN ANY WAY. ANY MODIFICATIONS SHOULD BE 

DETERMINED BY THE MANUFACTURER AND CARRIED OUT ACCORDING TO  THE INSTRUCTIONS.

• 

DO NOT ALLOW YOUR CHILD TO PLAY WITH ANY COMPONENT PARTS PRIOR TO ASSEMBLY.

 MAX AGE OF 14 YEARS.

• 

THIS TOY IS FOR OUTDOOR USE ONLY.

• 

USE A WATER BASED TREATMENT THAT IS EN71 TESTED 

!

Whilst all products manufactured  are made to the highest standards of Safety and in the case of childrens products 

independently tested to EN71, we cannot accept responsibility for your safety whilst erecting this product.

x2

Winter = High Moisture = Expansion

Summer = Low Moisture = Contraction

All buildings should be erected by 

atleast two adults.

DO NOT ALLOW 

CHILDREN TO ASSIST.

To prevent damage during 

assembly, you 

MUST

 pilot 

drill all screw holes and 

ensure all screw heads are 

countersunk

.

For ease of assembly, you will 

need a tape measure to check 

dimensions of components.

**Protim Aquatan T

Your building has been treated with 

Aquatan

.

Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct application of 

Aquatan solution and then allowed to dry.

Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and garden buildings.

Aquatan 

undiluted

 contains:

 boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl sulphosuccinat and 

alcohols: 2, 4, 6-trichlorophenol.

WARNING: Only for domestic use

Not suitable for children under 36 months due to 

small parts and danger of falling from heights.

To be used under direct supervision of an adult

www.merciagardenproducts.co.uk      P1

2mm Drill bit

12mm CSK

Summary of Contents for 02GARA0806-V1-PEFC

Page 1: ...hard surface BUILDING A BASE Ensure the base is level and is built on firm ground to prevent distortion checking with a spirit level Refer to diagrams for the base dimensions The base should be slight...

Page 2: ...V1 Fixing Kit 15 16 17 18 19 20 Black Handle 22 25 24 26 27 28 Fascia 12x95x1960mm SR1295 1960mm Fascia Blocks 27x44x423mm F2744 423mm Railing Upright 27x44x1060mm F2744 1060mm Roof Bearer 27x44x1665m...

Page 3: ...s co uk P3 Pre Assembly Before assembling remove the transportation blocks from the bottom of each panel Take care removing the blocks as to not damage the panels Tap with a flat headed screwdriver an...

Page 4: ...o 10 No 12 into the panels that accomodate a window First fix the Window Block to the Window as shown with 1x30mm screw Place the Window into the window hole and fix by screwing though the Window Bloc...

Page 5: ...er door hinge 49x30mm black screws 27 8 2 11 Step 5 Parts needed Place the Bunk Floor No 6 onto the horizontal framing of the Back Panel No 3 and flush with the horizontal framing of the Tall Window p...

Page 6: ...0mm screws 4x30mm screws per bracket 36x30mm screws 30mm screw 30 18 18 18 9 6 30 Step 10 Parts needed To make the Safety Rail secure fix the Railing Upright No 17 into place so that it is flush with...

Page 7: ...p your building Make sure to screw into the framing Make sure the rear of the building is flush with the Roof OSB This will ensure your roof is straight 8x30mm screws 26x40mm screws 30mm screw 40mm sc...

Page 8: ...m screw 27 26 2 3 1 Felt tacks Step 16 Parts needed Roll the Felt No 29 from front to back leaving a 50mm felt overlap to the front back and sides Secure with felt tacks at 100mm intervals Use a final...

Page 9: ...that the following checks and maintenance are carried out at the begin ning of each season as well as at regular intervals during the usage season Check all nuts bolts screws for tightness and tighte...

Reviews: