background image

© Eaton MEDC Ltd 2017

07/17

Technical Manual for the 

Horn - DB1PUL

DB1HP UL

Please note that every care has been taken to ensure the accuracy of our technical manual. We do not, however, accept
responsibility for damage, loss or expense resulting from any error or omission. We reserve the right to make alterations
in line with technical advances and industry standards.

Summary of Contents for DB1PUL

Page 1: ...ote that every care has been taken to ensure the accuracy of our technical manual We do not however accept responsibility for damage loss or expense resulting from any error or omission We reserve the...

Page 2: ...s holding the cover assembly to the base Keep in a safe accessible location Twist the cover gently clockwise and anti clockwise whilst pulling it away from the unit Remove to gain access to the interi...

Page 3: ...16 8mm 5 1 2 140mm FIXING CRS 3 1 8 79mm 6 7 8 175mm DIA 3 1 8 79mm 5 1 2 140mm FIXING CRS 6 3 4 171mm DIA 6 5 8 8 1 2 168mm 216mm 4 1 8 6 105mm 152mm 1 3 16 30mm ALL DIMENSIONS IN INCHES AND MILLIMET...

Page 4: ...mS on 150 mS off 10000 Swedish Fire Alarm 17 Int 660 Hz 1 8 sec on 1 8 sec off 01111 Swedish Fire Alarm 18 Int 660 Hz 6 5 sec on 13 sec off 01110 Swedish Fire Alarm 19 Continuous 660 Hz 01101 Swedish...

Page 5: ...B1 ve red and TB3 ve black tone 1 will sound Reverse the voltage so that TB3 is ve and TB1 is ve tone 2 will sound 3 3 2 Common ve Set Up Connect input wires to TB1 ve and separate ve s to TB3 and TB5...

Page 6: ...when required if the correct voltage is applied to the unit The DC version of the Sounder is designed to operate on a supply voltage tolerance of 20 Under No fault Normal Operating conditions the DB1...

Page 7: ...IL 1 1oo1 SIL 2 1oo2 Random hardware failures h 1 DD DU 6 45E 09 8 87E 08 6 45E 10 8 87E 09 Random hardware failures h 1 SD SU 0 00E 00 1 59E 07 0 00E 00 1 59E 08 PFD PTI 8760Hrs MTTR 8 Hrs 3 89E 04 3...

Page 8: ...ommendations in the user documentation 3 All information associated with any field failures of th dependability management process e g IEC 60300 3 2 an 4 f The unit should be tested at regular interva...

Reviews: